# BRAVO PIPELINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 420205016M
- **title:** BRAVO PIPELINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2020-11-24
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.452(m), 195.503(b), 195.505(b), 195.505(e), 195.52(b)(6), 195.52(b)(7), 195.52(c), 195.52(d), 195.573(a)(1), 195.583(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420205016m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420205016m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420205016m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420205016M
**body:**

Notice of Amendment involving BRAVO PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.452(m),  195.503(b),  195.505(b),  195.505(e),  195.52(b)(6),  195.52(b)(7),  195.52(c),  195.52(d),  195.573(a)(1),  195.583(c). The case was opened on 2020-11-24 and is reported as closed as of 2021-06-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420205016M_ Notice of Amendment_11242020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420205016M/420205016M_%20Notice%20of%20Amendment_11242020.pdf

420205016M_ Notice of Amendment_11242020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420205016M/420205016M_%20Notice%20of%20Amendment_11242020_text.pdf

420205016M_Closure Letter_06112021_(17-158457S).pdf: https://primis.phmsa.dot.gov/enforcement-documents/420205016M/420205016M_Closure%20Letter_06112021_(17-158457S).pdf

420205016M_Closure Letter_06112021_(17-158457S)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420205016M/420205016M_Closure%20Letter_06112021_(17-158457S)_text.pdf

420205016M_Operator Response to Notice_02252021.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420205016M/420205016M_Operator%20Response%20to%20Notice_02252021.pdf

420205016M_Closure Letter_06112021_(17-158457S)_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
June 11, 2021
Vishal Gupta
President and General Manager
Permian EOR at Occidental Petroleum
5 Greenway Plaza
Houston, Texas 77046
CPF 4-2020-5016M
Dear Mr. Gupta:
From January 22, 2018 through May 4, 2018, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected Occidental Petroleum Corporation’s (OXY) Bravo Pipeline System operations,
maintenance, and emergency response procedures in Sundown, Texas. As a result of the
inspection, PHMSA issued a Notice of Amendment to OXY on November 24, 2020, which
proposed amendments to its procedures.
OXY submitted its final amended procedures on February 25, 2021. PHMSA staff reviewed the
amended procedures, and it appears the inadequacies identified in this Notice of Amendment have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420205016M_ Notice of Amendment_11242020_text.pdf

NOTICE OF AMENDMENT
ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
November 24, 2020
Rob Peterson
Senior Vice President
Permian EOR at Occidental Petroleum
5 Greenway Plaza
Houston, Texas 77046
CPF 4-2020-5016M
Dear Mr. Peterson:
From January 22, 2018 through May 4, 2018, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected Occidental Petroleum Corporation’s (OXY) Bravo Pipeline System operations,
maintenance, and emergency response procedures in Sundown, Texas.
Based on the inspection, PHMSA has identified the apparent inadequacies found within Occidental
Petroleum Corporation’s Bravo Pipeline System’s plans or procedures, as described below:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted



2
§ 195.52 Immediate notice of certain accidents.
(b) Information required. Each notice required by paragraph (a) of this section must
be made to the National Response Center either by telephone to 800-424-8802 (in
Washington, DC, 202-267-2675) or electronically at http://www.nrc.uscg.mil and
must include the following information:
(6) Initial estimate of amount of product released in accordance with paragraph
(c) of this section.
(7) All other significant facts known by the operator that are relevant to the cause
of the failure or extent of the damages.
(c) Calculation. A pipeline operator must have a written procedure to calculate and
provide a reasonable initial estimate of the amount of released product.
(d) New information. Within 48 hours after the confirmed discovery of an accident,
to the extent practicable, an operator must revise or confirm its initial telephonic
notice required in paragraph (b) of this section with a revised estimate of the amount
of product released, location of the failure, time of the failure, a revised estimate of
the number of fatalities and injuries, and all other significant facts that are known by
the operator that are relevant to the cause of the accident or extent of the damages. If
there are no changes or revisions to the initial report, the operator must confirm the
estimates in its initial report.
OXY’s Bravo Pipeline reporting procedures in OMER Book 1, Section 7-Emergencies and
Accident Reporting (Revised 03/16/10), pages 2, 3, and 4, did not include all the information
required by § 195.52 for immediately reporting accidents to the National Response Center.
OXY must update the “Emergencies and Accident Reporting” requirements listed in the Oxy
Bravo Pipeline’s OM&ER Book 1, Section 7 to reflect the requirements in § 195.52 pertaining to
the immediate notice of certain accidents.
2. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.571 What criteria must I use to determine the adequacy of cathodic protection?
Cathodic protection required by this subpart must comply with one or more of the
applicable criteria and other considerations for cathodic protection contained



3
paragraphs 6.2.2, 6.2.3, 6.2.4, 6.2.5 and 6.3 in NACE SP 0169 (incorporated by
reference, see § 195.3).
OXY’s Bravo Pipeline’s OMER Book 1, Section 16 Corrosion Control (Revised 06/12/08)
procedures were inadequate regarding the application of cathodic protection criteria used to
evaluate the adequacy of cathodic protection. OXY’s “RE: §195.571 Cathodic Protection Criteria”
procedure did not identify the use of the 100 mV polarization criterion as a pipe-to-soil criterion
used to determine the adequacy of cathodic protection for buried pipelines.
OXY must revise its “RE: §195.571 Cathodic Protection Criteria” procedure to include detailed
procedures for the application of the 100 mV polarization criterion as a pipe-to-soil criterion used
to determine the adequacy of cathodic protection for OXY’s Bravo CO2 pipelines. Since OXY
used the 100 mV polarization criterion to determine the adequacy of cathodic protection for several
of its pipeline segments, it must also state reasons and justification in its procedures for the use of
this criterion.
Furthermore, OXY’s “RE: §195.571 Cathodic Protection Criteria” procedure lacks sufficient
detail on consideration given to voltage drops other than those across the pipe-to-soil boundary
(IR drop) as recommended by NACE SP 0169 when using the pipe-to-soil criterion of negative
(cathodic) potential of at least 850 millivolts, with cathodic protection current applied.
OXY must revise its “RE: §195.571-Cathodic Protection Criteria” procedure to include detailed
procedures for consideration given to voltage drops other than those across the pipe-to-soil
boundary (IR drop) when the 850 millivolts with cathodic protection current applied criterion is
used to determine the adequacy of cathodic protection.
3. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.573 What must I do to monitor external corrosion control?
(a) Protected pipelines. You must do the following to determine whether cathodic
protection required by this subpart complies with § 195.571:
(1) Conduct tests on the protected pipeline at least once each calendar year, but
with intervals not exceeding 15 months. However, if tests at those intervals are
impractical for separately protected short sections of bare or ineffectively coated
pipelines, testing may be done at least once every 3 calendar years, but with
intervals not exceeding 39 months.



4
OXY Bravo Pipeline’s OMER Book 1, Section 16 Corrosion Control (Revised 06/12/08)
procedures were inadequate regarding the remediation of deficient pipe-to-soil readings identified
during annual surveys, which are required to determine if cathodic protection for buried pipelines
is adequate and in compliance with § 195.571. OXY’s “RE: §195.573 (a1)-Pipe to soil monitoring
(annually/15 months)” procedure did not include a timeline to remediate cathodic protection
deficiencies identified during annual surveys in accordance with §195.573(e).
OXY must revise its operations, maintenance, & emergency response procedures manual, OMER
Book 1, Section 16 Corrosion Control (Revised 06/12/08) procedures to include a timeline for
remediation of pipe-to-soil readings’ deficiencies identified during annual surveys.
4. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a manual
of written procedures for conducting normal operations and maintenance activities
and handling abnormal operations and emergencies. This manual shall be reviewed
at intervals not exceeding 15 months, but at least once each calendar year, and
appropriate changes made as necessary to insure that the manual is effective. This
manual shall be prepared before initial operations of a pipeline system commence,
and appropriate parts shall be kept at locations where operations and maintenance
activities are conducted.
§ 195.583 What must I do to monitor atmospheric corrosion control?
(c) If you find atmospheric corrosion during an inspection, you must provide
protection against the corrosion as required by § 195.581.
OXY Bravo Pipeline’s OMER Book 1, Section 16 Corrosion Control (Revised 06/12/08)
procedures were inadequate regarding the atmospheric corrosion inspection remediation. OXY’s
“RE: §195.583-Monitoring Atmospheric Corrosion Control” procedure did not include a timeline
to remediate deficiencies identified during atmospheric corrosion inspections in accordance with
§ 195.581.
OXY must revise its operations, maintenance, & emergency response procedures manual, OMER
Book 1, Section 16 Corrosion Control (Revised 06/12/08) procedures to include a timeline for
remediation of deficiencies identified during atmospheric corrosion inspections.
5. § 195.452 Pipeline integrity management in high consequence areas.
(m) How does an operator notify PHMSA? An operator must provide any
notification required by this section by:
(1) Sending the notification by electronic mail to Information Resources Manger
@dot.gov; or,



5
(2) Sending the notification by mail to ATTN: Information Resources Manager,
DOT/PHMSA/OPS, East Building, 2nd Floor, E22-321, 1200 New Jersey Ave SE.,
Washington, DC 20590
OXY failed to update the PHMSA notification contact information included in “Section 6.7.3” of
Occidental Oil and Gas Corporation’s HES Integrity Management Program Manual to be
consistent with what is currently listed in § 195.452(m)(1) and (2).
OXY must revise “Section 6.7.3” of Occidental Oil and Gas Corporation’s HES Integrity
Management Program Manual to match what is currently listed in § 195.452(m)(1) and (2), to
include the email and physical address for PHMSA as well as delete the outdated PHMSA contact
information.
6. § 195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(e) Evaluate an individual if the operator has reason to believe that the individual
is no longer qualified to perform a covered task;
OXY’s Bravo Pipeline Company’s Operator Qualification Program, Section 7.5 Re-
evaluation/Qualification failed to describe in sufficient detail the re-evaluation process if an
individual is no longer considered qualified or if a qualified individual fails an evaluation. The
time frame for receiving retraining and repeating evaluations was not defined. Furthermore, when
remedial training is required for individuals no longer considered qualified to perform a covered
task, the process did not identify the individual who initiates or reviews the re-training (for
example, individual’s supervisor, proctor/evaluator, or subject matter expert).
To satisfy the requirement of § 195.505(e), OXY must revise the Bravo Pipeline Company’s
Operator Qualification Program, Section 7.5 Re-evaluation/Qualification to include additional
guidance regarding the timeframe between a failed evaluation of a covered task and repeating the
same covered task for re-evaluation, as well as guidance on the individual within the organization
responsible for initiating the remedial training for an individual no longer considered qualified to
perform a covered task.
7. § 195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(b) Ensure through evaluation that individuals performing covered tasks
are qualified;
§ 195.503 Definitions.
Qualified means that an individual has been evaluated and can:
(b) Recognize and react to abnormal operating condition



6
OXY failed to ensure that the abnormal operating conditions (AOCs) listed for several Bravo
Pipeline Company’s covered tasks were specific enough to ensure that employees can recognize
and react to the AOCs associated with the covered task. As a result, OXY failed to ensure that
individuals performing covered tasks on its pipeline system were properly qualified. The AOCs
identified were not specific and relevant to each covered task in its Operator Qualification
Program (OQ) (Revised June 10, 2006) and thus could not evaluate an individual's ability to
recognize and react to AOCs while performing each covered task.
During the inspection, the PHMSA inspector reviewed the following OQ covered tasks: (1) Oxy
Bravo “Pipeline Operations Task # 9 CP Rectifier, Taking Readings” (Rev. 7); (2) Oxy Bravo
“Pipeline Operations Task # 10 Rectifier Maintenance” (Rev. 8); and (3) Oxy Bravo “Pipeline
Operations Task #20 Mainline Valves Inspection” (Rev. 6). These three covered tasks listed
identical AOCs and did not include specific conditions that may indicate a malfunction of a
component or deviation from normal operations that may indicate a condition exceeding design
limits, or result in a hazard(s) to persons, property, or the environment.
OXY did not meet the minimum requirements for the operator qualification as required by
§ 195.503 and § 195.505 by failing to ensure that the AOCs listed for several OXY Bravo
Pipeline’s covered tasks were specific enough to ensure employees can recognize and react to the
AOCs associated with the covered task.
OXY must review and revise each of its OQ Program covered tasks to ensure that the AOCs are
appropriate for the covered task. AOCs identified and used in evaluating individuals should
represent those that could reasonably be anticipated during the performance of the covered tasks.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).



7
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Occidental Petroleum Corporation maintain documentation of
the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Mary L. McDaniel, P.E.,
Southwest Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 4-2020-5016M, and for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
- **truncated:** false
- **body characters:** 19254