# ANR PIPELINE CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 420201011M
- **title:** ANR PIPELINE CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-11-16
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.225(a), 192.616(a), 192.616(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420201011m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420201011m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420201011m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420201011M
**body:**

Notice of Amendment involving ANR PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 192.225(a),  192.616(a),  192.616(c). The case was opened on 2020-11-16 and is reported as closed as of 2021-04-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420201011M_Closure Letter_04302021_(18-163745S).pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201011M/420201011M_Closure%20Letter_04302021_(18-163745S).pdf

420201011M_Closure Letter_04302021_(18-163745S)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201011M/420201011M_Closure%20Letter_04302021_(18-163745S)_text.pdf

420201011M_Notice of Amendment_ 11162020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201011M/420201011M_Notice%20of%20Amendment_%2011162020.pdf

420201011M_Notice of Amendment_ 11162020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420201011M/420201011M_Notice%20of%20Amendment_%2011162020_text.pdf

420201011M_Notice of Amendment_ 11162020_text.pdf

NOTICE OF AMENDMENT
ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
November 16, 2020
Stanley Chapman III
Executive VP & President U.S. Pipelines
ANR Pipeline Company
700 Louisiana Street
Houston, Texas 77002
CPF 4-2020-1011M
Dear Mr. Chapman:
From March 8, 2019 through January 8, 2020, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected ANR Pipeline Company’s procedures for its Southwest North (Mid America Region -
Southeast Mainline) Pipelines, Loop Lines 501, 1-501, and 2-501, and System 1168 in Louisiana,
Mississippi, Arkansas, Tennessee, and Kentucky.
Based on the inspection, PHMSA has identified the apparent inadequacies found within ANR
Pipeline Company’s plans or procedures, as described below:
1. § 192.225 Welding procedures
(a) Welding must be performed by a qualified welder or welding operator in
accordance with welding procedures qualified under section 5, section 12, Appendix
A or Appendix B of API Std 1104 (incorporated by reference, see § 192.7), or section
IX of the ASME Boiler and Pressure Vessel Code (ASME BPVC) (incorporated by
reference, see § 192.7) to produce welds meeting the requirements of this subpart. The
quality of the test welds used to qualify welding procedures must be determined by
destructive testing in accordance with the applicable welding standard(s).



2
ANR Pipeline Company’s (ANR) qualified welding procedures did not identify the correct edition
of API Standard 1104 that is incorporated by reference in § 192.225. During the inspection, the
PHMSA inspector reviewed the following ANR qualified welding procedures: X70-0-GW-10,
dated May 8, 2012; X60-0-BW-19, dated April 25, 2011; X60-0-GW-01, dated April 25, 2011;
X70-08-RP-12, dated September 6, 2011; and X70-8-RP-13, dated September 6, 2011.
These welding procedures state that “The information in this data sheet is correct and based on
welding procedure specifications that meet the qualification requirements of the latest edition of
API 1104.” Additionally, the welding procedures either stated that “NDT – 100% MPI in
accordance with the requirements of the current edition of API 1104” or “NDT – 100%
radiography in accordance with the requirements of the current edition of API 1104.” ANR’s
welding procedures do not specify the edition of API Standard 1104 that is incorporated by
reference in Part 192a but instead referred to the “latest edition” or “current edition” of API
Standard 1104.
ANR must amend its qualified welding procedures to specify the edition of API Standard 1104
that is incorporated by reference in Part 192.
2. § 192.616 Public Awareness
(a) Except for an operator of a master meter or petroleum gas system covered under
paragraph (j) of this section, each pipeline operator must develop and implement
a written continuing public education program that follows the guidance provided
in the American Petroleum Institute's (API) Recommended Practice (RP) 1162
(incorporated by reference, see § 192.7).
ANR’s TC Energy Public Awareness Program (US) (PAP), dated September 3, 2019, was
inadequate because it did not follow the general program recommendations provided in Sections
2, 4, and 6 of the American Petroleum Institute’s (API) Recommended Practice (RP) 1162,
incorporated by reference in § 192.616(a).
ANR’s PAP did not include the supplemental enhancements required by API RP 1162, Section
6.1.3, Coverage Areas. A review of ANR’s PAP revealed that the PAP did not include “Table 6-
1.” Specifically, “Table 6-1” is referenced under Section 12 Supplemental Enhancements –
Broader Coverage Areas, when discussing broadening the area of coverage beyond those defined
in “Table 6-1.”
ANR must amend its PAP to include Table 6-1.
a Section 192.7(b)(9) identifies “API Standard 1104, “Welding of Pipelines and Related Facilities,” 20th edition,
October 2005, including errata/addendum (July 2007) and errata 2 (2008), (API Std 1104),” as the edition
incorporated by reference in §§ 192.225(a); 192.227(a); 192.229(c); 192.241(c); and Item II, Appendix B.



3
3. § 192.616 Public Awareness
(a) . . .
(c) The operator must follow the general program recommendations, including
baseline and supplemental requirements of API RP 1162, unless the operator
provides justification in its program or procedural manual as to why compliance
with all or certain provisions of the recommended practice is not practicable and
not necessary for safety.
ANR’s PAP is inadequate because it did not include specific delivery methods and delivery
frequencies for supplement communications that the company had identified. Specifically, in
ANR’s most recent 2018 Effectiveness Review, ANR selected the agricultural community in
developing a new targeted communications strategy for this community; however, ANR did not
include any communication methods or frequencies to address this supplemental enhancement for
the agriculture community in its PAP. Additionally, “Table 8-1 Baseline Delivery Frequency and
Method of Delivery” of ANR’s PAP utilizes the term “ongoing” to describe the supplemental
delivery frequency. However, this term is ambiguous and does not provide a clear definition of
“delivery frequencies or methods.”
ANR must amend its PAP to incorporate the supplemental enhancement that it identified for
agricultural communications in its 2018 Effectiveness Review. ANR must also amend its PAP to
provide a more definitive delivery frequency and method for the supplemental delivery frequency
in “Table 8-1.”
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document, you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of



4
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that ANR Pipeline Company maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Mary McDaniel, Director, Southwest Region, Pipeline
and Hazardous Materials Safety Administration. In all correspondence concerning this matter,
please refer to CPF 4-2020-1011M, and for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings

420201011M_Closure Letter_04302021_(18-163745S)_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
April 30, 2021
Stanley Chapman, III
Executive VP & President U.S. Pipelines
TC Energy
700 Louisiana Street
Houston, Texas 77002
CPF 4-2020-1011M
Dear Mr. Chapman:
From March 8, 2019 through January 8, 2020, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of TC Energy’s subsidiary, ANR Pipeline
Company’s procedures for its Southwest North (Mid America Region - Southeast Mainline)
Pipelines, Loop Lines 501, 1-501, and 2-501, and System 1168 in Louisiana, Mississippi,
Arkansas, Tennessee, and Kentucky. As a result of the inspection, ANR Pipeline Company was
issued a Notice of Amendment on November 16, 2020, which proposed an amendment of its
procedures.
ANR Pipeline Company submitted its amended procedures on December 16, 2020, followed by a
supplemental amendment of those procedures on February 8, 2021. PHMSA staff reviewed the
amended procedures, and it appears that the inadequacies outlined in the Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration