# DENBURY ONSHORE, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 42020009NOA
- **title:** DENBURY ONSHORE, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-11-12
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.110(a), 195.207(c), 195.262(a), 195.402(a), 195.402(c)(3), 195.402(c)(7), 195.403(c), 195.573(e).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42020009noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42020009noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42020009noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42020009NOA
**body:**

Notice of Amendment involving DENBURY ONSHORE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.110(a),  195.207(c),  195.262(a),  195.402(a),  195.402(c)(3),  195.402(c)(7),  195.403(c),  195.573(e). The case was opened on 2020-11-12 and is reported as closed as of 2021-03-08. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42020009NOA_Closure Letter_03082021_(20-179978).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42020009NOA/42020009NOA_Closure%20Letter_03082021_(20-179978).pdf

42020009NOA_Closure Letter_03082021_(20-179978)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42020009NOA/42020009NOA_Closure%20Letter_03082021_(20-179978)_text.pdf

42020009NOA_Notice of Amendment_11122020_(20-179978).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42020009NOA/42020009NOA_Notice%20of%20Amendment_11122020_(20-179978).pdf

42020009NOA_Notice of Amendment_11122020_(20-179978)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42020009NOA/42020009NOA_Notice%20of%20Amendment_11122020_(20-179978)_text.pdf

42020009NOA_Operator Response to Notice_12102020_(20-179978).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42020009NOA/42020009NOA_Operator%20Response%20to%20Notice_12102020_(20-179978).pdf

42020009NOA_Closure Letter_03082021_(20-179978)_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
March 8, 2021
John Filiatrault
Senior Vice President - CO2 Pipeline and Supply
Denbury Onshore, LLC
5320 Legacy Drive
Plano, Texas 75024
CPF 4-2020-009-NOA
Dear Mr. Filiatrault:
From May 11, 2020 through July 29, 2020, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected your Operation and Maintenance Procedure (O&M) manual.
Denbury Onshore submitted its amended procedures on January 8, 2021. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
cc: Chad Docekal, Regulatory Compliance Specialist, Denbury Resources, Inc.,
chad.docekal@denbury.com

42020009NOA_Notice of Amendment_11122020_(20-179978)_text.pdf

NOTICE OF AMENDMENT
ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
November 12, 2020
John Filiatrault
Senior Vice President - CO2 Pipeline and Supply
Denbury Onshore, LLC
5320 Legacy Drive
Plano, Texas 75024
CPF 4-2020-009-NOA
Dear Mr. Filiatrault:
From May 11, 2020 through July 29, 2020, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected your Operation and Maintenance Procedure (O&M) manual.
On the basis of the inspection, PHMSA has identified the apparent inadequacies within Denbury
Onshore, LLC’s plans or procedures, as described below:
1. § 195.402 - Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.110 - External loads.



2. 3. 2
(a) Anticipated external loads (e.g.), earthquakes, vibration, thermal expansion, and
contraction must be provided for in designing a pipeline system. In providing for
expansion and flexibility, Section 419 of ASME/ANSI B31.4 must be followed.
Denbury's O&M manual does not reference Section 419 of ASME/ANSI B31.4 concerning
external loads as referenced in § 195.110. Denbury's O&M manual should be amended to
reference Section 419 of AMSE/ANSI B31.4 with respect to anticipated external loads in
providing for expansion and flexibility.
§ 195.402 - Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.207 - Transportation of pipe.
(a) …
(c) Truck. In a pipeline to be operated at a hoop stress of 20 percent or more of SMYS,
an operator may not use pipe having an outer diameter to wall thickness ratio of 70
to 1, or more, that is transported by truck unless the transportation is performed in
accordance with API RP 5LT (incorporated by reference, see § 195.3).
Denbury's procedure for transportation of pipe(s) is inadequate. Denbury's Engineering
Standards Manual does not provide for the use of API RP 5LT when transporting pipe(s)
by truck. Denbury provides references for API RP 5L1 and 5LW to transport pipe(s) by
rail and marine vessels or barge, but does not provide a reference for API RP 5LT when
transporting pipe(s) by truck. Denbury must amend its procedure to include API RP 5LT
standards when transporting pipe(s) by truck.
§ 195.402 - Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,



3
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.262 - Pumping equipment.
(a) Adequate ventilation must be provided in pump station buildings to prevent the
accumulation of hazardous vapors. Warning devices must be installed to warn of the
presence of hazardous vapors in the pumping station building.
Denbury’s written procedures regarding adequate ventilation within pump stations
buildings are inadequate. Section 17. Heating, Ventilation, and Air Conditioning (HVAC)
Requirements of Denbury's Engineering Design Manual (Section E0200) is insufficient
per § 195.262(a) due to the lack of reference to ventilation provided in pump station
buildings to prevent the accumulation of hazardous vapors, and the lack of reference to
warning devices for hazardous environments when entering enclosed pump station
buildings. This section only references conformance to UBC, IBC, and ASHRAE, in
addition to climate control. Denbury must amend its procedures regarding adequate
ventilation within pump stations buildings to address the requirements of § 195.262(a).
4. § 195.402 - Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
(c) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following to provide safety during
maintenance and normal operations:
(1) ….
(7) Starting up and shutting down any part of the pipeline system in a manner
designed to assure operation within the limits prescribed by § 195.406, consider the
hazardous liquid or carbon dioxide in transportation, variations in altitude along the
pipeline, and pressure monitoring and control devices.
Denbury’s written procedures O&M 0502, High-Pressure Plant Start-Up Procedures of
Denbury's O&M Manual, Sections 2. Scope and 3. Core Information and Requirements are
inadequate per § 195.402(c)(7) as they do not provide written shutdown procedures, but
only start-up procedure steps. The procedures must be amended to ensure operation within



5. 6. 4
limits prescribed by § 195.406 during startup and shutdown and should address the
following:
1. Inspecting all over-pressure protection devices required for the start-up of a new
pipeline, including the testing of set pressures and the checking of capacities, if
necessary;
2. Establishing communication with field personnel and control personnel; and
3. Controlling the flow rate when pressurizing the pipeline and monitoring
pressures until normal operation is established.
§ 195.402 - Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.403 - Emergency response training.
(a) ….
(c) Each operator shall require and verify that its supervisors maintain a thorough
knowledge of that portion of the emergency response procedures established under
§ 195.402 for which they are responsible to ensure compliance.
Denbury's O&M, Emergency Response, Section 4. Training procedures are inadequate as
they do not provide a process to require and verify that supervisors are trained and maintain
a thorough knowledge of the emergency response procedures for which they are
responsible. Denbury must amend its procedures to provide a process for supervisors to be
trained and maintain the necessary knowledge of the emergency response procedures
established under § 195.402.
§ 195.402 - Procedural manual for operations, maintenance, and emergencies.
(a) …
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:



5
(1)….
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
§ 195.573 - What must I do to monitor external corrosion control?
(a) …
(e) Corrective action. You must correct any identified deficiency in corrosion control
as required by § 195.401(b). However, if the deficiency involves a pipeline in an
integrity management program under § 195.452, you must correct the deficiency as
required by § 195.452(h).
Denbury's O&M manual, External Corrosion Control for Buried or Submerged Pipeline,
Section 3.4.7 Remedial Action is inadequate because it does not contain procedures for
responding to deficiencies found by the required monitoring per § 195.573(e).
Denbury must amend its procedures to include a process and time frame for responding to
deficiencies identified during external corrosion control monitoring. The amended
procedures should include a minimum of: (1) a time frame for evaluating data and
determining a course of action; and (2) a time frame for any new installation to be
operational and cathodic protection to be in the adequate range. These time frames should
consider the population density and environmental concerns of the area that could
potentially be affected by a release of a hazardous liquid.



6
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document, you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 60 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed. It is requested (not mandated) that Denbury Onshore, LLC maintain
documentation of the safety improvement costs associated with fulfilling this Notice of
Amendment (preparation/revision of plans, procedures) and submit the total to Mary McDaniel,
Director, Southwest, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 4-2020-009-NOA, and for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Chad Docekal, Regulatory Compliance Specialist, Denbury Resources, Inc.,
chad.docekal@denbury.com