# TARGA NGL PIPE LINE CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 420185024M
- **title:** TARGA NGL PIPE LINE CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-11-14
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.446(c)(4), 195.452(e)(1), 195.452(e)(2), 195.452(j)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420185024m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420185024m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420185024m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420185024M
**body:**

Notice of Amendment involving TARGA NGL PIPE LINE CO. PHMSA's enforcement data identifies the cited regulations as 195.446(c)(4),  195.452(e)(1),  195.452(e)(2),  195.452(j)(2). The case was opened on 2018-11-14 and is reported as closed as of 2020-04-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420185024M_Closure Letter_04302020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185024M/420185024M_Closure%20Letter_04302020.pdf

420185024M_Closure Letter_04302020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185024M/420185024M_Closure%20Letter_04302020_text.pdf

420185024M_Notice of Amendment_11142018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185024M/420185024M_Notice%20of%20Amendment_11142018.pdf

420185024M_Notice of Amendment_11142018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185024M/420185024M_Notice%20of%20Amendment_11142018_text.pdf

420185024M_Operator Request for Hearing and Statement of Issues_01312019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185024M/420185024M_Operator%20Request%20for%20Hearing%20and%20Statement%20of%20Issues_01312019.pdf

420185024M_Operator Response to Notice and Request for Hearing_01312019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420185024M/420185024M_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing_01312019.pdf

420185024M_Closure Letter_04302020_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
April 30, 2020
Hunter Battle
Vice President
Targa NGL Pipeline Company
1000 Louisiana St. Suite 4300
Houston, Texas 77002
CPF 4-2018-5024M
Dear Mr. Battle:
From June 13- 30, 2016, representatives of the Office of Pipeline Safety (OPS), Southwest Region,
pursuant to Chapter 601 of 49 United States Code, conducted a pipeline safety inspection of Targa
NGL Pipeline Company (Targa), facilities and records pertaining to the Product Pipeline system
with pipelines in Louisiana and Texas. As a result of the inspection, Targa was issued a Notice of
Amendment on November 14, 2018, which proposed amendment of your procedures.
Targa submitted its amended procedures on April 30, 2019. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420185024M_Notice of Amendment_11142018_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 14, 2018
Mr. Hunter Battle
Vice President
Targa NGL Pipeline Company
1000 Louisiana St. Suite 4300
Houston, Texas 77002
CPF No. 4-2018-5024M
Dear Mr. Battle:
On June 13- 30, 2016, representatives of the Office of Pipeline Safety (OPS), Southwest Region,
pursuant to Chapter 601 of 49 United States Code, conducted a pipeline safety inspection of Targa
NGL Pipeline (Targa), facilities and records pertaining to the Product Pipeline system with
pipelines in Louisiana and Texas.
As a result of the review of the Targa operations, maintenance, and emergency response manual,
the requirements for which are set forth in Title 49 Code of Federal Regulations, Part 195, the
following inadequate procedures are noted:
1. § 195.446(c)(4) Control room management.
(c) Provide adequate information. Each operator must provide its controllers with the
information, tools, processes and procedures necessary for the controllers to carry out the
roles and responsibilities the operator has defined by performing each of the following:
(4) Test any backup SCADA systems at least once each calendar year, but at intervals not
to exceed 15 months



Targa’s process and procedure documented in the Control Room Management Plan, Hackberry
Storage Facility, backup SCADA system, page 12, is inadequate. The process and procedure lack
specifics in reference as to how the transition from normal to emergency mode will take place,
who will be responsible for implementing the emergency mode, how the testing of the backup
SCADA system will be performed and, how pipeline operation will be returned to the primary
SCADA control.
Targa must amend current process and procedures, these process and procedures should be kept
or referenced in the Control Center Manual of operations as required by 195.446(c)(4).
2. §195.452 Pipeline integrity management in high consequence areas
(e) What are the risk factors for establishing an assessment schedule (for both the baseline and
continual integrity assessments)? (1) An operator must establish an integrity assessment
schedule that prioritizes pipeline segments for assessment (see paragraphs (d)(1) and (j)(3)
of this section). An operator must base the assessment schedule on all risk factors that reflect
the risk conditions on the pipeline segment. The factors an operator must consider include,
but are not limited to:
(i) Results of the previous integrity assessment, defect type and size that the assessment
method can detect, and defect growth rate;
(ii) Pipe size, material, manufacturing information, coating type and condition, and seam
type;
(iii) Leak history, repair history and cathodic protection history;
(iv) Product transported;
(v) Operating stress level;
(vi) Existing or projected activities in the area;
(vii) Local environmental factors that could affect the pipeline (e.g., corrosivity of soil,
subsidence, climatic);
(viii) geo-technical hazards; and (ix) Physical support of the segment such as by a cable
suspension bridge.
(2) Appendix C of this part provides further guidance on risk factors.
Targa’s procedure in Section 5.0 Risk Analysis, 5.2 Hazard /Threat Identification is inadequate as
it does not allow for a technical justification for not considering a given risk factor, specifically
the threat of SCC to its pipeline system.
PHMSA inspectors requested specific procedures that discussed technical justification for Targa
not considering the threat of SCC to its pipeline system. Targa provided PHMSA inspectors a
copy of the SCC criteria that is utilized to either consider or not consider SCC as a risk factor.



Targa must amend current process and procedures, in Section 5.2 of the Integrity Management
Program for Liquid Transmission Pipelines by adding language that allows for a technical
justification for not considering risk factors to ensure compliance with 195.452(e).
3. §195.452 Pipeline integrity management in high consequence areas
(j) What is a continual process of evaluation and assessment to maintain a pipeline's integrity?
(2) Evaluation. An operator must conduct a periodic evaluation as frequently as needed to
assure pipeline integrity. An operator must base the frequency of evaluation on risk factors
specific to its pipeline, including the factors specified in paragraph (e) of this section. The
evaluation must consider the results of the baseline and periodic integrity assessments,
information analysis (paragraph (g) of this section), and decisions about remediation, and
preventive and mitigative actions (paragraphs (h) and (i) of this section).
Targa’s procedure in Section 7.0 Continual Process of Evaluation and Assessment, 7.1 Periodic
Evaluation, is inadequate because it does not set a specific frequency of when Periodic Evaluations
will be performed.
On July 9, 2016, Targa revised its Integrity Management program which included a revision to
Section 7.0 Continual Process of Evaluation and Assessment, 7.1 Periodic Evaluation by adding
language that allows for Periodic Evaluations be performed annually.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this
Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49
C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your amended
procedures to my office within 90 days of receipt of this Notice. This period may be extended by
written request for good cause. Once the inadequacies identified herein have been addressed in
your amended procedures, this enforcement action will be closed.



It is requested (not mandated) that Targa NGL Pipelines maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to R. M. Seeley, Director, SW Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please refer
to CPF No. 4-2018-5024M and, for each document you submit, please provide a copy in electronic
format whenever possible.
In regards to Item 3 listed above, Targa NGL Pipelines provided revised procedures via email soon
after the inspection. This procedure submittal was reviewed and deemed adequate. No further
action is required in response to this Notice and this case is now closed. Thank you for your
cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
- **truncated:** false
- **body characters:** 10397