# LAKE CHARLES LNG COMPANY, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 420173003M
- **title:** LAKE CHARLES LNG COMPANY, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-02-21
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 191.22, 193.2011, 193.2509, 193.2511(c), 193.2605, 193.2623, 193.2633, 193.2637, 193.2903(c), 193.2911, 193.2917.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420173003m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420173003m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420173003m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420173003M
**body:**

Notice of Amendment involving LAKE CHARLES LNG COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 191.22,  193.2011,  193.2509,  193.2511(c),  193.2605,  193.2623,  193.2633,  193.2637,  193.2903(c),  193.2911,  193.2917. The case was opened on 2017-02-21 and is reported as closed as of 2019-07-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420173003M_Closure Letter_07222019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173003M/420173003M_Closure%20Letter_07222019.pdf

420173003M_Closure Letter_07222019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173003M/420173003M_Closure%20Letter_07222019_text.pdf

420173003M_Notice of Amendment_02212017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173003M/420173003M_Notice%20of%20Amendment_02212017.pdf

420173003M_Notice of Amendment_02212017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173003M/420173003M_Notice%20of%20Amendment_02212017_text.pdf

420173003M_Operator Response to Notice_03222017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173003M/420173003M_Operator%20Response%20to%20Notice_03222017.pdf

420173003M_Closure Letter_07222019_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 22, 2019
Dennis Odum
Vice President of Operations
Lake Charles LNG, LLC
800 E. Sonterra Blvd.
San Antonio, Texas 78258
CPF 4-2017-3003M
Dear Mr. Odum:
On September 15 – 16, 2015, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, conducted an on-
site pipeline safety inspection of the Lake Charles LNG, LLC (Lake Charles) procedures in Lake
Charles, LA. As a result of the inspection, Lake Charles was issued a Notice of Amendment on
February 21, 2017. Lake Charles responded by letter on March 22, 2017, stating that the
procedures revisions identified during the inspection had been addressed. My staff reviewed the
amended procedures and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary. L. McDaniel, P.E
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420173003M_Notice of Amendment_02212017_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 21, 2017
Mr. Dennis Odum
VP, Operations of the South and LNG Divisions
Lake Charles LNG Company, LLC
800 E. Sonterra Blvd
San Antonio, TX 78258
CPF 4-2017-3003M
Dear Mr. Odum:
On September 15 - 16, 2015, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Lake
Charles LNG Company, LLC (Lake Charles LNG, the Operator) procedures.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Lake Charles LNG plans or procedures, as described below:
1. §193.2011 Reporting.
Incidents, safety-related conditions, and annual pipeline summary data for LNG
plants or facilities must be reported in accordance with the requirements of Part
191 of this subchapter.
§191.22 National Registry of Pipeline and LNG Operators.
(a) OPID Request. Effective January 1, 2012, each operator of a gas pipeline, gas
pipeline facility, LNG plant or LNG facility must obtain from PHMSA an Operator
Identification Number (OPID). An OPID is assigned to an operator for the pipeline
or pipeline system for which the operator has primary responsibility. To obtain on
OPID, an operator must complete an OPID Assignment Request DOT Form
PHMSA F 1000.1 through the National Registry of Pipeline and LNG Operators in
accordance with § 191.7.



(b) OPID validation. An operator who has already been assigned one or more OPID
by January 1, 2011, must validate the information associated with each OPID
through the National Registry of Pipeline and LNG Operators at
http://opsweb.phmsa.dot.gov, and correct that information as necessary, no later
than June 30, 2012.
(c) Changes. Each operator of a gas pipeline, gas pipeline facility, LNG plant or
LNG facility must notify PHMSA electronically through the National Registry of
Pipeline and LNG Operators at http:// opsweb.phmsa.dot.gov of certain events.
(1) An operator must notify PHMSA of any of the following events not later than 60
days before the event occurs:
(i) Construction or any planned rehabilitation, replacement, modification, upgrade,
uprate, or update of a facility, other than a section of line pipe, that costs $10 million
or more. If 60 day notice is not feasible because of an emergency, an operator must
notify PHMSA as soon as practicable;
(ii) Construction of 10 or more miles of a new pipeline; or
(iii) Construction of a new LNG plant or LNG facility.
(2) An operator must notify PHMSA of any of the following events not later than 60
days after the event occurs:
(i) A change in the primary entity responsible (i.e., with an assigned OPID) for
managing or administering a safety program required by this part covering pipeline
facilities operated under multiple OPIDs.
(ii) A change in the name of the operator;
(iii) A change in the entity (e.g., company, municipality) responsible for an existing
pipeline, pipeline segment, pipeline facility, or LNG facility;
(iv) The acquisition or divestiture of 50 or more miles of a pipeline or pipeline
system subject to Part 192 of this subchapter; or
(v) The acquisition or divestiture of an existing LNG plant or LNG facility subject
to Part 193 of this subchapter.
(d) Reporting. An operator must use the OPID issued by PHMSA for all reporting
requirements covered under this subchapter and for submissions to the National
Pipeline Mapping System.
At the time of the PHMSA inspection, the Lake Charles LNG procedures did not include
requirements for obtaining and validating an OpID. Lake Charles LNG amended their
procedures after the inspection to address the issue and communicated this to PHMSA by
email dated September 28, 2015. PHMSA found the amended procedures acceptable.
2. §193.2917 Warning Signs
(a) Warning signs must be conspicuously placed along each protective enclosure at
intervals so that at least one sign is recognizable at night from a distance of 30 m
(100 ft.) from any way that could reasonably be used to approach the enclosure.
(b) Signs must be marked with at least the following on a background of sharply
contrasting color: The words "NO TRESPASSING", or words of comparable
meaning.
2



At the time of the PHMSA inspection, the Lake Charles LNG procedures for warning
signs did not include the requirement that the signs be recognizable at night from a
distance of 30m (100ft) and did not require the signs be marked with the words “NO
TRESSPASSING”. Lake Charles LNG amended their procedures after the inspection to
address these issues and communicated this to PHMSA by email dated September 28,
2015. PHMSA found the amended procedures acceptable.
3. §193.2509 Emergency procedures
(a) Each operator shall determine the types and places of emergencies other than
fires that may reasonably be expected to occur at an LNG plant due to operating
malfunctions, structural collapse, personnel error, forces of nature, and activities
adjacent to the plant.
(b) To adequately handle each type of emergency identified under paragraph (a) of
this section and each fire emergency, each operator must follow one or more
manuals of written procedures. The procedures must provide for the following:
(1) Responding to controllable emergencies, including notifying personnel and using
equipment appropriate for handling the emergency.
(2) Recognizing an uncontrollable emergency and taking action to minimize harm to
the public and personnel, including prompt notification of appropriate local officials
of the emergency and possible need for evacuation of the public in the vicinity of the
LNG plant.
(3) Coordinating with appropriate local officials in preparation of an emergency
evacuation plan, which sets forth the steps required to protect the public in the
event of an emergency, including catastrophic failure of an LNG storage tank.
(4) Cooperating with appropriate local officials in evacuations and emergencies
requiring mutual assistance and keeping these officials advised of:
(i) The LNG plant fire control equipment, its location, and quantity of units located
throughout the plant;
(ii) Potential hazards at the plant, including fires;
(iii) Communication and emergency control capabilities at the LNG plant; and,
(iv) The status of each emergency.
At the time of the PHMSA inspection, the Lake Charles LNG procedures did not include
adequate requirements for emergency coordination with public officials, particularly
ensuring that their reliance on local firefighting agencies was fully planned. This
included confirming the firefighting agencies had adequate equipment and training to
respond to an emergency at the LNG facility and for the preparation of an emergency
evacuation plan. Lake Charles LNG amended their procedures after the inspection to
address these issues and communicated this to PHMSA by email dated September 28,
2015. PHMSA found the amended procedures acceptable.
3



4. §193.2511 Personnel safety
(c) Each LNG plant must be equipped with suitable first-aid material, the location
of which is clearly marked and readily available to personnel.
At the time of the PHMSA inspection, the Lake Charles LNG procedures did not specify
the locations and types of equipment to be included at each location. Lake Charles LNG
amended their procedures ater the inspection to address these issues and communicated
this to PHMSA by email dated September 28, 2015. PHMSA found the amended
procedures acceptable.
5. §193.2623 Inspecting LNG storage tanks
Each LNG storage tank must be inspected or tested to verify that each of the
following conditions does not impair the structural integrity or safety of the tank:
a) Foundation and tank movement during normal operation and after a major
meteorological or geophysical disturbance.
(b) Inner tank leakage.
(c) Effectiveness of insulation.
(d) Frost heave.
At the time of the PHMSA inspection, the Lake Charles LNG Technical Procedures
Manual 7.11 included inspection requirements for structural integrity and leakage but did
not include the inspection intervals. Lake Charles LNG agreed to amend their
procedures after the inspection to address this issue and communicated this to PHMSA
by email dated September 28, 2015. PHMSA requested a copy on May 27, 2016 that had
been implemented by Lake Charles LNG using their Management of Change process.
PHMSA found the amended procedures acceptable.
6. §193.2633 Interference currents
(a) Each component that is subject to electrical current interference must be
protected by a continuing program to minimize the detrimental effects of currents.
(b) Each cathodic protection system must be designed and installed so as to
minimize any adverse effects it might cause to adjacent metal components.
(c) Each impressed current power source must be installed and maintained to
prevent adverse interference with communications and control systems.
At the time of the PHMSA inspection, the Lake Charles LNG procedures did not include
requirements for testing and protecting pipelines and components from interference
currents. Lake Charles LNG agreed to amend their procedures after the inspection to
include a new Technical Procedure 8.13, “Interference Current Inspection” and
communicated this to PHMSA by email dated September 28, 2015. PHMSA found the
amended procedures acceptable.
4



7. §193.2637 Remedial measures.
Prompt corrective or remedial action must be taken whenever an operator learns by
inspection or otherwise that atmospheric, external, or internal corrosion is not
controlled as required by this subpart.
§193.2605 Maintenance procedures.
(a) Each operator shall determine and perform, consistent with generally accepted
engineering practice, the periodic inspections or tests needed to meet the applicable
requirements of this subpart and to verify that components meet the maintenance
standards prescribed by this subpart.
(b) Each operator shall follow one or more manuals of written procedures for the
maintenance of each component, including any required corrosion control. The
procedure must include:
(1) The details of the inspections or tests determined under paragraph (a) of this
section and their frequency of performance; and
(2) A description of other actions necessary to maintain the LNG plant according to
the requirements of this subpart.
(c) Each operator shall include in the manual required by paragraph (b) of this
section instructions enabling personnel who perform operation and maintenance
activities to recognize conditions that potentially may be safety-related conditions
that are subject to the reporting requirements of §191.23 of this subchapter.
At the time of the PHMSA inspection, the Lake Charles LNG procedures did not specify
time frames for addressing any deficiencies found in atmospheric corrosion control.
Lake Charles LNG agreed to amend their procedures after the inspection, and revised
paragraphs 8.2.3, 8.2.4, and Appendix A of Technical Procedure 8.2 “Atmospheric
Corrosion Control” to address the time frames. PHMSA found the amended procedures
acceptable.
8. §193.2911 Security lighting
Where security warning systems are not provided for security monitoring under
§193.2913, the area around the facilities listed under §193.2905(a) and each
protective enclosure must be illuminated with a minimum in service lighting
intensity of not less than 2.2 lux (0.2 ftc) between sunset and sunrise.
At the time of the inspection, the Lake Charles LNG security lighting procedures did not
include the requirement that for each protective enclosure where a warning system is not
provided, the area must be illuminated with a minimum in service lighting intensity of
not less than 2.2 lux (0.2 ftc) between sunset and sunrise. Lake Charles LNG agreed to
amend their procedures after the inspection and developed a new Maintenance Procedure
124, “Perimeter Lighting and Warning Signs” to address the requirements. PHMSA
found the amended procedures acceptable.
5



9. §193.2903 Security procedures
Each operator shall prepare and follow one or more manuals of written procedures
to provide security for each LNG plant. The procedures must be available at the
plant in accordance with §193.2017 and include at least:
(c) A brief description of the duties associated with each security personnel position
or responsibility.
At the time of the inspection, the Lake Charles LNG procedures did not address the
specific responsibilities of security personnel during an emergency. Lake Charles LNG
agreed to amend their Emergency Response Manual to address this issue and added
paragraph 3.8 to the Facility Security Plan specifying the responsibilities of security
personnel during an emergency. PHMSA found the amended procedures acceptable.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within [number of days] days of receipt of this Notice. This
period may be extended by written request for good cause. Once the inadequacies identified
herein have been addressed in your amended procedures, this enforcement action will be closed.
6



It is requested (not mandated) that Lake Charles LNG maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to R. M. Seeley, Director, Southwest, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 4-2017-3003M and, for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
R. M. Seeley
Director, Southwest
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
7