# OSAGE PIPE LINE COMPANY, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 420185020M
- **title:** OSAGE PIPE LINE COMPANY, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-10-12
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(5), 195.402(d)(1), 195.402(d)(2), 195.402(d)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420185020m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420185020m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420185020m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420185020M
**body:**

Notice of Amendment involving OSAGE PIPE LINE COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(5),  195.402(d)(1),  195.402(d)(2),  195.402(d)(3). The case was opened on 2018-10-12 and is reported as closed as of 2019-10-17. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420185020M_Closure Letter_10172019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185020M/420185020M_Closure%20Letter_10172019.pdf

420185020M_Closure Letter_10172019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185020M/420185020M_Closure%20Letter_10172019_text.pdf

420185020M_Notice of Amendment_10122018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185020M/420185020M_Notice%20of%20Amendment_10122018.pdf

420185020M_Notice of Amendment_10122018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185020M/420185020M_Notice%20of%20Amendment_10122018_text.pdf

420185020M_Operator Response to Notice_12102018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185020M/420185020M_Operator%20Response%20to%20Notice_12102018.pdf

420185020M_Notice of Amendment_10122018_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 12, 2018
Mark Cunningham
Senior Vice President, Engineering and Technical Services
Holly Energy Partners – Operating, L.P.
2828 N Harwood Suite 1300
Dallas, Texas 75201
CPF-4-2018-5020M
Dear Mr. Cunningham:
From November 27, 2017 to March 23, 2018, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected Osage Pipeline’s Pipeline Safety Manual for operations and maintenance in Artesia,
New Mexico.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Osage’s plans or procedures, as described below:
1. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.



Osage Pipeline’s Procedures were found to be inadequate for conducting normal operations and
maintenance, and handling abnormal operations and emergencies. Throughout Osage’s Pipeline
Safety Manual, the procedures replicate and paraphrase the regulations and reference the
regulations instead of their own processes and procedures. Osage’s procedures must be amended
to be more specific to the Osage Pipeline system to provide adequate details and not paraphrase
the regulations for conducting normal operations and maintenance activities.
The following sections of Osage’s Pipeline Safety Manual must be amended:
1. Section A. HEP-B-195.55-002 Safety Related Condition Reporting to meet the requirements
of §195.55 Reporting safety-related conditions. Osage’s procedures closely replicate and
paraphrase the regulations and do not include details specific to the Osage Pipeline system.
Osage’s procedures should include Operator specific guidance on identifying and reporting safety
related conditions, and not replicate or paraphrase the regulations.
2. Section A. HEP-B-195.58-002 Report Submission Requirements to meet the requirements of
§195.58 Report submission requirements. Osage’s procedure replicates the regulations and do not
include adequate guidance to submit safety related condition reports to PHMSA. Osage’s
procedures must be amended to be more specific to their actual procedure for submitting safety
related condition reports, provide adequate guidance, and not replicate the regulations.
3. Section 195.61 National Pipeline Mapping System to meet the requirements of §195.61
National Pipeline Mapping System (NPMS). Osage’s procedure replicates the regulations and do
not include guidance to provide data to the National Pipeline Mapping System. Osage’s
procedures must be amended to be more specific for submitting Osage specific data to NPMS and
not replicate the regulations.
4. Section 7.1.1.1 Maximum Operating Pressure to meet requirements of §195.406 Maximum
operating pressure. Osage’s procedures closely replicate and paraphrase the regulations and do
not include details specific to the Osage Pipeline system. Osage’s procedures must be amended
to provide specific guidance regarding operating at the maximum operating pressure, and not
replicate the regulations.
2. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(5) Analyzing pipeline accidents to determine their causes.
Osage Pipeline’s procedures were found to be inadequate and must be amended to ensure that the
Pipeline Safety Manual includes procedures for analyzing pipeline accidents to determine their
causes. The PHMSA Inspector reviewed Pipeline Safety Manual Section A: HEP-B-195.50-002–
Accident Report Criteria, Section A: HEP-B-195.60-0002: Operator Assistance in Accident
Investigation, and Section 4.2: Emergencies, paragraph 4.2.4. These sections of the Pipeline
2



Safety Manual did not include a detailed procedure for analyzing pipeline accidents to determine
the root cause of the accident. The PHMSA Inspector also reviewed Form HSE-DOC-020 Incident
Investigation and Report Form. The Operator stated that Form HSE-DOC-020 was used to
document root cause analysis for accidents, but this form appears to be a health and environmental
safety investigation and reporting form, and does not appear to be adequate to document the results
of a root cause analysis of a pipeline accident.
3. §195.402 Procedural manual for operations, maintenance, and emergencies.
(d) Abnormal operation. The manual required by paragraph (a) of this section must
include procedures for the following to provide safety when operating design limits
have been exceeded:
(1) Responding to, investigating, and correcting the cause of:
(i) Unintended closure of valves or shutdowns;
(ii) Increase or decrease in pressure or flow rate outside normal operating
limits;
(iii) Loss of communications;
(iv) Operation of any safety device;
(v) Any other malfunction of a component, deviation from normal operation,
or personnel error which could cause a hazard to persons or property.
Osage Pipeline’s procedures were found to be inadequate and must be amended to ensure that the
Pipeline Safety Manual includes procedures for the abnormal operating conditions (AOCs) listed
in §195.402(d)(1) to provide safety when operating design limits have been exceeded. The
PHMSA Inspector reviewed Section 4.1: Abnormal Operation of the Pipeline Safety Manual,
Paragraph 4.1.2: Procedures to follow when abnormal operations occur. This part of the Pipeline
Safety Manual lists the four AOCs listed in the code, and steps to take in the event they occur. The
steps listed are generic and the same for all listed AOCs. These procedural steps should be tailored
to respond to each specific AOC.
4. §195.402 Procedural manual for operations, maintenance, and emergencies.
(d) Abnormal operation. The manual required by paragraph (a) of this section must
include procedures for the following to provide safety when operating design limits
have been exceeded:
(2) Checking variations from normal operation after abnormal operation has
ended at sufficient critical locations in the system to determine continued integrity
and safe operation.
(3) Correcting variations from normal operation of pressure and flow equipment
and controls.
3



Osage Pipeline’s procedures were found to be inadequate and must be amended to ensure that the
Pipeline Safety Manual includes procedures for checking and correcting variations from normal
operations. The PHMSA Inspector reviewed Section 4.1: Abnormal Operation of the Pipeline
Safety Manual, Paragraph 4.1.2: Procedures to follow when abnormal operations occur. This part
of the Pipeline Safety Manual lists the four AOCs listed in the code, and steps to take in the event
they occur. For each AOC, step (b) Investigate the cause, there is a generic statement that is
verbatim to the code section §195.402(d)(2). The procedure for checking and correcting variations
from normal operation should be specific to the AOC listed.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
4



It is requested (not mandated) that Osage Pipeline maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Mary McDaniel, Director, Southwest Region, Pipeline
and Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF-4-2018-5020M and, for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
5

420185020M_Closure Letter_10172019_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 17, 2019
Mark Cunningham
Senior Vice President – Operations and Engineering
Holly Energy Partners – Operating, L.P.
2828 N Harwood Suite 1300
Dallas, Texas 75201
CPF 4-2018-5020M
Dear Mr. Cunningham:
From November 27, 2017 to March 23, 2018, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of procedures for Osage Pipeline (Osage) in
Artesia, New Mexico. As a result of the inspection, a Notice of Amendment was issed to Osage
on October 12, 2018.
Osage Pipeline submitted its amended procedures on December 10, 2018. My staff reviewed the
amended procedures and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration