# DCP MIDSTREAM — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420192003
- **title:** DCP MIDSTREAM — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-12-12
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.615(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420192003.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420192003.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420192003
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420192003
**body:**

Notice of Probable Violation involving DCP MIDSTREAM. PHMSA's enforcement data identifies the cited regulation as 192.615(b)(2). The case was opened on 2019-12-12 and is reported as closed as of 2020-04-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420192003_Final Order_04072020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420192003/420192003_Final%20Order_04072020.pdf

420192003_Final Order_04072020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420192003/420192003_Final%20Order_04072020_text.pdf

420192003_NOPV PCO_12122019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420192003/420192003_NOPV%20PCO_12122019.pdf

420192003_NOPV PCO_12122019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420192003/420192003_NOPV%20PCO_12122019_text.pdf

420192003_Operator Response to Notice_01082020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420192003/420192003_Operator%20Response%20to%20Notice_01082020.pdf

420192003_Final Order_04072020_text.pdf

VIA EMAIL TO: aebarry@dcpmidstream.com and blbackes@dcpmidstream.com
Mr. Wouter van Kempen
Chairman and Chief Executive Officer
DCP Midstream, LP
370 17th Street, Suite 2500
Denver, Colorado 80202
Re: CPF No. 4-2019-2003
Dear Mr. van Kempen:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and finds that the proposed actions to comply with the pipeline safety regulations have
been completed. This case is now closed. Service of the Final Order by e-mail is effective upon
the date of mailing as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Ms. Mary McDaniel, Director, Southwestern Region, Office of Pipeline Safety, PHMSA
Ms. Alison Barry, Assistant General Counsel, DCP Midstream, LP
Mr. Brent Backes, Group Vice President and General Counsel, DCP Midstream, LP
VIA EMAIL – CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
DCP Midstream, LP, ) CPF No. 4-2019-2003
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On December 12, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office
of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to DCP Midstream, LP
(Respondent). The Notice proposed finding that Respondent had violated the pipeline safety
regulations in 49 C.F.R. Part 192 and proposed certain measures to correct the violation.
Respondent did not contest the allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.615(b)(2) (Item 1) ─ Respondent failed to conduct an emergency
response training for its Opelousas Area personnel for calendar year 2018 in accordance
with the interval established in Respondent’s Standard Operating Procedure 5-2010.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
The Director has indicated that Respondent completed the actions proposed in the Notice to
correct the violations. Therefore, it is not necessary to include the proposed compliance terms in
this Final Order.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
April 7, 2020
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 3908
