# CENTURION PIPELINE L.P. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42021005NOPV
- **title:** CENTURION PIPELINE L.P. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-02-11
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.440(a), 195.440(c), 195.452(f)(3), 195.573(e), 195.64(c)(1)(ii).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42021005nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42021005nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42021005nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42021005NOPV
**body:**

Notice of Probable Violation involving CENTURION PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.440(a),  195.440(c),  195.452(f)(3),  195.573(e),  195.64(c)(1)(ii). The case was opened on 2021-02-11 and is reported as closed as of 2022-07-29. Proposed civil penalty: $96,200. Assessed civil penalty: $72,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42021005NOPV_Closure Letter_07292022_(20-171911).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_Closure%20Letter_07292022_(20-171911).pdf

42021005NOPV_Closure Letter_07292022_(20-171911)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_Closure%20Letter_07292022_(20-171911)_text.pdf

42021005NOPV_Final Order_11192021_(20-171911).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_Final%20Order_11192021_(20-171911).pdf

42021005NOPV_Final Order_11192021_(20-171911)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_Final%20Order_11192021_(20-171911)_text.pdf

42021005NOPV_Operator Response to Notice_ 04012021_(20-171911).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_Operator%20Response%20to%20Notice_%2004012021_(20-171911).pdf

42021005NOPV_PCP PCO_02112021_(20-171911).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_PCP%20PCO_02112021_(20-171911).pdf

42021005NOPV_PCP PCO_02112021_(20-171911)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021005NOPV/42021005NOPV_PCP%20PCO_02112021_(20-171911)_text.pdf

42021005NOPV_Final Order_11192021_(20-171911)_text.pdf

November 19, 2021
VIA ELECTRONIC MAIL TO: m.prince@lotusmidstream.com
Mr. Michael Prince
President and Chief Executive Officer
Lotus Midstream, LLC
2150 Town Square Place, Suite 395
Sugar Land, Texas 77479
Re: CPF No. 4-2021-005-NOPV
Dear Mr. Prince:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, assesses a reduced civil penalty of $72,000, and specifies actions that need to be taken
by Centurion Pipeline, LP, to comply with the pipeline safety regulations. The penalty payment
terms are set forth in the Final Order. When the civil penalty has been paid and the terms of the
compliance order completed, as determined by the Director, Southwest Region, this enforcement
action will be closed. Service of the Final Order by e-mail is effective upon the date of
transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ms. Mary McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Michael Morgan, Vice President of Operations & Engineering, Centurion Pipeline, LP,
michael_morgan@centurionpl.com
Mr. Cutty Cunningham, Director of Integrity Management, Centurion Pipeline, LP,
cutty_cunningham@centurionpl.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Centurion Pipeline, LP, ) CPF No. 4-2021-005-NOPV
a subsidiary of Lotus Midstream, LLC, )
)
Respondent. )
____________________________________)
FINAL ORDER
From April 6, 2020 through September 11, 2020, pursuant to 49 U.S.C. § 60117, representatives
of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety (OPS), conducted a virtual pipeline safety inspection of the facilities and records of
Centurion Pipeline, LP, (Centurion or Respondent), a wholly-owned subsidiary of Lotus
Midstream, LLC. The Centurion Pipeline System is an integrated network of approximately
3,000 miles of crude oil gathering and transportation pipelines that extends from southeast New
Mexico across the Permian Basin of West Texas to Cushing, Oklahoma.1
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated February 11, 2021, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that Centurion committed three violations of 49 C.F.R. Part 195,
proposed assessing a civil penalty of $96,200 for the alleged violations, and proposed ordering
Respondent to take certain measures to correct the alleged violations. The Notice also included
an additional warning item pursuant to 49 C.F.R. § 190.205, which required no further action,
but warned the operator to correct the probable violation or face possible future enforcement
action.
Centurion responded to the Notice by letter dated April 1, 2021 (Response).2 Centurion
contested all of the allegations, offered additional information in response to the Notice, and
requested that the proposed civil penalty be reduced or eliminated. Respondent did not request a
hearing and therefore has waived its right to one.
1 https://www.lotusmidstream.com/about-us (last accessed July 23, 2021).
2 Centurion requested an extension of time to respond to the Notice on March 5, 2021. The Southwest Region
Director granted the extension through April 4, 2021.



CPF No. 4-2021-005-NOPV
Page 2
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(3) which states, in
relevant part:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) …
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written integrity
management program:
(1) …
(3) An analysis that integrates all available information about the
integrity of the entire pipeline and the consequences of a failure (see
paragraph (g) of this section);
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(3) by failing to include in its
integrity management program (IMP) an analysis that integrates all available information about
the integrity of the entire pipeline and the consequences of a failure. Specifically, the Notice
alleged that Centurion’s risk analysis process, outlined in its IMP, considers the consequences of
a failure on the line pipe in Centurion’s system, but fails to consider the consequences of a
failure of any facility components in the system. The Notice also alleged Centurion’s Pipeline
and Facility Integrity Manager (PFIM), which Centurion uses to determine the risk rankings of
pipeline segments and assess the benefits of preventative and mitigative measures on the risk of
the pipeline segments, does not consider facility components like breakout tanks and pumps in
the algorithm used to calculate risk.
In its Response, Centurion argues it does consider the risks of releases from facilities in its
system in its Spill Prevention, Control and Countermeasure (SPCC) plans for its facilities.
Centurion argues the SPCC plans contain risk mitigation counter measures and control measures
to minimize the possibility of a release of oil from facility boundaries. Centurion also states that
its risk analysis program uses information from different sources and integrates all available
information in the risk algorithm.
Section 195.452(f) includes the required elements of every integrity management plan. Of those
elements is a complete analysis of all information available to each operator about all
components of its system that could affect an HCA and the consequences of failures on its



CPF No. 4-2021-005-NOPV
Page 3
system.3 Centurion does not contest that Section 4 of its Integrity Management Program Manual
titled, Risk Analysis, fails to incorporate information regarding consequences of facility failures
on Centurion’s system in its analysis process. Rather, Centurion states that facility failures are
considered in its SPCC plans. Section 4 of the Manual makes no reference to the incorporation
of information from the SPCC in conducting analyses of consequences of failures on Centurion’s
system. Further, Centurion did not provide any evidence showing one complete analysis of both
line pipe and facilities was performed in accordance with the regulation, which requires one
analysis that integrates all available information about the integrity of the entire pipeline and the
consequences of a failure. Accordingly, after considering all of the evidence, I find that
Respondent violated 49 C.F.R. § 195.452(f)(3) by failing to include in its IMP an analysis that
integrates all available information about the integrity of the entire pipeline and the
consequences of a failure.
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.573(e) which states:
§ 195.573 What must I do to monitor external corrosion control?
(a) …
(e) Corrective action. You must correct any identified deficiency in
corrosion control as required by § 195.401(b). However, if the deficiency
involves a pipeline in an integrity management program under §195.452,
you must correct the deficiency as required by § 195.452(h).
The regulation references § 195.401(b), which states:
§ 195.401 What must I do to monitor external corrosion control?
(a) …
(b) An operator must make repairs on its pipeline system according to
the following requirements:
(1) Non Integrity management repairs. Whenever an operator discovers
any condition that could adversely affect the safe operation of its pipeline
system, it must correct the condition within a reasonable time. However, if
the condition is of such a nature that it presents an immediate hazard to
persons or property, the operator may not operate the affected part of the
system until it has corrected the unsafe condition.
The Notice alleged that Respondent violated 49 C.F.R. § 195.573(e) by failing to correct any
identified deficiency in corrosion control as required by § 195.401(b). Specifically, the Notice
alleged that Centurion identified 22 test points that did not meet cathodic protection (CP) criteria
3 Part 195 defines “pipeline” as all parts of a pipeline facility through which a hazardous liquid or carbon dioxide
moves in transportation, including, but not limited to, line pipe, valves, and other appurtenances connected to line
pipe, pumping units, fabricated assemblies associated with pumping units, metering and delivery stations and
fabricated assemblies therein, and breakout tanks. Section 195.452(f)(1) requires an identification of all pipeline
segments that could affect a high consequence area. Section 195.452(f)(3), therefore, requires an operator to
integrate all available information concerning the entire pipeline, including non linear facilities, such as pump
stations and breakout tanks. See In the Matter of Rocky Mountain Pipeline System, CPF No. 5-2004-2006, 2006 WL
4488857, at *2 (Dec. 11, 2006).



CPF No. 4-2021-005-NOPV
Page 4
on its 12-inch Cedar Canyon to JAL pipeline segment, a non-HCA segment, in 2018, 2019, and
2020. The Notice alleged that Centurion failed to correct the deficiencies in accordance with
§ 195.401(b), which requires that any condition that could adversely affect the safe operation of
a pipeline system be corrected within a reasonable time. Finally, the Notice alleged Centurion
also failed to follow its own Corrosion Control Manual by not applying the 100 millivolt shift
criteria after the negative 0.85-volt criteria was not achieved, until corrective actions were
planned to remediate the corrosion control deficiency.
In its Response, Centurion does not contest that numerous test points did not meet corrosion
control criteria from 2018 to 2020, but argues Centurion did not fail “to meet any discrete
regulatory requirement.” Centurion provided a detailed timeline of activities related to the
corrosion control deficiencies on the Cedar Canyon to JAL segment beginning in August 2017
and ending in March 2021. Centurion argues the actions outlined in its timeline show it took
actions to install CP systems that were “progressive and reasonable.”
In Centurion’s timeline of events in the Response, Centurion explains the actions it took to
address the test points that did not meet the required criteria beginning on the segment’s in-
service date of August 20, 2017. Centurion states it first discovered that 42 out of 48 test points
were below the required criteria in January 2018. Centurion states that “system rectifiers were
adjusted at this time to provide more output,” but does not report the results of that action.4 In
September 2018, Centurion states it installed a new ground bed on the JAL station end of the
segment to improve CP coverage, but reported the next survey conducted in January 2019
showed that 48 of 48 test points were deficient. The next action Centurion took was in
November 2019 when it conducted a close interval survey (CIS) and the results were used to
select locations for two new rectifiers and ground beds along the segment. Centurion states that
permits were required from the New Mexico Bureau of Land Management (BLM) and that Excel
Energy, the electric contractor, reported to Centurion an initial denial of the permit applications.
Next, in January 2020, Centurion’s third survey showed 22 of 48 test points were deficient.
Centurion reports it ran an in-line inspection (ILI) tool in October 2020 that showed no
significant external corrosion anomalies along the 22 deficient test points. In November 2020,
Centurion installed the new ground beds and rectifiers and states they could not be energized due
to electric power and COVID-19 restrictions. Centurion reports that “negotiations between the
electric company and BLM broke down in late 2020,” but the permits were ultimately granted in
“early 2021.” The new rectifiers and ground beds were fully energized in March 2021 and the
test points all showed criteria was met on March 18, 2021.
While Respondent contends the phrase “reasonable period of time” in § 195.401(b) is not a
discrete regulatory requirement, previous PHMSA final orders have interpreted the phrase to
mean that a deficiency must be remediated before the next required survey, which is generally no
longer than 15 months from the time of discovery, the maximum time allowed between annual
4 Centurion Pipeline, LP’s Response to the Notice (April 1, 2021), at 3. Respondent contended the low readings
were “only 5 months after the in-service date of the pipeline, so the low readings at this time were acceptable under
the regulations.” To the contrary, § 195.563(a) requires each pipeline to have cathodic protection in operation not
later than one year after the pipeline is “constructed, relocated, replaced, or otherwise changed, as applicable.” It is
not based on the much later in-service date as Respondent contended.



CPF No. 4-2021-005-NOPV
Page 5
cathodic protection surveys under § 195.573(a)(1).5 Centurion first discovered corrosion control
deficiencies on the Cedar Canyon to JAL segment in January of 2018 and did not remediate the
deficiency until March 18, 2021, over three years later. Centurion installed a new ground bed on
one end of the pipeline after discovering the issue, but failed to ensure that such actions actually
remediated the CP deficiencies. By the time of the following annual survey, all 48 test points
along the pipeline were deficient, so this action did not resolve the CP deficiencies that were
occurring at all of the test points along the entire segment. At that point, Respondent had failed
to comply with § 195.573(e). Moreover, in November 2019, approximately 22 months after
initially discovering the CP deficiencies, Centurion conducted a CIS to determine a workable
solution to the known problems. The delays in the permitting process after coming up with the
plan to install and energize ground beds and rectifiers that were capable to resolving the deficient
CP further lengthened the delay in remediation. Centurion’s actions to correct identified
corrosion control deficiencies were not reasonable because it failed to correct the deficiencies by
the next annual survey and, thereafter, did not take steps to develop a plan for correcting the
deficiencies until approximately 22 months after discovery. I note, however, that Centurion’s
efforts to remediate the deficiencies, even though untimely, are considered below with regard to
the penalty.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.573(e) by failing to correct any identified deficiency a corrosion control as required by
§ 195.401(b).
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.440(c), which states:
§ 195.440 Public awareness.
(a) Each pipeline operator must develop and implement a written
continuing public education program that follows the guidance provided in
the American Petroleum Institute's (API) Recommended Practice (RP)
1162 (incorporated by reference, see §195.3).
(b) …
(c) The operator must follow the general program recommendations,
including baseline and supplemental requirements of API RP 1162, unless
the operator provides justification in its program or procedural manual as to
why compliance with all or certain provisions of the recommended practice
is not practicable and not necessary for safety.
The Notice alleged that Respondent violated 49 C.F.R. § 195.440(c) by failing to follow the
general program recommendations, including the baseline and supplemental requirements, of
API RP 1162 in measuring the effectiveness of Centurion’s Public Awareness Program.
Specifically, the Notice alleged that Centurion failed to measure the bottom-line results of the
program by tracking third-party incidents and consequences, including near misses, excavation
damage resulting in pipeline failures, and excavation damages that do not result in pipeline
5 E.g., In the Matter of Sunoco Pipeline, LP, CPF 1-2014-5005, 2016 WL 770393, at *3 (Jan. 13, 2016); See also,
In the Matter of Colonial Pipeline Company, CPF 2-2008-5005, 2010 WL 6518285, at *4 (July 12, 2010) (“PHMSA
has generally considered a “reasonable time' to be the maximum time allowed between required annual cathodic
protection surveys (15 months maximum from the discovery of a deficient survey reading).”).



CPF No. 4-2021-005-NOPV
Page 6
features.
In its Response, Centurion argues that it had conducted a four-year effectiveness review of its
Public Awareness Program that included bottom-line results. Centurion states its Public
Awareness Manual, Section 11, “Four-Year Effectiveness Evaluation,” Measure 4, “Bottom Line
Results,” requires an annual survey to be conducted. Centurion states these annual reviews
include tracking of One-Call tickets requiring action and third-party line strikes. Centurion
argues this procedure requires consideration of bottom-line results, and therefore, complies with
API RP 1162.
Section 8 of API RP 1162 provides the recommendations that must be followed by operators for
periodically evaluating the effectiveness of their public awareness programs. The RP states that
an evaluation of the effectiveness of public awareness program implementation should occur no
more than four years apart and lays out four measures that should be used to determine
effectiveness. Measure 4, “Achieving Bottom-Line Results,” states:
As a baseline, the operator should track the number of incidents and
consequences caused by third-party excavators. This should include
reported near misses; reported pipeline damage occurrences that did not
result in a release; and third-party excavation damage events that resulted
in pipeline failures
Centurion’s public awareness program includes a process for evaluating the effectiveness of its
program, including a four-year review. The process requires that the four-year review include an
analysis of whether the program provides bottom-line results. The process, however, states that
to evaluate bottom-line results, Centurion will conduct a survey consisting of questions related to
stakeholder perception of the company’s public awareness program. A survey of stakeholders’
perceptions of the company does not inform Centurion regarding the change in the number or the
consequences of third-party incidents. While the process also states that the four-year review
may also include “damage to ticket ratio,” it does not require Centurion to track the number of
incidents and consequences caused by third-party excavators, including reported near misses;
reported pipeline damage occurrences that did not result in a release; and third-party excavation
damage events that resulted in pipeline failures. Further, while Centurion hired a contractor to
conduct a four-year effectiveness review, the resulting report does not include any analysis of
data related to incidents and consequences caused by third-party excavators or provide any
evidence that the contractor considered the “bottom-line results,” as defined in API RP 1162, in
evaluating the effectiveness of Centurion’s public awareness program.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.440(c) by failing to follow the general program recommendations, including the baseline
and supplemental requirements, of API RP 1162 in measuring the effectiveness of Centurion’s
Public Awareness Program.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.



CPF No. 4-2021-005-NOPV
Page 7
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.6
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require. The Notice
proposed a total civil penalty of $96,200 for the violations cited above.
Item 3: The Notice proposed a civil penalty of $96,200 for Respondent’s violation of 49 C.F.R.
§ 195.573(e), for failing to correct any identified deficiency in corrosion control as required by
§ 195.401(b). Centurion argues the gravity criterion should consider that pipeline safety was
minimally affected and the culpability criterion should recognize the additional actions
Centurion took, such as conducting a CIS and an ILI, to monitor for corrosion. Centurion also
argues the overall penalty should consider the difficulty that Centurion’s electric contractor had
in receiving the state permits necessary to complete Centurion’s plan for rectifying the CP
deficiencies.
Inadequate cathodic protection may lead to external corrosion, which can result in pipeline leaks
or failures. The proposed penalty took this risk into account, as well as the fact that no pipeline
failures or spills were associated with the violation. Accordingly, no adjustment in the gravity
criterion is appropriate.
Centurion’s Response shows the company took action to address the cause of non-compliance
with § 195.573(e) and was in the process of correcting the non-compliance before PHMSA
learned of the violation, including conducting a CIS and planning for the installation of
additional ground beds and rectifiers to correct the corrosion control deficiencies. Such actions
were not taken into account in the proposed civil penalty and therefore warrant assessing a credit
under the culpability penalty assessment criterion.
Finally, as discussed in detail above, the permitting issues Centurion may have experienced has
been considered in the determination regarding whether there was a violation of the regulations.
Those permitting issues occurred after Centurion had already failed to act in a reasonable amount
of time and committed the violation. The permitting issues, therefore, do not justify the
company’s non-compliance. Accordingly, no good faith credit is warranted.
In summary, having reviewed the record and considered the assessment criteria for each of the
6 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223.



CPF No. 4-2021-005-NOPV
Page 8
Items cited above, I assess Respondent a reduced total civil penalty of $72,000 for violation of
49 C.F.R. § 195.573(e).
Payment of the civil penalty must be made within 20 days of service. Federal regulations (49
C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMK-325), Federal Aviation Administration, Mike
Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City, Oklahoma 79169.
The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the $72,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1, 3, and 4 in the Notice for
violations of 49 C.F.R. §§ 195.452(f)(3), 195.573(e), and 195.440(c), respectively. Under 49
U.S.C. § 60118(a), each person who engages in the transportation of hazardous liquids or who
owns or operates a pipeline facility is required to comply with the applicable safety standards
established under chapter 601.
Respondent argues the proposed violations in Items 1, 3, and 4 should be withdrawn because
they were not violations, but did not present other arguments supporting modification or
withdrawal of any of the proposed compliance actions. For the reasons described above, these
Items are issued as findings of violation, and therefore, the corresponding Compliance Order
actions are not withdrawn.
Pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is
ordered to take the following actions to ensure compliance with the pipeline safety regulations
applicable to its operations:
1. With respect to the violation of § 195.452(f)(3) (Item 1), Respondent must
develop and perform a risk analysis to identify and evaluate the risks of facilities that
could affect HCAs and submit documentation to the Director within 30 days of
receipt of the Final Order.
2. With respect to the violation of § 195.573(e) (Item 3), Respondent must take
corrective action to address identified deficiencies in corrosion control and submit
documentation to the Director within 90 days of receipt of the Final Order.



CPF No. 4-2021-005-NOPV
Page 9
3. With respect to the violation of § 195.440(c) (Item 4), Respondent must conduct
an effectiveness review of its Public Awareness Plan program and follow the general
recommendations, including baseline and supplemental requirements, of API RP
1162 and submit documentation to the Director within 30 days of receipt of the Final
Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
PHMSA requests that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (see 49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
WARNING ITEM
With respect to Item 2, the Notice alleged a probable violation of Part 195, but identified it as a
warning item pursuant to § 190.205. The warning was for:
49 C.F.R. § 195.64(c)(1)(ii) (Item 2) ─ Respondent’s alleged failure to notify
PHMSA electronically through the National Registry of Operators of construction
of 10 or more miles of a new or replacement hazardous liquid or carbon dioxide
pipeline, not later than 60 days before the event occurs.
Centurion requested withdrawal of Item 2 because the pipeline project referenced in the Notice
actually consisted of a 9.8-mile pipeline and the addition of piping, pumps, and meters at three
existing facilities and, therefore, did not require notice in accordance with § 195.64(c). Under
§ 190.205, PHMSA does not adjudicate warning items to determine whether a probable violation
occurred. If OPS finds a violation of this provision in a subsequent inspection, Respondent may
be subject to future enforcement action.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The filing of a petition automatically stays
the payment of any civil penalty assessed. The other terms of the order, including corrective



CPF No. 4-2021-005-NOPV
Page 10
action, remain in effect unless the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
November 19, 2021
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

42021005NOPV_Closure Letter_07292022_(20-171911)_text.pdf

VIA ELECTRONIC MAIL
July 29, 2022
Michael Prince
President and Chief Executive Officer
Lotus Midstream, LLC
2150 Town Square Place, Suite 395
Sugar Land, Texas 77479
CPF 4-2021-005-NOPV
Dear Mr. Prince:
On November 19, 2021, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued a Final Order to Centurion Pipeline Company, LLC (Centurion) in the above-referenced
case. This Final Order included a Compliance Order and a Civil Penalty assessment. Based on
our review of the documentation provided by Centurion and confirmation of its payment of
assessed Civil Penalty, it has been determined that Centurion has complied with the terms of this
Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
CC: Michael Morgan, Executive VP Operations & Engineering -
Michael_morgan@centurionpl.com
- **truncated:** false