# SOUTHERN GULF LNG COMPANY LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 42022003NOA
- **title:** SOUTHERN GULF LNG COMPANY LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-03-07
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 193.2509(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022003noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022003noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022003noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42022003NOA
**body:**

Notice of Amendment involving SOUTHERN GULF LNG COMPANY LLC. PHMSA's enforcement data identifies the cited regulation as 193.2509(b). The case was opened on 2022-03-07 and is reported as closed as of 2022-04-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42022003NOA_Notice of Amendment_03072022_(21-209145).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022003NOA/42022003NOA_Notice%20of%20Amendment_03072022_(21-209145).pdf

42022003NOA_Notice of Amendment_03072022_(21-209145)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022003NOA/42022003NOA_Notice%20of%20Amendment_03072022_(21-209145)_text.pdf

42022003NOA_Operator Response to Notice_04052022_(21-209145).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022003NOA/42022003NOA_Operator%20Response%20to%20Notice_04052022_(21-209145).pdf

42022003NOA_Notice of Amendment_03072022_(21-209145)_text.pdf

NOTICE OF AMENDMENT
ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
March 7, 2022
Kenneth Grubb
Chief Operating Officer
Southern Gulf LNG Company, LLC
1001 Louisiana Street, Suite 1000
Houston, Texas 77002
CPF 4-2022-003-NOA
Dear Mr. Grubb:
From June 21, 2021 through August 25, 2021, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.), inspected Southern Gulf LNG Company, LLC’s (SGLNG) plans and procedures for its
facility located in Jackson County, Mississippi.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
SGLNG’s plans or procedures, as described below:
1. § 193.2509 Emergency procedures.
(a) …
(b) To adequately handle each type of emergency identified under
paragraph (a) of this section and each fire emergency, each operator
must follow one or more manuals of written procedures. The
procedures must provide for the following:
(1) Responding to controllable emergencies, including notifying
personnel and using equipment appropriate for handling the
emergency.
(2) Recognizing an uncontrollable emergency and taking action to
minimize harm to the public and personnel, including prompt
notification of appropriate local officials of the emergency and possible
need for evacuation of the public in the vicinity of the LNG plant.
SGLNG’s written emergency procedures were inadequate to ensure safe operation of a pipeline
facility. Specifically, SGLNG’s written EHS-PLA-001 Emergency Response Plan (Revision 12,
11/24/2020) failed to include the definition of a controllable emergency in accordance with §
193.2509(b)(1).



On January 26, 2022, SGLNG submitted revised procedures, Emergency Response, LNG-O&M
1900 (Revised: 12/01/2021). The revised procedures added the definition of controllable
emergency. PHMSA reviewed the revised procedures and found them adequate to satisfy §
193.2509(b)(1).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. § 552(b), along with the complete original document, you must provide
a second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. As mentioned above, Southern Gulf LNG
Company, LLC previously submitted revised procedures to PHMSA that reflect the amendments
required by this Notice. These submitted procedures were reviewed and found to be adequate by
PHMSA, therefore, no further action or response is required. If no additional response is received
within 30 days of receipt of this Notice, this enforcement will be automatically closed.
It is requested (not mandated) that Southern Gulf LNG Company, LLC maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Mary L. McDaniel, P.E.,
Director, Southwest Region, Pipeline and Hazardous Materials Safety Administration. In
correspondence concerning this matter, please refer to CPF 4-2022-003-NOA and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: Carla Roark, Compliance Manager, Southern LNG, Carla_Roark@kindermorgan.com
Andrew Kohout, P.E., Director, Division of LNG Facility Reviews and Inspections,
Office of Energy Projects, Federal Energy Regulatory Commission,
andrew.kohout@ferc.gov
2
- **truncated:** false
- **body characters:** 5256