# FREEPORT LNG DEVELOPMENT, L.P. — Notice of Amendment

- **operation:** document
- **citation:** CPF 420201001M
- **title:** FREEPORT LNG DEVELOPMENT, L.P. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-01-27
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(b)(1), 192.605(c)(4), 192.615(b)(2), 192.615(b)(3), 192.805(i).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420201001m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420201001m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420201001m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420201001M
**body:**

Notice of Amendment involving FREEPORT LNG DEVELOPMENT, L.P.. PHMSA's enforcement data identifies the cited regulations as 192.605(b)(1),  192.605(c)(4),  192.615(b)(2),  192.615(b)(3),  192.805(i). The case was opened on 2020-01-27 and is reported as closed as of 2020-04-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420201001M_ Closure Letter_04152020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201001M/420201001M_%20Closure%20Letter_04152020.pdf

420201001M_ Closure Letter_04152020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201001M/420201001M_%20Closure%20Letter_04152020_text.pdf

420201001M_Notice of Amendment_01272020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201001M/420201001M_Notice%20of%20Amendment_01272020.pdf

420201001M_Notice of Amendment_01272020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201001M/420201001M_Notice%20of%20Amendment_01272020_text.pdf

420201001M_Operator Response to Notice_02102020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201001M/420201001M_Operator%20Response%20to%20Notice_02102020.pdf

420201001M_ Closure Letter_04152020_text.pdf

ELECTRONIC MAIL- RETURN RECEIPT REQUESTED
April 15, 2020
Michael S. Smith
Chairman & CEO
Freeport LNG Development, L.P.
333 Clay Street, Suite 5050
Houston, Texas 77002
CPF 4-2020-1001M
Dear Mr. Smith:
From June 25 through September 26, 2019, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected Freeport LNG Development, L.P.’s (FLNG) procedures for it’s natural gas transmission
pipeline system located in Freeport, Texas. As a result of the inspection, Freeport LNG
Development, L.P.’s (FLNG) was issued a Notice of Amendment on January 28, 2020.
FLNG’s amended procedures were received by PHMSA on February 10, 2020. My staff reviewed
the amended procedures and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420201001M_Notice of Amendment_01272020_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 27, 2020
Mr. Michael S. Smith
Chairman & CEO
Freeport LNG Development, L.P.
333 Clay Street, Suite 5050
Houston, Texas 77002
CPF 4-2020-1001M
Dear Mr. Smith:
From June 25 through September 26, 2019, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected Freeport LNG Development, L.P.’s (FLNG) procedures for the its natural gas
transmission pipeline system located in Freeport, Texas.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
FLNG’s plans or procedures, as described below:
1. § 192.605 Procedural manual for operations, maintenance, and emergencies.
(b) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
(1) Operating, maintaining, and repairing the pipeline in accordance with each of the
requirements of this subpart and subpart M of this part.
a. FLNG failed to establish written procedures for the abandonment or deactivation of
facilities in accordance with § 192.727(g) to require the filing of an abandonment report
to the National Pipeline Mapping System (NPMS).



PHMSA reviewed FLNG’s Gas Pipeline Operations and Maintenance Manual
(FLNG-GOM-100) and found it did not provide a provision for the notification of
abandonment in the event FLNG chose to abandon its pipeline facilities that cross the
intracoastal waterway currently used for commercial navigation.
FLNG must amend its written procedures, FLNG-GOM-100, to require the filing as
required by § 192.727(g).
b. FLNG failed to establish written procedures for pressure limiting and regulating
stations in accordance with § 192.743.
PHMSA reviewed FLNG’s Gas Operations Manual (FLNG-GOM-100) and found it
contains references to Gas Distribution systems - 49 CFR §§192.621/623; See sections
2.6.1 and 2.6.3/2.6.4. FLNG does not operate gas distribution facilities, but rather gas
transmission facilities.
FLNG must amend its written procedures to reflect pressure limiting and regulating
stations for the transmission facilities it operates.
2. § 192.605 Procedural manual for operations, maintenance, and emergencies.
(c) Abnormal operation. For transmission lines, the manual required by paragraph (a)
of this section must include procedures for the following to provide safety when
operating design limits have been exceeded:
(4) Periodically reviewing the response of operator personnel to determine the
effectiveness of the procedures controlling abnormal operation and taking corrective
action where deficiencies are found.
FLNG failed to establish written procedures for periodically reviewing the response of
operator personnel to determine the effectiveness of the procedures controlling abnormal
operation and taking corrective action where deficiencies are found.
PHMSA reviewed FLNG’s Gas Pipeline Operations and Maintenance Manual (FLNG-
GOM-100) and noted that the Manual (GOM) does not include procedures for the periodic
review.
FLNG procedures must be amended in accordance with § 192.605(c)(4) and it must include
a provision for documentation of the review.
3. § 192.615 Emergency plans.
(b) Each operator shall:
(2) Train the appropriate operating personnel to assure that they are knowledgeable
2



the emergency procedures and verify that the training is effective.
FLNG’s written Emergency Plan does not include training for the appropriate operating
personnel to ensure that they are knowledgeable of the emergency procedures as required
by § 192.615(b)(2).
During the inspection, PHMSA reviewed the FLNG-GOM-100 (Gas Pipeline Operations
and Maintenance Manual). It was noted that Section 10-Emergency Plan does not contain
a reference or procedures pertaining to the training of appropriate operating personnel.
FLNG must amend its Emergency Plan to include a training program in the Emergency
Plan for the appropriate operating personnel of the 42-inch natural gas transmission
pipeline and must include a provision for documentation of the training.
4. § 192.615 Emergency plans.
(b) Each operator shall:
(3) Review employee activities to determine whether the procedures were effectively
followed in each emergency.
FLNG’s written Emergency Plan does not include a review of employee activities to
determine whether the procedures were effectively followed in each emergency as required
by § 192.615(b)(3).
During the inspection, PHMSA reviewed the FLNG-GOM-100 (Gas Pipeline Operations
and Maintenance Manual). It was noted that Section 10-Emergency Plan does not contain
procedures for the review of appropriate operating personnel activities to determine
whether the procedures were effectively followed in each emergency.
FLNG must amend the Emergency Plan to include a review of employee activities to
determine that procedures were effectively followed in each emergency and must include
a provision for documentation of that review.
5. § 192.805 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(i) After December 16, 2004, notify the Administrator or a state agency the
participating under 49 U.S.C. Chapter 601 if the operator significantly modifies
program after the administrator or state agency has verified that it complies
with this section. Notifications to PHMSA may be submitted by electronic mail
to InformationResourcesManager@dot.gov, or by mail to ATTN: Information
3



Resources Manager DOT/PHMSA/OPS, East Building, 2nd Floor, E22-321, New
Jersey Avenue SE., Washington, DC 20590.
FLNG’s Operator Qualification (OQ) program was inadequate because it failed to define
“significant” and provide PHMSA’s accurate email or mailing address.
During the inspection, PHMSA reviewed the “revised” FLNG OQ Program. FLNG does
not define “significant” changes that require the operator to make notifications to PHMSA
to comply with the OQ regulations, nor does it have the correct PHMSA email and/or
mailing address to submit significant change notifications.
FLNG must define significant as it applies to OQ Program modifications in its Operator
Qualification Plan and update PHMSA’s email and mailing address.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
4



It is requested (not mandated) that FREEPORT LNG DEVELOPMENT, L.P. (FLNG) maintain
documentation of the safety improvement costs associated with fulfilling this Notice of
Amendment (preparation/revision of plans, procedures) and submit the total to Mary L. McDaniel,
P.E. Director, Southwest Region, Pipeline and Hazardous Materials Safety Administration. In
correspondence concerning this matter, please refer to CPF 4-2020-1001M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
cc: Mark Mallett, Vice President of Operations & Engineering, Freeport LNG Development, L.P.,
333 Clay Street, Suite 5050, Houston, Texas 77002
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
5
- **truncated:** false