# FRONTIER ENERGY SERVICES, L.L.C. — Notice of Amendment

- **operation:** document
- **citation:** CPF 420175018M
- **title:** FRONTIER ENERGY SERVICES, L.L.C. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-05-03
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.50(b)(2), 195.52(a), 195.52(b)(6), 195.52(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420175018m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420175018m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420175018m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420175018M
**body:**

Notice of Amendment involving FRONTIER ENERGY SERVICES, L.L.C.. PHMSA's enforcement data identifies the cited regulations as 195.50(b)(2),  195.52(a),  195.52(b)(6),  195.52(d). The case was opened on 2017-05-03 and is reported as closed as of 2018-08-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420175018M_Closure Letter_08102018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175018M/420175018M_Closure%20Letter_08102018.pdf

420175018M_Closure Letter_08102018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175018M/420175018M_Closure%20Letter_08102018_text.pdf

420175018M_Notice of Amendment_05032017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175018M/420175018M_Notice%20of%20Amendment_05032017.pdf

420175018M_Notice of Amendment_05032017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175018M/420175018M_Notice%20of%20Amendment_05032017_text.pdf

420175018M_Operator_Response_to_Notice_05122017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175018M/420175018M_Operator_Response_to_Notice_05122017.pdf

420175018M_Closure Letter_08102018_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 10, 2018
Robert Shain
Senior Vice President of Engineering
Frontier Energy Services, LLC
4200 E. Skelly Drive, Suite 400
Tulsa, OK 74135
CPF 4-2017-5018M
Dear Mr. Shain:
On February 6, 2017, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, inspected Frontier
Energy Services, LLC’s procedures for notification of accidents to PHMSA and the National
Response Center. As a result of the inspection, Frontier Energy Services, LLC was issued a Notice
of Amendment on May 3, 2017, which proposed amendment of your procedures.
Frontier Energy Services, LLC submitted notification D-20170222-14510 to PHMSA on February
22, 2017. This notification informed PHMSA of Frontier Energy Services, LLC’s divestiture from
all PHMSA-regulated pipeline assets and requested deactivation of their Operator Identification
Number. As a result, PHMSA has determined that the proposed amendments are no longer
relevant.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420175018M_Notice of Amendment_05032017_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 3, 2017
Robert Shain
Senior Vice President of Engineering
Frontier Energy Services, L.L.C.
4200 E. Skelly Drive, Suite 400
Tulsa, Oklahoma 74135
CPF 4-2017-5018M
Dear Mr. Shain:
On February 6, 2017, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Frontier
Energy Services LLC’s procedures for notification of accidents to PHMSA and the National
Response Center.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Frontier’s plans or procedures, as described below:
1. §195.50 Reporting Accidents.
An accident report is required for each failure in a pipeline system subject to this part in
which there is a release of the hazardous liquid or carbon dioxide transported resulting
in any of the following:
(b) Release of 5 gallons (19 liters) or more of hazardous liquid or carbon dioxide,
except that no report is required for a release of less than 5 barrels (0.8 cubic meters)
resulting from a pipeline maintenance activity if the release is:
(2) Not one described in §195.52(a)(4)



Frontier’s emergency response procedure contains an incorrect definition of a reportable accident
as described in §195.50(b)(2). Frontier’s written definition of an accident (Liquid Pipeline
Operations, Maintenance & Emergency Manual, Section 19.6 Accident Definition, Page 19-5)
provides an exclusion under 19.6 2B for a condition that does require notification. Frontier’s
procedures 19.6 2B excludes reporting for a leak which meets the description in §195.52(a)(4) for
“any failure that resulted in pollution of any stream, river, lake reservoir, or other similar body of
water that violated applicable water quality standards…” Frontier must modify their procedures to
eliminate the incorrect exception.
2. §195.52 Immediate notice of certain accidents
(a) Notice requirements. At the earliest practicable moment following discovery, of a
release of the hazardous liquid or carbon dioxide transported resulting in an event
described in §195.50, but no later than one hour after confirmed discovery, the
operator of the system must give notice, in accordance with paragraph (b) of this
section of any failure that:
(1) Caused a death or a personal injury requiring hospitalization;
(2) Resulted in either a fire or explosion not intentionally set by the operator;
(3) Caused estimated property damage, including cost of cleanup and recovery,
value of lost product, and damage to the property of the operator or others, or
both, exceeding $50,000;
(4) Resulted in pollution of any stream, river, lake, reservoir, or other similar
body of water that violated applicable water quality standards, caused a
discoloration of the surface of the water or adjoining shoreline, or deposited a
sludge or emulsion beneath the surface of the water or upon adjoining
shorelines; or
(5) In the judgment of the operator was significant even though it did not meet
the criteria of any other paragraph of this section.
Frontier’s emergency response procedure includes an incorrect definition of accidents requiring
an immediate notification. Frontier’s written telephonic notification procedure (Liquid Pipeline
Operations, Maintenance & Emergency Manual, Section 19.12, Page 19-11) includes a definition
of an accident requiring immediate notification that does not meet the requirements of §195.52(a).
Specifically, it does not require notification in the event of an injury requiring hospitalization, nor
notification in the event of water pollution as described in §195.52(a)(4).
3. §195.52 Immediate notice of certain accidents
(b) Information required. Each notice required by paragraph (a) of this section must
be made to the National Response Center either by telephone to 800-424-8802 (in
Washington, DC, 202-267-2675) or electronically at http://www.nrc.uscg.mil and
must include the following information:
(6) Initial estimate of amount of product released in accordance with paragraph
(c) of this section
2



4. Frontier’s written telephonic notification procedure (Liquid Pipeline Operations, Maintenance &
Emergency Manual, Section 19.12, Page 19-11) does not include the requirement to provide an
initial estimate of the amount of product released. The procedure does not specify that the
telephonic notification provide an initial estimate as required by 195.52(b)(6), nor does it reference
a written procedure to estimate the amount of product released.
§195.52 Immediate notice of certain accidents
(d) New information. Within 48 hours after the confirmed discovery of an accident, to
the extent practicable, an operator must revise or confirm its initial telephonic
notice required in paragraph (b) of this section with a revised estimate of the
amount of product released, location of the failure, time of the failure, a revised
estimate of the number of fatalities and injuries, and all other significant facts that
are known by the operator that are relevant to the cause of the accident or extent
of the damages. If there are no changes or revisions to the initial report, the
operator must confirm the estimates in its initial report.
Frontier’s written telephonic notification procedure (Liquid Pipeline Operations, Maintenance &
Emergency Manual, Section 19.12, Page 19-11) does not include the requirement to revise or
confirm their initial telephonic notice within 48 hours of discovery.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
3



It is requested (not mandated) that Frontier Energy Services LLC maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Terri J. Binns, Acting Director,
Southwest Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 4-2017-5018M and, for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Terri J.Binns
Acting Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
4
- **truncated:** false
- **body characters:** 10540
