# DCP MIDSTREAM — Notice of Amendment

- **operation:** document
- **citation:** CPF 420175029M
- **title:** DCP MIDSTREAM — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-08-07
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.202, 195.402(a), 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420175029m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420175029m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420175029m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420175029M
**body:**

Notice of Amendment involving DCP MIDSTREAM. PHMSA's enforcement data identifies the cited regulations as 195.202,  195.402(a),  195.402(c)(3). The case was opened on 2017-08-07 and is reported as closed as of 2017-09-08. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420175029M_Closure Letter_09082017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175029M/420175029M_Closure%20Letter_09082017.pdf

420175029M_Closure Letter_09082017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175029M/420175029M_Closure%20Letter_09082017_text.pdf

420175029M_Notice of Amendment_08072017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175029M/420175029M_Notice%20of%20Amendment_08072017.pdf

420175029M_Notice of Amendment_08072017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175029M/420175029M_Notice%20of%20Amendment_08072017_text.pdf

420175029M_Operator Response to Notice (Amended Procedures)_09072017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420175029M/420175029M_Operator%20Response%20to%20Notice%20(Amended%20Procedures)_09072017.pdf

420175029M_Closure Letter_09082017_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 8, 2017
Mr. Brent Backes
DCP Midstream
General Counsel and Vice President
370 17th Street, Suite 2500
Denver, CO 80202
CPF 4-2017-5029M
Dear Mr. Backes:
On August 7, 2017, the Pipeline and Hazardous Materials Safety Administration issued to DCP
Midstream (DCP), a Notice of Amendment which proposed amendment of your procedures.
DCP submitted its amended procedures on September 7, 2017. My staff reviewed the amended
procedures, and it appears that inadequacies outlined in this Notice of Amendment have been
corrected.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Frank Causey
Acting Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420175029M_Notice of Amendment_08072017_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 7, 2017
Mr. Brent Backes
DCP Midstream
General Counsel and Vice President
370 17th Street, Suite 2500
Denver, CO 80202
CPF 4-2017-5029M
Dear Mr. Backes:
On multiple dates between the months of May and December of 2016, representatives of the
Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49
United States Code inspected the DCP Midstream (DCP) procedures for operations, maintenance,
integrity management and emergency response in Houston, Texas.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
DCP’s plans or procedures, as described below:
1. §195. 402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.



DCP’s written procedure, B-01, Section 5 does not include a process to calculate a reasonable
initial estimate of the amount of released product and a written procedure for submitting additional
telephonic reports when new information becomes available as required by §195.52 (c) and (d).
2. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
DCP’s procedure IP-005, is inadequate and fails to identify permissible repair methods for each
type of defect.
During the inspection DCP provided IP-005: Pipe Repair procedure which states, “allowable repair
methods: Allowable repair methods are detailed in the Liquid O&M Manual Procedure F-20
Pipeline Repairs, Gas O&M Manual Procedure M-05 Pipeline Repairs, and the DCP
Midstream Required Practice, Pipeline Repair and Lowering”.
The PHMSA inspector reviewed Pipeline Repair and Lowering - required practice that describes
the methods and requirements for the repair of all hydrocarbon pipelines (September 2012) and
Table 1: Repair Matrix within this required practice and this procedure is not adequate.
DCP provided revised procedure (June 2016). Based on review of this procedure, it appears that it
met the requirement.
3. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.
2



During the inspection, the PHMSA inspector reviewed DCP’s pressure testing procedures (Section
E) and IP-016 (SCC Susceptibility Analysis). IP- 016, Section 2.4.2 states,
Lines on which Noteworthy SCC Has Been Found
The response requirements for lines on which noteworthy SCC has been found are more
stringent than those for lines without noteworthy SCC, as shown in Figure 4.
SCC Assessments
Depending on the severity of SCC found, one of several responses is required: a spike
hydrostatic test, an in-line inspection, or SCCDA.
 Lines that have experienced an in-service rupture are automatically assigned a
Very High SCC susceptibility rating. These lines require an immediate pressure
reduction and a spike hydrostatic test. Where practical, the spike test should be
completed within 90 days of the release. These lines shall be placed in a
hydrostatic retest program for future management of SCC.
 For other lines with a Very High SCC susceptibility rating, an immediate pressure
reduction and a spike hydrostatic test is also required.
 For lines with a High SCC susceptibility rating, a pressure reduction is optional
and the line requires either a spike hydrostatic test or an in-line inspection with a
tool capable of reliably detecting and sizing SCC.
 For lines with a Medium SCC susceptibility rating, SCCDA is required.
 For lines with a Low SCC susceptibility rating, no additional SCC integrity
assessment is required until the next SCC susceptibility assessment.
And, section 2.7: Reassessment intervals states: The SCC Project Manager in conjunction with the
SCC SME is responsible for setting a reassessment interval for all segments with a Very High or
High susceptibility. The reassessment interval may be based on the expected remaining life of
SCC that may still exist on the line with a suitable factor of safety.
Error! Reference source not found., taken from ASME B31.8S Appendix A-3, can be used to
establish reassessment intervals. Other methods of estimating the remaining life may be used if
justified by an engineering analysis. Consideration may be given to shorter reassessment intervals
for lines that have not been previously pressure tested using a spike test or in-line inspected using
a crack detection tool.
When the PHMSA inspector requested DCP to provide the guidance or instruction on how to
perform Spike test, the operator provided Section E, Pressure Testing. Based on review of the
pressure testing procedures, DCP failed to include “Spike Test”.
4. §195. 402 Procedural manual for operations, maintenance, and emergencies
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
3



maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
During the inspection, the PHMSA inspectors reviewed DCP’s H-11: Electrical Isolation and
determined the process does not provide adequate direction to personnel to protect the pipeline
against damage from fault currents or lightning and take protective measures at insulating devices.
5. §195.202 Compliance with specifications or standards.
Each pipeline system must be constructed in accordance with comprehensive written
specifications or standards that are consistent with the requirements of this part.
DCP does not give detailed information on what precautions must be taken to minimize damage
to coating used for bores and directional drills.
DCP’s CORR-2160 procedure is inadequate.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within [number of days]
days of receipt of this Notice. This period may be extended by written request for good cause.
Once the inadequacies identified herein have been addressed in your amended procedures, this
enforcement action will be closed.
It is requested (not mandated) that DCP Southern Hills maintain documentation of the safety
4



improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Jon Manning, Acting Director, SW Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please refer
to CPF 4-2017-5029M and, for each document you submit, please provide a copy in electronic
format whenever possible.
In regard to Item 2 listed above, DCP Southern Hills updated Pipeline Repair and Lowering – The
Required Practice (RP) and provided in June 2016. After considering the material provided,
PHMSA deemed the modifications to be adequate.
Sincerely,
Frank Causey
Acting Director, SW Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
5
- **truncated:** false