# SHELL PIPELINE CO., L.P. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420165010
- **title:** SHELL PIPELINE CO., L.P. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2016-06-29
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.64(c)(1)(i).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420165010.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420165010.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420165010
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420165010
**body:**

Notice of Probable Violation involving SHELL PIPELINE CO., L.P.. PHMSA's enforcement data identifies the cited regulation as 195.64(c)(1)(i). The case was opened on 2016-06-29 and is reported as closed as of 2016-12-23. Proposed civil penalty: $25,900. Assessed civil penalty: $25,900. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420165010_Final Order_12012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165010/420165010_Final%20Order_12012016.pdf

420165010_Final Order_12012016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165010/420165010_Final%20Order_12012016_text.pdf

420165010_NOPV PCP_06292016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165010/420165010_NOPV%20PCP_06292016.pdf

420165010_NOPV PCP_06292016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165010/420165010_NOPV%20PCP_06292016_text.pdf

420165010_Operator Response to Notice_07282016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165010/420165010_Operator%20Response%20to%20Notice_07282016.pdf

420165010_Final Order_12012016_text.pdf

December 1, 2016
Mr. Greg Smith, President
Shell Pipeline Company, LP
Two Shell Plaza
777 Walker Street
Houston, TX 77002
Re: CPF No. 4-2016-5010
Dear Mr. Smith:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and assesses a civil penalty of $25,900. The penalty payment terms are set forth in the
Final Order. This enforcement action closes automatically upon receipt of payment. Service of
the Final Order by certified mail is deemed effective upon the date of mailing, or as otherwise
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Acting Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. R.M. Seeley, Director, Southwest Region, OPS, PHMSA
Ms. Deborah Price, Integrity & Regulatory Services Manager, Shell Pipeline Company
LP, One Shell Plaza, 910 Louisiana Street, 42nd Floor, Houston, TX 77002
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



CPF No. 4-2016-5010
Page 2
U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Shell Pipeline Company, LP, ) CPF No. 4-2016-5010
)
Respondent. )
____________________________________)
FINAL ORDER
On December 29, 2015, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an on-site pipeline safety inspection of the facilities and records of Shell Pipeline
Company, LP (SPLC or Respondent) in Houston, Texas. SPLC owns and operates seven tank
farms across the United States, and transports more than 1.5 billion barrels of crude oil and refined
products annually through 3,800 pipeline miles across the Gulf of Mexico and five states.1
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated June 29, 2016, a Notice of Probable Violation and Proposed Civil
Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that SPLC
had violated 49 C.F.R. § 195.64(c)(1) and proposed assessing a civil penalty of $25,900 for the
alleged violation.
SPLC responded to the Notice by letter dated July 28, 2016 (Response). The company did not
contest the allegation of violation but provided an explanation of its actions and requested that the
proposed civil penalty be reduced. Respondent did not request a hearing and therefore has waived
its right to one.
FINDING OF VIOLATION
In its Response, SPLC did not contest the allegation in the Notice that it violated 49 C.F.R. Part
195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.64(c)(1), which states:
1 Shell Pipeline Company LP website, available at https://www.shell.us/pipeline (last accessed October 20, 2016).



CPF No. 4-2016-5010
Page 3
§ 195.64 National Registry of Pipeline and LNG Operators.2
(a) . . . .
(c) Changes. Each operator must notify PHMSA electronically through
the National Registry of Pipeline and LNG Operators at
http://opsweb.phmsa.dot.gov, of certain events.
(1) An operator must notify PHMSA of any of the following events
not later than 60 days before the event occurs:
(i) Construction or any planned rehabilitation, replacement,
modification, upgrade, uprate, or update of a facility, other than a section of
line pipe, that costs $10 million or more. If 60 day notice is not feasible
because of an emergency, an operator must notify PHMSA as soon as
practicable;
(ii) Construction of 10 or more miles of a new hazardous liquid pipeline;
or . . .
The Notice alleged that Respondent violated 49 C.F.R. § 195.64(c)(1)(i) by failing to timely notify
PHMSA of its construction project that cost $10 million or more. Specifically, the Notice alleged
that SPLC failed to inform PHMSA of the Nederland Reactivation construction project, totaling
$21 million, sixty days prior to the construction project start date. Instead, SPLC submitted a
construction notification to PHMSA (F-20140415-4643) on April 15, 2014, stating that it planned
to begin work on the project on May 1, 2014. By filing its Nederland Reactivation construction
notification with PHMSA only sixteen days in advance of the reported start date, SPLC violated
the sixty day notice requirement set forth in 49 C.F.R. § 195.64(c)(1)(i). Respondent did not
contest this allegation of violation.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.64(c)(1)(i) by failing to notify PHMSA of the start of the Nederland Reactivation
construction project, costing a total of $21 million, no later than sixty days before construction
began. This finding of violation will be considered a prior offense in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.3 In determining the amount of a civil penalty under 49 U.S.C. § 60122
and 49 C.F.R. § 190.225, I must consider the following criteria: the nature, circumstances, and
gravity of the violation, including adverse impact on the environment; the degree of Respondent’s
2 49 C.F.R. § 195.64 was amended to exclude subsection (c)(1)(iii). See Amdt. 195-100, 80 FR 12762-01, Mar. 11,
2015.
3 On June 30, 2016, PHMSA adjusted the maximum penalties for inflation (81 Fed. Reg. 42564). Pursuant to § 190.223,
any person found to have committed a violation on or after August 1, 2016, is subject to an administrative civil penalty
not to exceed $205,638 for each violation for each day the violation continues, with the maximum administrative civil
penalty not to exceed $2,056,380 for any related series of violations.



CPF No. 4-2016-5010
Page 4
culpability; the history of Respondent’s prior offenses; and any effect that the penalty may have on
its ability to continue doing business; and the good faith of Respondent in attempting to comply
with the pipeline safety regulations. In addition, I may consider the economic benefit gained from
the violation without any reduction because of subsequent damages, and such other matters as
justice may require. The Notice proposed a total civil penalty of $25,900 for the violation cited
above.
Item 1: The Notice proposed a civil penalty of $25,900 for Respondent’s violation of 49 C.F.R.
§ 195.64(c)(1), for failing to timely notify PHMSA of its Nederland Reactivation construction
project, totaling $21 million, within sixty days of the construction project start date. In its
Response, SPLC sets forth three reasons why it believes the penalty should be reduced.
First, SPLC argues that because it submitted the late construction notice to PHMSA, it self-
reported the violation. Therefore, this should change the circumstances of the violation set forth in
the Violation Report and reduce the penalty amount.4 However, SPLC did not proactively inform
PHMSA that it failed to comply with the sixty-day notice requirement set forth in 49 C.F.R.
§ 195.64(c)(1)(i). Instead, it filed a routine construction notice with PHMSA, taking no
affirmative steps to alert PHMSA of its late filing and sixty-day notice violation. PHMSA staff
had to review the notice and calculate the duration between the filing date and the construction
start date to discover that SPLC had violated its sixty day notice requirement. This does not
constitute self-reporting. Further, PHMSA later discovered that the construction project did not
begin on May 1, 2014 as reported by SPLC. Instead, it began one month earlier on April 1,
2014—fourteen days before SPLC filed its construction notice with PHMSA. Not only did the
notice not accurately reflect the status of the Nederland Reactivation construction project, but
SPLC had begun construction at the time of the filing and still did not proactively self-report the
violation. Therefore, I find that the penalty should not be reduced because SPLC did not self-
report the violation to PHMSA.
Second, SPLC argues that the description of the violation in the Violation Report does not reflect
SPLC’s intention not to misrepresent the scope of its Nederland Reactivation construction project
to PHMSA.5 The Violation Report states that the description of work on the notification
submitted by SPLC did not adequately represent the work that was actually performed.6
Specifically, the notification did not identify the installation of two new pumping units at a cost of
approximately $13 million. The Violation Report does not state that this was an intentional
misrepresentation. In its Response, SPLC alleges that it did not fully understand that it was to
provide a complete description of the construction project, including the installation of new
pumps.7 SPLC also argues that this work could be construed as part of the overall “modifications
to the pump station” that was listed on the notice. This argument is without merit. SPLC is an
established operator that has been constructing pipeline facilities for many years. It should know
the difference between modifying existing facilities and constructing new ones. By excluding the
4 Violation Report, at 7.
5 Id. at 4-5.
6 Id. at 4.
7 Respondent’s Response to the Notice (Response), at 1-2.



CPF No. 4-2016-5010
Page 5
construction of two new pump stations in the description of the Nederland Reactivation
construction project, SPLC misrepresented the scope of its project to PHMSA, even if not
intentional.
Third, SPLC argues that the civil penalty should be reduced because there is little precedent for
issuing a fine under this part of the code.8 Section 195.64 is located within Subpart B-Annual,
Accident, and Safety-Related Condition Reporting of Part 195 governing the transportation of
hazardous liquids by pipeline. According to 49 C.F.R. § 190.221, “[w]hen a Regional Director has
reason to believe that a person has committed an act violating 49 U.S.C. 60101 et seq., 33 U.S.C.
1321(j), or any regulation or order issued thereunder, the Regional Director may initiate
proceedings under §§ 190.207 through 190.213 to determine the nature and extent of the
violations and appropriate civil penalties.” In determining the amount of a civil penalty, the
Associate Administrator considers several factors,9 but when there is a clear violation of a
regulatory standard, I do not find grounds to reduce the penalty merely because PHMSA has not
had to issue many violations of this standard in the past. Consequently, I do not find a lack of prior
violations of this standard by other operators is a compelling reason for not issuing a civil penalty,
or reducing the penalty amount, in this case.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $25,900 for violation of 49 C.F.R. § 195.64(c)(1)(i).
Payment of the civil penalty must be made within 20 days of service of this Final Order. Federal
regulations (49 C.F.R. § 89.21(b)(3)) require the payment to be made by wire transfer through the
Federal Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be directed
to: Financial Operations Division (AMK-325), Federal Aviation Administration, Mike Monroney
Aeronautical Center, 6500 S Macarthur Blvd, Oklahoma City, OK 73169. The Financial
Operations Division telephone number is (405) 954-8845. The Financial Operations Division
telephone number is (405) 954-8845.
Failure to pay the $25,900 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to those
same authorities, a late penalty charge of six percent (6%) per annum will be charged if payment is
not made within 110 days of service. Furthermore, failure to pay the civil penalty may result in
referral of the matter to the Attorney General for appropriate action in a district court of the United
States.
Under 49 C.F.R. § 190.243, Respondent has the right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline Safety,
PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a
copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA will accept
petitions received no later than 20 days after receipt of the Final Order by the Respondent,
8 Response, at 2.
9 See 49 C.F.R. § 190.225 (listing out civil penalty assessment considerations the Associate Administrator will consider
and other additional considerations he/she may consider).



CPF No. 4-2016-5010
Page 6
provided they contain a brief statement of the issue(s) and meet all other requirements of 49
C.F.R. § 190.243. The filing of a petition automatically stays the payment of any civil penalty
assessed but does not stay any other provisions of the Final Order, including any required
corrective actions. If Respondent submits payment of the civil penalty, the Final Order becomes
the final administrative decision and the right to petition for reconsideration is waived.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
December 1, 2016
___________________________________ __________________________
Alan K. Mayberry Date Issued
Acting Associate Administrator