# PHILLIPS 66 PIPELINE LLC — Corrective Action Order

- **operation:** document
- **citation:** CPF 420195015H
- **title:** PHILLIPS 66 PIPELINE LLC — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-07-16
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420195015h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420195015h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420195015h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420195015H
**body:**

Corrective Action Order involving PHILLIPS 66 PIPELINE LLC. The dataset does not identify a cited regulation for this case. The case was opened on 2019-07-16 and is reported as closed as of 2022-12-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420195015H_Closure Letter_12202022_(19-166263S).pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195015H/420195015H_Closure%20Letter_12202022_(19-166263S).pdf

420195015H_Closure Letter_12202022_(19-166263S)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195015H/420195015H_Closure%20Letter_12202022_(19-166263S)_text.pdf

420195015H_Corrective Action Order_07162019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195015H/420195015H_Corrective%20Action%20Order_07162019.pdf

420195015H_Corrective Action Order_07162019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195015H/420195015H_Corrective%20Action%20Order_07162019_text.pdf

420195015H_Closure Letter_12202022_(19-166263S)_text.pdf

VIA ELECTRONIC MAIL
December 20, 2022
Manny Cortez
President
Phillips 66 Pipeline, LLC
2331 City West Blvd.
Houston, Texas 77042
CPF 4-2019-5015H
Dear Mr. Cortez:
On July 16, 2019, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
a Corrective Action Order (CAO) to Phillips 66 Pipeline, LLC (Phillips 66) for the Line OK-01
rupture that occurred on July 10, 2019, near Thornberry, Texas. Line OK-01 transports crude oil
between Wichita Falls, Texas and Ponca City, Oklahoma.
On November 2, 2022, Phillips 66 notified the Southwest Region office of completion of the
Remedial Work Plan and requested closure of the CAO and restoring the pipeline to its pre-failure
operating pressure. PHMSA monitored the actions taken within the Remedial Work Plan and
reviewed records submitted by Phillips 66. PHMSA has determined that the operator has
substantially completed the requirements of the CAO and that the pipe can safely be returned to
pre-failure operating pressures.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
cc: Doug Sauer, doug.b.sauer@p66.com

420195015H_Corrective Action Order_07162019_text.pdf

July 16, 2019
VIA CERTIFIED MAIL AND EMAIL TO:
Todd Denton
President
Phillips 66 Pipeline, LLC
2331 CityWest Blvd.
Houston, Texas 77042
CPF No. 4-2019-5015H
Dear Mr. Denton:
Enclosed please find a Corrective Action Order (CAO) issued by the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), in the above-
referenced case. It requires Phillips 66 Pipeline, LLC, to take certain corrective actions with
respect to a crude oil release north of Wichita Falls, Texas, on July 10, 2019, from its 12.75-inch
OK-01 pipeline.
Service of this CAO is being made by certified mail and facsimile. Service of the CAO by
electronic transmission is deemed complete upon transmission and acknowledgement of receipt,
or as otherwise provided under 49 C.F.R. § 190.5. The terms and conditions of this Order are
effective upon completion of service.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure: CAO
cc: Ms. Linda Daugherty, Deputy Associate Administrator for Field Operations, OPS
Ms. Mary McDaniel, Director, Southwestern Region, OPS



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_______________________________________________
In the Matter of )
Phillips 66 Pipeline, LLC, )
Respondent. )
)
)
)
) CPF No. 4-2019-5015H
_______________________________________________ )
CORRECTIVE ACTION ORDER
Purpose and Background:
This Corrective Action Order (CAO or Order) is being issued under the authority of 49 U.S.C.
§ 60112 to require Phillips 66 Pipeline, LLC (P66 or Respondent), to take the necessary
corrective actions to protect the public, property, and the environment from potential hazards
associated with the July 10, 2019 release from its 12.75-inch OK-01 crude oil pipeline north of
Wichita Falls, Texas (Accident).
On the afternoon of July 10, 2019, the P66 control room observed indications of a potential
release on its 12.75-inch OK-01 crude oil pipeline north of Wichita Falls, Texas, when a
pumping unit shut down on low-suction pressure, with a corresponding indication of high flow
rate. At the time of the initial report, P66 did not have confirmation of a leak and planned to
provide aerial patrol to search for the leak. A follow-up report from P66 confirmed a release at
approximately Mile Post (MP) 204.5, in a rural agricultural area, with an impacted area
estimated 60 yards long by 80 yards wide, including a landowner’s pond (Failure Site). The site
is identified as a could affect area for drinking water sources as well as ecological impact.
P66 reported no injuries or fatalities as a result of the Accident, and there were no reported fires
or explosions. The cause of the Accident appears to be related to the pipe’s Pre 1970 ERW
seam. Pursuant to 49 U.S.C. § 60117, PHMSA, Office of Pipeline Safety (OPS), has initiated an
investigation of the Accident. The preliminary findings of the agency’s ongoing investigation
are as follows:
Preliminary Findings:
 P66, a wholly-owned subsidiary of Phillips 66, operates more than 12,000 miles of
pipeline and associated facilities in the United States that transport both crude oil and



CPF No. 4-2019-5015H
Page 2
refined petroleum products.1
 The OK-01 crude oil system is a 12.75-inch pipeline running from Wichita Falls,
Texas, to South Tank Farm in Ponca City, Oklahoma. The line is 217.24 miles in
length and was built in 1955. The pipeline is part of a larger P66 unit with a total of
452.57 miles.
Upon discovery of the potential release, P66 shut the system in and held pressure on
the pipeline north of the Red River, indicating the potential release was located
somewhere between Wichita Falls, Texas, and the Texas/Oklahoma state line. P66
dispatched a patrol plane and confirmed the Failure Site as being located at
approximately MP 204.5, roughly two miles east of Thornberry, Texas. P66
mobilized its Oil Spill Removal Organization and company staff to respond to the
Failure Site. It also placed booms in the landowner stock pond to contain the spilled
oil and began recovery operations.
 It is estimated that 1200 barrels of crude oil was released.
 Line OK-01, between Wichita Falls, Texas, and Ponca City, Oklahoma, was
constructed of 12.75-inch OD x 0.250-inch wall thickness, low-frequency electric
resistance welded (LF ERW) pipe manufactured in 1955 by an unknown
manufacturer. Pipes manufactured prior to 1970 with LF ERW longitudinal seams are
a known threat to pipeline integrity under certain conditions. A visual inspection of
the failed pipe by the PHMSA personnel on-site appeared to show longitudinal seam
failure as a probable cause of the failure.
 On July 13, 2019, the Director approved P66’s written restart plan, and operation was
restarted on July 14, 2019.
 The rupture opening appears to be a longitudinal seam failure 7 feet long by 1 inch at
the widest point. The failure appears to be in the middle of a 47-foot section of
pipeline (between girth welds).
 The Maximum Operating Pressure is 1168 pounds per square inch (psig) at the leak
location. The discharge at the Wichita Falls Pump Station (MP 217) was recorded at
865 psig. The pump station is located approximately 13 miles upstream of the point
of failure.
 There are portions of the approximate 217-mile OK-01 pipeline that traverse High
Consequence Areas that could potentially affect the life and property of those
1 See https://www.phillips66.com/about/ (last accessed July 15, 2019).



CPF No. 4-2019-5015H
Page 3
surrounded by the pipeline. The pipeline originates in the city of Wichita Falls, Texas.
The nature of the LF ERW pipeline may make a release more likely prior to
additional testing and evaluation.
 The pipeline crosses environmentally sensitive areas as the crude oil is shipped from
Wichita Falls, Texas, to Ponca City, Oklahoma. Some of the areas could affect areas
and drinking water sources. Approximately 6.8 miles downstream of the Failure Site,
the pipeline crosses the Red River and there is a drinking water source between
Thornberry and the Failure Site to the southwest.
 There have been two reportable accidents on this pipeline between 2002 and the
present. The first was in September 2011 in Temple, Oklahoma, which was the result
of an unknown cause as it was 25 feet under the Red River. P66 replaced the river
crossing in 2011. The second was in December 2013 in Ponca City, Oklahoma, which
was caused by third-party damage. The only reported seam failure was during a
hydrotest performed in 2004.
 The operator reported that it performed an UT-CD (Crack Detection Tool) in-line
inspection (ILI) run in July 2018 and an MFL/DEF ILI in March 2016. The closest
anomalies that were previously investigated in 2010 and 2011 were due to external
corrosion.
 PHMSA has issued Advisory Bulletins on the heightened safety risks of Low-
Frequency Welded ERW and Flash-Welded Pipe manufactured prior to 1970. It also
issued Alert Notice, ALN-88-01, in January 1988, advising owners and operators of
natural gas and hazardous liquids pipelines to consider the threat from ERW pipe
manufactured prior to 1970. Operators were advised to determine whether their
pipelines were susceptible to ERW seam failures and address the potential impact on
pipeline integrity.
Determination of Necessity for Corrective Action Order and Right to Hearing:
Section 60112 of Title 49, United States Code, provides for the issuance of a Corrective Action
Order, after reasonable notice and the opportunity for a hearing, requiring corrective action,
which may include the suspended or restricted use of a pipeline facility, physical inspection,
testing, repair, replacement, or other action, as appropriate. The basis for making the
determination that a pipeline facility is hazardous and requiring corrective action is set forth both
in the above-referenced statute and 49 C.F.R.§ 190.233.
Section 60112, and the regulations promulgated thereunder, provide for the issuance of a
Corrective Action Order without prior opportunity for notice and hearing upon a finding that
failure to issue the Order expeditiously will likely result in serious harm to life, property or the
environment. In such cases, an opportunity for a hearing will be provided as soon as practicable



CPF No. 4-2019-5015H
Page 4
after the issuance of the Order.
P66 is governed by Section 60101 of Title 49, United States Code, as detailed in 49 C.F.R.
Section 195.
After evaluating the foregoing preliminary findings of fact and considering the ongoing
investigation of the Accident, I find that the continued operation of the Affected Segment
without corrective measures is or would be hazardous to life, property and the environment.
Given the increased likelihood that there are other locations along the pipe that are subject to the
same operational cycles and fatigue, and given that this is a pre-1970 ERW pipe, there is a
heightened risk of imminent failures along the pipe. Additionally, after considering the facts and
the ongoing investigation of the Accident, I find that a failure to issue this Order expeditiously to
require immediate corrective action would result in likely serious harm to life, property, and the
environment.
Accordingly, this Corrective Action Order mandating immediate corrective action is issued
without prior notice and opportunity for a hearing. The terms and conditions of this Order are
effective upon receipt.
Within 10 days of receipt of this Order, Respondent may request a hearing, to be held as soon as
practicable, by notifying the Associate Administrator for Pipeline Safety in writing, with a copy
to the Director, Southwest Region, PHMSA (Director). If a hearing is requested, it will be held
telephonically or in-person in Houston, Texas, unless a different location is expressly agreed to
in writing by the Director.
After receiving and analyzing additional data in the course of this investigation, PHMSA may
identify other corrective measures that need to be taken. Respondent will be notified of any
additional measures required and, if appropriate, PHMSA will consider amending this Order. To
the extent consistent with safety, Respondent will be afforded notice and an opportunity for a
hearing prior to the imposition of any additional corrective measures.
Required Corrective Actions:
Definitions:
Affected Segment – Means the approximately 217 miles of P66’s 12.75-inch line OK-01
from Wichita Falls, Texas, to Ponca City, Oklahoma.
Isolated Segment- Means approximately the 33-mile segment of P66’s 12.75-inch line
OK-01 from Waurika Lake (MP 184) and Wichita Falls (MP 217). It is the portion of the
“Affected Segment” that was shut-in after the Accident on July 10, 2019, by closing main
line valves (upstream and downstream of the Failure Site) and that remained shut-in until
the restart plan was approved by the Director.



CPF No. 4-2019-5015H
Page 5
Director – Means the Director, Southwest Region, PHMSA, Office of Pipeline Safety.
Pursuant to 49 U.S.C. 60112, I hereby order P66 to immediately take the following corrective
actions for the Affected Segment:
1. 2. 3. 4. 5. Return to Service. P66 obtained approval from the Director to resume operation.
Restart Plan. P66 developed and submitted a written restart plan, and received approval
from of the Director, Southwest Region. The Restart Plan provided for adequate
patrolling of the Isolated Segment during the restart process and included measures to
confirm the integrity of the pipeline facilities that were damaged or are suspected of
being damaged as a result of the Accident. The Restart Plan specified a daylight restart
and provided for advance communications with local emergency response officials.
Metallurgical Testing. Within 45 days of receipt of this Order, complete mechanical and
metallurgical testing and failure analysis of the failed pipe by an independent testing
laboratory. Complete the testing and analysis as follows:
A. Document the chain-of-custody when handling and transporting the failed pipe
section and other evidence from the Failure Site;
B. Within 10 days of receipt of this Order, develop and submit to the Director the
testing protocol, including selection of the testing laboratory, for prior approval;
C. Prior to commencing the mechanical and metallurgical testing, provide the
Director with the scheduled date, time, and location of the testing to allow a
PHMSA representative to witness the testing; and
D. Ensure that the testing laboratory distributes all resulting reports in their entirety
(including all media), whether draft or final, to the Director at the same time as
they are made available to Respondent.
Root Cause Failure Analysis. Within 90 days following receipt of this Order, complete a
root cause failure analysis (RCFA) and submit a final report of the RCFA to the Director.
The RCFA must be supplemented/facilitated by an independent third-party acceptable to
the Director and must document the decision-making process and all factors contributing
to the failure. The final report must include findings and lessons learned. The RCFA must
also include a discussion of whether the findings and lessons learned are applicable to other
locations within P66’s pipeline system.
Remedial Work Plan. Within 90 days after completing the metallurgical testing and
analysis, submit a remedial work plan (Remedial Work Plan) to the Director for approval.
The Remedial Work Plan must provide for the verification of the integrity of the Affected
Segment and must address all factors known or suspected in the Accident, including, but



6. 7. 8. CPF No. 4-2019-5015H
Page 6
not limited to, the following:
A. The integration of the results of the failure analyses and other actions required by
this Order with all relevant operating data, including all historical repair
information, results of past in-line inspections, construction, operating,
maintenance, testing, metallurgical analysis or other third-party consultation
information, and assessment data for the Affected Segment;
B. The performance of additional field testing, inspections, and evaluations to
determine whether and to what extent the conditions associated with the Accident
or any other integrity-threatening conditions are present elsewhere on the
Affected Segment. The results of the inspections, field excavations, and
evaluations must be made available to PHMSA or its representative;
C. The performance of repairs or other corrective measures that fully remediate the
identified risk conditions associated with the Accident and any other integrity-
threatening condition everywhere along the Affected Segment. Based on the
known history and condition of the pipeline, the plans for repairs must include
continuing long-term periodic testing and integrity verification measures to ensure
the ongoing safe operation of the pipeline, considering the results of the analyses,
inspections, and corrective measures undertaken pursuant to the Order; and
D. A proposed schedule for completion of Items A−C.
The Remedial Work Plan will be incorporated by reference into this Order. Respondent
must revise the Remedial Work Plan as necessary to incorporate the results of actions
undertaken pursuant to this Order and whenever necessary to incorporate new
information obtained during P66’s failure investigation and remedial activities. Submit
any such plan revisions to the Director for prior approval. The Director may approve
plan elements incrementally.
Implement the Remedial Work Plan as approved by the Director, including any revisions
to the plan.
Pressure Restriction. After receiving approval from the Director to restart the Affected
and Isolated Segments, the pressure for both segments is not to exceed 80% of the actual
operating pressure in effect immediately prior to the Accident. P66 provided data to
support the pressure derating from each of their stations along the pipeline. This pressure
reduction requires that any relevant remote or local alarm limits, software programming
set-points or control points, and mechanical over-pressure devices be adjusted
accordingly. This pressure restriction will remain in effect until written approval to
increase the pressure or return the pipeline to its pre-failure operating pressure is obtained
from the Director.



CPF No. 4-2019-5015H
Page 7
9. 2. 3. Removal of Pressure Restriction. The Director may allow the removal or modification of
the pressure restriction upon a written request from Respondent demonstrating that
restoring the Affected Segment to its pre-failure operating pressure is justified based on a
reliable engineering analysis showing that the pressure increase is safe considering all
known defects, anomalies and operating parameters of the pipeline.
Other Requirements:
1. Reporting. Submit quarterly reports to the Director that: (1) include all available data and
results of the testing and evaluations required by this Order; and (2) describe the progress
of the repairs or other remedial actions being undertaken. The first quarterly report is due
on September 30, 2019. The Director may change the interval for the submission of
these reports.
Documentation of the Costs. It is requested but not required that Respondent maintain
documentation of the costs associated with implementation of this Corrective Action
Order. Include in each monthly report submitted, the to-date total costs associated with:
(1) preparation and revision of procedures, studies and analyses; (2) physical changes to
pipeline infrastructure, including repairs, replacements and other modifications; and (3)
environmental remediation, if applicable.
Approvals. With respect to each submission that under this Order requires the approval
of the Director, the Director may: (a) approve, in whole or part, the submission; (b)
approve the submission on specified conditions; (c) modify the submission to cure any
deficiencies; (d) disapprove in whole or in part, the submission, directing that Respondent
modify the submission, or (e) any combination of the above. In the event of approval,
approval upon conditions, or modification by the Director, Respondent shall proceed to
take all action required by the submission as approved or modified by the Director. If the
Director disapproves all or any portion of the submission, Respondent must correct all
deficiencies within the time specified by the Director, and resubmit it for approval.
Extensions of Time. The Director may grant an extension of time for compliance with
any of the terms of this Order upon a written request timely submitted demonstrating
good cause for an extension.
Be advised that all material you submit in response to this enforcement action is subject
to being made publicly available. If you believe that any portion of your responsive
material qualifies for confidential treatment under 5 U.S.C. § 552(b), along with the
complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of
why you believe the redacted information qualifies for confidential treatment under 5
U.S.C. § 552(b).
In your correspondence on this matter, please refer to “CPF No. 4-2019-5015H” and for each
4. 5.



CPF No. 4-2019-5015H
Page 8
document you submit, please provide a copy in electronic format whenever possible. The
actions required by this Order are in addition to and do not waive any requirements that apply to
Respondent’s pipeline system under 49 C.F.R. Parts 190 through 199, under any other order
issued to Respondent under authority of 49 U.S.C. Chapter 601, or under any other provision of
Federal or State law.
Respondent may appeal any decision of the Director to the Associate Administrator for Pipeline
Safety. Decisions of the Associate Administrator shall be final.
Failure to comply with this Order may result in the assessment of civil penalties and in referral to
the Attorney General for appropriate relief in United States District Court pursuant to
49 U.S.C. § 60120.
The terms and conditions of this Order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
July 16, 2019
_________________________________ ________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false