# WEST TEXAS GULF PIPELINE CO — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420195019
- **title:** WEST TEXAS GULF PIPELINE CO — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2019-10-24
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.406(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420195019.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420195019.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420195019
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420195019
**body:**

Notice of Probable Violation involving WEST TEXAS GULF PIPELINE CO. PHMSA's enforcement data identifies the cited regulation as 195.406(a). The case was opened on 2019-10-24 and is reported as closed as of 2025-09-12. Proposed civil penalty: $64,600. Assessed civil penalty: $64,600. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420195019_Closure Letter_09122025_(18-162842S).pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_Closure%20Letter_09122025_(18-162842S).pdf

420195019_Closure Letter_09122025_(18-162842S)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_Closure%20Letter_09122025_(18-162842S)_text.pdf

420195019_Final Order_07272020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_Final%20Order_07272020.pdf

420195019_Final Order_07272020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_Final%20Order_07272020_text.pdf

420195019_NOPV PCP PCO_10242019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_NOPV%20PCP%20PCO_10242019.pdf

420195019_NOPV PCP PCO_10242019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_NOPV%20PCP%20PCO_10242019_text.pdf

420195019_Operator Response to the Notice_11212019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195019/420195019_Operator%20Response%20to%20the%20Notice_11212019.pdf

420195019_NOPV PCP PCO_10242019_text.pdf

NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 24, 2019
Greg McIlwain
Senior Vice-President Operations
Energy Transfer Company
1300 Main Street
Houston, TX 77002
CPF 4-2019-5019
Dear Mr. McIlwain:
Between October 14, 2018 and July 24, 2019, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code, conducted an investigation of your subsidiary, West Texas Gulf
Pipe Line Company, regarding two releases on the West Texas Gulf Pipeline system (between
Colorado City to Abilene, Texas) that occurred on October 14 and 20, 2018, in Nolan and Taylor
County, Texas. The investigation included a review of records and procedures.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The item inspected and
the probable violation is:



1. §195.406 Maximum operating pressure.
(a) Except for surge pressures and other variations from normal operations,
no operator may operate a pipeline at a pressure that exceeds any of the following:
(1) The internal design pressure of the pipe determined in accordance
with §195.106. However, for steel pipe in pipelines being converted under §195.5,
if one or more factors of the design formula (§195.106) are unknown, one of the
following pressures is to be used as design pressure:
(i) Eighty percent of the first test pressure that produces yield under section
N5.0 of Appendix N of ASME/ANSI B31.8 (incorporated by
reference, see §195.3), reduced by the appropriate factors in §§195.106(a)
and (e); or
(ii) If the pipe is 323.8 mm (12¾ in) or less outside diameter and is not tested
to yield under this paragraph, 1379 kPa (200 psig).
(2) The design pressure of any other component of the pipeline.
(3) Eighty percent of the test pressure for any part of the pipeline which has been
pressure tested under Subpart E of this part.
(4) Eighty percent of the factory test pressure or of the prototype test pressure
for any individually installed component which is excepted from testing
under §195.305.
(5) For pipelines under §195.302(b)(1) and (b)(2)(i), that have not been pressure
tested under Subpart E of this part, 80 percent of the test pressure or highest
operating pressure to which the pipeline was subjected for 4 or more continuous
hours that can be demonstrated by recording charts or logs made at the time the
test or operations were conducted.
West Texas Gulf Pipe Line Company (WTG) failed to establish a maximum operating
pressure (MOP) for its WTG # 1 (Colorado City to Wortham, Texas) and WTG # 2
(Wortham to Nederville, Texas) pipelines in accordance with 49 CFR § 195.406. The
pipeline has operated without an established MOP since 2002.
While reviewing two National Response Center reports, the PHMSA inspector found that
WTG did not have records to validate the MOP for the WTG # 1 (Colorado City to
Wortham, Texas) and WTG # 2 (Wortham to Nederland, Texas) pipelines. WTG could not
produce pressure test records, operating pressure charts, logs or other supporting evidence
to show that the MOP of its WTG Pipeline was set in accordance with 49 CFR §195.406(a).
Specifically, WTG did not perform hydrostatic tests on ten segments of the pipeline systems.
Six segements were tested by 2018; however four segments remain untested, and include
the Abilene to Ranger, Ranger to Blum and Blum to Wortham segments on the WTG #1
system, and Wortham to Longview on the WTG #2 system.
2



Proposed Civil Penalty
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for a related
series of violations. For violation occurring on or after November 27, 2018 and before July 31,
2019, the maximum penalty may not exceed $213,268 per violation per day, with a maximum
penalty not to exceed $2,132,679. For violation occurring on or after November 2, 2015 and before
November 27, 2018, the maximum penalty may not exceed $209,002 per violation per day, with a
maximum penalty not to exceed $2,090,022. For violations occurring prior to November 2, 2015,
the maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. The Compliance Officer has reviewed
the circumstances and supporting documentation involved for the above probable violation(s) and
has recommended that you be preliminarily assessed a civil penalty of $64,600 as follows:
Item number PENALTY
1 $64,600
Proposed Compliance Order
With respect to item 1 pursuant to 49 U.S.C. § 60118, the Pipeline and Hazardous Materials Safety
Administration proposes to issue a Compliance Order to West Texas Gulf Pipeline Company.
Please refer to the Proposed Compliance Order, which is enclosed and made a part of this Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. All
material you submit in response to this enforcement action may be made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, or request a
hearing under 49 CFR § 190.211. If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order. If you are responding to this Notice, we propose that you
submit your correspondence to my office within 30 days from receipt of this Notice. This period
may be extended by written request for good cause.
3



In your correspondence on this matter, please refer to CPF 4-2019-5019 and, for each document
you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
4



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to West Texas Gulf Pipeline Company (WTG) a
Compliance Order incorporating the following remedial requirements to ensure the compliance of
WTG with the pipeline safety regulations:
1. 2. In regard to Item 1 of the Notice pertaining to the operator’s failure to have
established a maximum operating pressure (MOP), WTG must submit operating
pressure recording charts or logs to verify the maximum operating pressure (MOP)
per § 195.406(a)(5), or perform a pressure test per the requirements of §
195.406(a)(3) to establish an MOP of its WTG # 1 (Colorado City to Wortham,
Texas) and WTG # 2 (Wortham to Nederville, Texas) pipelines. WTG shall develop
and provide Director with the detailed process and schedule by which it will
complete hydrostatic pressure testing of all remaining pipeline segments.
It is requested (not mandated) that West Texas Gulf Pipeline Company maintain
documentation of the safety improvement costs associated with fulfilling this
Compliance Order and submit the total to Mary L. McDaniel, Director, Southwest
Region, Pipeline and Hazardous Materials Safety Administration. It is requested
that these costs be reported in two categories: 1) total cost associated with
preparation/revision of plans, procedures, studies and analyses, and 2) total cost
associated with replacements, additions and other changes to pipeline
infrastructure.
5

420195019_Closure Letter_09122025_(18-162842S)_text.pdf

U.S. Department of Transportation
Pipeline and Hazardous Materials
Safety Administration 8701 S. Gessner, Suite 630
Houston TX 77074
VIA ELECTRONIC MAIL TO: tom.long@energytransfer.com
September 12, 2025
Mr. Thomas E. Long
Chief Executive Officer
Energy Transfer Company, LP
8111 Westchester Drive
Dallas, Texas 75225
RE: CPF 4-2019-5019
Dear Mr. Long:
On July 27, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to West Texas Gulf Pipe Line Company, LLC, a subsidiary of Energy Transfer, L.P, (WTG) a
Final Order in the above-referenced case. This Order included a Compliance Order and Civil
Penalty assessment. Based on our review of the documentation provided and confirmation of
payment of the civil penalty, it has been determined that WTG has successfully complied with the
terms of the Final Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Gregory McIlwain, Executive Vice President of Operations, Energy Transfer, LP,
gregory.mcilwain@energytransfer.com
Todd Nardozzi, Director, Regulatory Compliance, Energy Transfer Company,
todd.nardozzi@energytransfer.com

420195019_Final Order_07272020_text.pdf

July 27, 2020
VIA ELECTRONIC MAIL TO: gregory.mcilwain@energytransfer.com
Mr. Greg McIlwain
Senior Vice President of Operations
West Texas Gulf Pipe Line Company, LLC
1300 Main Street
Houston, Texas 77002
Re: CPF No. 4-2019-5019
Dear Mr. McIlwain:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation, assesses a civil penalty of $64,600 and specifies actions that need to be taken by West
Texas Gulf Pipe Line Company, LLC, a subsidiary of Energy Transfer, LP, to comply with the
pipeline safety regulations. The penalty payment terms are set forth in the Final Order. When
the civil penalty has been paid and the terms of the compliance order completed, as determined
by the Director, Southwest Region, this enforcement action will be closed. Service of the Final
Order by electronic mail is effective upon the date of transmission as provided under 49 C.F.R.
§ 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ms. Mary McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Kelcy Warren, President and Chief Executive Officer, Energy Transfer, LP,
kelcy.warren@energytransfer.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of )
)
)
West Texas Gulf Pipe Line Company, LLC, a subsidiary of Energy Transfer, LP, )
Respondent. )
)
)
) CPF No. 4-2019-5019
FINAL ORDER
From October 14, 2018, through July 24, 2019, pursuant to 49 U.S.C. § 60117, a representative
of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety (OPS), conducted an on-site pipeline safety investigation of the facilities and records of
West Texas Gulf Pipe Line Company, LLC (WTG or Respondent), in Texas following two
releases during hydrostatic pressure testing in October 2018.1 WTG, a subsidiary of Energy
Transfer, LP, operates a 26-inch diameter hazardous liquid pipeline from Colorado City, Texas,
to Longview, Texas.
As a result of the investigation, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated October 24, 2019, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that WTG had violated 49 C.F.R. § 195.406(a) and proposed assessing a
civil penalty of $64,600 for the alleged violation. The Notice also proposed ordering Respondent
to take certain measures to correct the alleged violation.
Energy Transfer, LP, on behalf of WTG, responded to the Notice by letter dated November 21,
2019 (Response). The company did not contest the allegation of violation or proposed
compliance actions, but did request that the proposed civil penalty be reduced based on certain
additional information. Respondent did not request a hearing and therefore has waived its right
to one.
FINDING OF VIOLATION
In its Response, WTG did not contest the allegation in the Notice that it violated 49 C.F.R. Part
195, as follows:
1 See National Response Center (NRC) Report #1227441(Oct. 14, 2018) and NRC Report #1228043 (Oct. 20, 2018).



CPF No. 4-2019-5019
Page 2
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.406(a), which states:
§ 195.406 Maximum operating pressure.
(a) Except for surge pressures and other variations from normal
operations, no operator may operate a pipeline at a pressure that exceeds
any of the following:
(1) The internal design pressure of the pipe determined in accordance
with § 195.106. However, for steel pipe in pipelines being converted under
§ 195.5, if one or more factors of the design formula (§ 195.106) are
unknown, one of the following pressures is to be used as design pressure:
(i) Eighty percent of the first test pressure that produces yield under
section N5.0 of appendix N of ASME/ANSI B31.8 (incorporated by
reference, see § 195.3), reduced by the appropriate factors in §§ 195.106 (a)
and (e); or
(ii) If the pipe is 12 ¾ inch (324 mm) or less outside diameter and is not
tested to yield under this paragraph, 200 p.s.i. (1379 kPa) gage.
(2) The design pressure of any other component of the pipeline.
(3) Eighty percent of the test pressure for any part of the pipeline which
has been pressure tested under subpart E of this part.
(4) Eighty percent of the factory test pressure or of the prototype test
pressure for any individually installed component which is excepted from
testing under § 195.305.
(5) For pipelines under §§ 195.302(b)(1) and (b)(2)(i) that have not been
pressure tested under subpart E of this part, 80 percent of the test pressure
or highest operating pressure to which the pipeline was subjected for 4 or
more continuous hours that can be demonstrated by recording charts or logs
made at the time the test or operations were conducted.
The Notice alleged that Respondent violated 49 C.F.R. § 195.406(a) by operating a pipeline that
exceeded an established maximum operating pressure (MOP). Specifically, the Notice alleged
that WTG failed to have records to validate the MOP for the company’s WTG #1 pipeline
segment (Colorado City to Wortham, Texas) and its WTG #2 pipeline segment (Wortham to
Nederland, Texas), both of which had operated without an established MOP since 2002.2 It
further alleged that although WTG performed hydrostatic tests on six segments by 2018, four
segments remained untested at the time of the PHMSA investigation.3
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.406(a) by failing to establish
MOP on its pipeline.
2 In 2005, WTG established MOP via pressure testing on five segments of the line and provided these records to
PHMSA during its investigation. Pipeline Safety Violation Report (Violation Report), at 5 (Oct. 24, 2019) (on file
with PHMSA). In its Response, WTG stated that it believed pressure testing was performed by a previous operator
in 1998, but could not find these records. Response, at 2-3.
3 In its Response, the company noted that one of these four segments was tested in 2019 and that it planned to test the
remaining three segments in 2020, 2021, and 2022. Response, at 2-3.



CPF No. 4-2019-5019
Page 3
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.4 In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; any effect that
the penalty may have on its ability to continue doing business; and the good faith of Respondent
in attempting to comply with the pipeline safety regulations. In addition, I may consider the
economic benefit gained from the violation without any reduction because of subsequent
damages, and such other matters as justice may require. The Notice proposed a total civil
penalty of $64,600 for the violation cited above.
Item 1: The Notice proposed a civil penalty of $64,600 for Respondent’s violation of 49 C.F.R.
§ 195.406(a) for failing to establish MOP on its pipeline. In its Response, WTG presented
several arguments for a reduction in the civil penalty. I will address each one separately below.
First, WTG contends that the nature of the violation should be changed to a record-keeping
violation rather than an “activity” violation under Part E4 of the Violation Report. WTG states
that it believes pressure testing was performed in 1998 by a previous operator, but that it is
“unable to locate and was unable to produce these specific records during the course of the
investigation” but “believes that these records did exist.”5 Although the company could have
corroborated its claim that pressure testing was performed by producing testing records,
affidavits, or other evidence showing that the testing activity actually occurred, it did not do so.
Therefore, the record contains nothing more than a mere unsupported statement and an
admission by WTG that the records could not be located.6 Therefore, I see no reason to find that
the violation was merely a record-keeping, rather than a substantive, violation.
Second, WTG argues that the number of instances of violation under the “gravity” criterion in
Part E6 of the Violation Report should be reduced from two to one because “the WTG pipeline
system is one system” and the two releases occurred on the same Colorado City to Abilene
segment, and therefore consisted of only one violation. The company contends that even though
the two releases were reported separately under two different National Response Center reports,
they both related to a single failure to establish MOP pursuant to § 195.406(a).
4 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223.
5 Response, at 3.
6 See In re: Kinder Morgan Liquid Terminals, LLC, CPF No. 1-2018-5005, Final Order, at 4 (Mar. 8, 2019) (finding
that the violation was an activity violation, rather than a records violation, because the record contains “nothing more
than a mere unsupported statement that the required inspections and calculations were performed, and an admission
that the records do not exist”).



CPF No. 4-2019-5019
Page 4
I disagree. Contrary to WTG’s description of its pipeline as a single system, there were actually
10 instances of violation because WTG operated ten different segments of its pipeline system
without establishing the MOP for each one.7 Although five were tested in 2018, the fact remains
that all ten were operational for years without any evidence, such as MOP test records, to
demonstrate that MOP was properly established under § 195.406(a). Despite this, I will not
increase the number of instances of violation to ten, nor will I lower it to one.
Third, WTG requests a reduction in the “culpability” assessment factor under Part E7 of the
Violation Report. Specifically, the company contends that the culpability factor should be
changed from “the operator failed to comply with a requirement that was clearly applicable” to
“after the operator found the noncompliance, the operator took documented action to address the
cause of the noncompliance, and was in the process of correcting the noncompliance before
PHMSA learned of the violation.” However, the penalty criteria under Part E7 contain the
exception that the lower culpability level “[d]oes not apply to operator post-accident/incident
enforcement actions.”8 Although WTG was in the process of hydrotesting its line when the
reportable accidents occurred, the culpability factor cannot be lowered because there is no
evidence to suggest that WTG undertook the pressure testing that was ongoing when the two
releases occurred in order to correct the non-compliance. Therefore, the company’s post-release
actions do not serve to reduce the culpability factor.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $64,600 for violation of 49 C.F.R. § 195.406(a).
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMK-325), Federal Aviation Administration, Mike
Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City, Oklahoma 79169.
The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the $64,600 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
The Notice proposed a compliance order with respect to Item 1 in the Notice for violation of
49 C.F.R. § 195.406(a). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
COMPLIANCE ORDER
7 Under § 195.406, MOP is established per segment, not per “system.”
8 Violation Report, at 11.



CPF No. 4-2019-5019
Page 5
comply with the applicable safety standards established under chapter 601. Pursuant to the
authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
following actions to ensure compliance with the pipeline safety regulations applicable to its
operations:
1. With respect to the violation of § 195.406(a) (Item 1), Respondent must submit
operating pressure recording charts or logs to verify the MOP per § 195.406(a)(5), or
perform a pressure test per the requirements of §195.406(a)(3) to establish an MOP of
its WTG # 1 (Colorado City to Wortham, Texas) and WTG # 2 (Wortham to
Nederland, Texas) pipelines. WTG shall develop and provide the Director with the
detailed process and schedule by which it will complete hydrostatic pressure testing
of all remaining pipeline segments no later than the end of calendar year 2020.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
It is requested (not mandated) that Respondent maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit the total to the
Director. It is requested that these costs be reported in two categories: (1) total cost associated
with preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated
with replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The filing of a petition automatically stays
the payment of any civil penalty assessed. The other terms of the order, including corrective
action, remain in effect unless the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
July 27, 2020
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety