# KINETICA DEEPWATER EXPRESS LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42022007NOPV
- **title:** KINETICA DEEPWATER EXPRESS LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-02-11
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 191.15(a), 191.17(a), 191.22(c)(2)(iv), 191.29(a)(1), 191.29(b), 192.717(a), 192.717(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022007nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022007nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022007nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42022007NOPV
**body:**

Notice of Probable Violation involving KINETICA DEEPWATER EXPRESS LLC. PHMSA's enforcement data identifies the cited regulations as 191.15(a),  191.17(a),  191.22(c)(2)(iv),  191.29(a)(1),  191.29(b),  192.717(a),  192.717(b). The case was opened on 2022-02-11 and is reported as closed as of 2023-06-02. Proposed civil penalty: $46,600. Assessed civil penalty: $46,600. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42022007NOPV_Closure Letter_06022023_(21-230161).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Closure%20Letter_06022023_(21-230161).pdf

42022007NOPV_Closure Letter_06022023_(21-230161)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Closure%20Letter_06022023_(21-230161)_text.pdf

42022007NOPV_Decision on Petition for Reconsideration_03222023_(21-230161).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Decision%20on%20Petition%20for%20Reconsideration_03222023_(21-230161).pdf

42022007NOPV_Decision on Petition for Reconsideration_03222023_(21-230161)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Decision%20on%20Petition%20for%20Reconsideration_03222023_(21-230161)_text.pdf

42022007NOPV_Final Order_10192022_(21-230161).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Final%20Order_10192022_(21-230161).pdf

42022007NOPV_Final Order_10192022_(21-230161)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Final%20Order_10192022_(21-230161)_text.pdf

42022007NOPV_Operator Petition for Reconsideration_11042022_(21-230161).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Operator%20Petition%20for%20Reconsideration_11042022_(21-230161).pdf

42022007NOPV_Operator Response to Notice_03252022_(21-230161).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_Operator%20Response%20to%20Notice_03252022_(21-230161).pdf

42022007NOPV_PCP PCO_02112022_(21-230161).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_PCP%20PCO_02112022_(21-230161).pdf

42022007NOPV_PCP PCO_02112022_(21-230161)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022007NOPV/42022007NOPV_PCP%20PCO_02112022_(21-230161)_text.pdf

42022007NOPV_Final Order_10192022_(21-230161)_text.pdf

October 19, 2022
VIA ELECTRONIC MAIL: kurt.cheramie@kineticallc.com
Mr. Kurt Cheramie
Senior Vice President
Kinetica Partners, LLC
1001 McKinney Street, Suite 900
Houston, Texas 77002
Re: CPF No. 4-2022-007-NOPV
Dear Mr. Cheramie:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws two of
the allegations of violation, makes other findings of violation, assesses a civil penalty of $46,600,
and specifies actions that need to be taken by Kinetica Deepwater Express, LLC, to comply with
the pipeline safety regulations. The penalty payment terms are set forth in the Final Order.
When the civil penalty has been paid and the terms of the compliance order completed, as
determined by the Director, Southwest Region, this enforcement action will be closed. Service
of the Final Order by e-mail is effective upon the date of transmission and acknowledgement of
receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc:
Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_____________________________________
In the Matter of )
Kinetica Deepwater Express, LLC, ) CPF No. 4-2022-007-NOPV
a subsidiary of Kinetica Partners, LLC, )
)
)
)
Respondent. )
_____________________________________)
FINAL ORDER
From June 21, 2021, through October 18, 2021, pursuant to 49 U.S.C. § 60117, a representative
of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety (OPS), inspected Kinetica Deepwater Express, LLC’s (KDE or Respondent) repair
records following an incident that occurred on July 13, 2021, on its pipeline ID 341, El Paso
Platform 327-A, in Eugene Island, Louisiana. Kinetica Parnters, LLC, the parent company of
KDE, owns and operates over 1,800 miles of natural gas transmission and gathering pipelines.1
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated February 11, 2022, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that KDE had violated 49 C.F.R. parts 191 and 192, proposed assessing
a civil penalty of $46,600 for the alleged violations, and proposed ordering Respondent to take
certain measures to correct the alleged violations. The Notice also included an additional
warning item pursuant to 49 C.F.R. § 190.205, which warned the operator to correct the probable
violation or face possible future enforcement action.
KDE responded to the Notice by letter dated March 25, 2022 (Response). Respondent contested
all the allegations and offered additional information in response to the Notice. Respondent did
not request a hearing and therefore has waived its right to one.
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. parts 191 and 192, as follows:
1 Kinetica Partners, LLC website, Pipeline Safety Portal, available at
https://app.smartsheet.com/b/publish?EQBCT=225f8d51ee3041a3827b5f1dfcd39b20 (last accessed Oct. 13, 2022).



Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 191.15(a),
2 which states:
§ 191.15 Transmission systems; gathering systems; liquefied natural
gas facilities; and underground natural gas storage facilities: Incident
report.
(a) Transmission or Gathering. Each operator of a transmission or a
gathering pipeline system must submit DOT Form PHMSA F 7100.2 as
soon as practicable but not more than 30 days after detection of an incident
required to be reported under § 191.5 of this part.
The Notice alleged that Respondent violated 49 C.F.R. § 191.15(a) by failing to submit DOT
Form PHMSA F 7100.2 (incident report) as soon as practicable, but not more than 30 days after
detection, of a reportable incident involving its 6-inch, 341 pipeline on the Eugene Island – 327
A platform. Specifically, the Notice alleged that KDE did not timely file the incident report
following the July 13, 2021 release of natural gas.
In its Response, KDE argued that the July 13, 2021 release of natural gas did not constitute an
“incident” as that term is defined by 49 C.F.R. § 191.3, because no injuries occurred, the total
property damage was estimated to be less than $122,000, the unintentional estimated gas loss
was less than three million cubic feet, and the leak was not deemed significant in the judgment of
the operator. Therefore, respondent argued, submission of an incident report was not required.
In a recommendation for final action submitted pursuant to § 190.209(b)(7), the Director
recommended withdrawing the alleged violation of § 191.15(a). I agree with this
recommendation.
Accordingly, after considering all of the evidence and the legal issues presented, I hereby order
that Notice Item 1 be withdrawn.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 191.17(a),
3 which states:
§ 191.17 Transmission systems; gathering systems; liquefied natural
gas facilities; and underground natural gas storage facilities: Annual
report.
(a) Transmission or Gathering. Each operator of a transmission or a
gathering pipeline system must submit an annual report for that system on
DOT Form PHMSA 7100.2.1. This report must be submitted each year, not
later than March 15, for the preceding calendar year, except that for the
2010 reporting year the report must be submitted on June 15, 2011.
The Notice alleged that Respondent violated 49 C.F.R. § 191.17(a) by failing to submit complete
and accurate annual reports using DOT Form PHMSA 7100.2.1 (annual report). Specifically,
2 The NOPV and this Final Order quotes 49 C.F.R.§ 191.15(a) as published on November 26, 2010, which was in
effect at the time of the violation. The regulation was most recently amended on June 13, 2022.
3 The NOPV and this Final Order quotes 49 C.F.R.§ 191.17(a) as published on November 26, 2010, which was in
effect at the time of the violation. The regulation was most recently amended on June 13, 2022.



the Notice alleged that KDE’s annual reports for calendar years 2016, 2017, 2018, 2019, and
2020 did not include mileage for pipelines acquired from ANR Pipeline Company on April 1,
2016.
In its Response, Respondent argued that it submitted annual reports for the pipeline mileage in
question using DOT Form PHMSA 7100.2.1 under OPID 39519 for calendar years 2016, 2017,
2018, 2019, 2020, and 2021. Respondent provided copies of the reports with its Response.
In a recommendation for final action submitted pursuant to § 190.209(b)(7), the Director
recommended withdrawing the alleged violation of § 191.17(a). The Director noted that since
Respondent was created solely to operate the pipelines acquired from ANR Pipeline Company,
its annual reports are sufficient because they reflect the mileage for the acquired pipelines. I
agree with this recommendation.
Accordingly, after considering all of the evidence, I hereby order that Notice Item 2 be
withdrawn.
Item 4: The Notice alleged that Respondent violated 49 C.F.R. §§ 191.29(a)(1) and (b), which
states:
§ 191.29 National Pipeline Mapping System.
(a) Each operator of a gas transmission pipeline or liquefied natural gas
facility must provide the following geospatial data to PHMSA for that
pipeline or facility:
(1) Geospatial data, attributes, metadata and transmittal letter
appropriate for use in the National Pipeline Mapping System. Acceptable
formats and additional information are specified in the NPMS Operator
Standards Manual available at www.npms.phmsa.dot.gov or by contracting
the PHMSA Geographic Information Systems Manager at (202) 366-4595.
(2) ….
(b) The information required in paragraph (a) of this section must be
submitted each year, on or before March 15, representing assets as of
December 31 of the previous year. If no changes have occurred since the
previous year’s submission, the operator must comply with the guidance
provided in the NPMS Operator Standards manual available at
www.npms.phmsa.dot.gov or contact the PHMSA Geographic Information
Systems Manager at (202) 366-4595.
The Notice alleged that Respondent violated 49 C.F.R. §§ 191.29(a)(1) and 191.29(b) by failing
to submit complete and accurate National Pipeline Mapping System (NPMS) information
required by § 191.29(a) on or before March 15 representing its assets as of December 31 of the
previous year. Specifically, on April 1, 2016, KDE acquired from ANR Pipeline Company
approximately 470.7 miles of offshore pipeline assets located in the Gulf of Mexico and
approximately 44.52 miles of onshore pipeline assets. The Notice alleged that since the 2016
acquisition, Respondent has not submitted updates to NPMS to account for these assets.
In its Response, KDE argued that it submitted the required NPMS information for the pipeline



mileage in question under OPID 39519 for calendar years 2016, 2017, 2018, 2019, 2020, and
2021. Respondent provided screenshots from NPMS with its Response.
After reviewing the additional documentation submitted by Respondent, I find Respondent did
not satisfy the requirements of §§ 191.29(a)(1) and 191.29(b). While Respondent filed NPMS
information for each calendar year since 2016, these filings were incomplete. Exhibit D in the
case file shows the total mileage that KDE submitted to NPMS each year was 261 miles in 2016,
219 miles in 2017, 219 miles in 2018, and 202 miles in 2019, 2020, and 2021. However, these
NPMS submissions conflict with KDE’s annual reports submissions for those years, wherein
Respondent indicated it operated over 400 miles of pipeline each year. Respondent did not
provide documentation to support its assertion that it accurately reported its total mileage to
NPMS.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§§ 191.29(a)(1) and 191.29(b) by failing to submit complete and accurate NPMS information
required by § 191.29(a) on or before March 15 representing its assets as of December 31 of the
previous year.4
Item 5: The Notice alleged that Respondent violated 49 C.F.R. § 192.717, which states:
§ 192.717 Transmission lines: Permanent field repair of leaks.
Each permanent field repair of a leak on a transmission line must be
made by –
(a) Removing the leak by cutting out and replacing a cylindrical piece
of pipe; or
(b) Repairing the leak by one of the following methods:
(1) Install a full encirclement welded split sleeve or appropriate design,
unless the transmission line is joined by mechanical couplings and operates
at less than 40 percent of SMYS.
(2) If the leak is due to a corrosion pit, install a properly designed bolt-
on-leak clamp.
(3) If the leak is due to a corrosion pit and on pipe of not more than
40,000 psi (267 Mpa) SMYS, fillet weld over the pitted area a steel plate
patch with rounded corners, of the same or greater thickness than the pipe,
and not more than one-half of the diameter of the pipe in size.
(4) If the leak is on a submerged offshore pipeline or submerged pipeline
in inland navigable waters, mechanically apply a full encirclement split
sleeve of appropriate design.
(5) Apply a method that reliable engineering tests and analyses show
can permanently restore the serviceability of the pipe.
4 In the “Recommendation” section of the August 9, 2022 Region Recommendation, the Southwest Region wrote
that it recommended withdrawing Item 4 and the associated compliance order requirements. However, it appears
from the “Discussion” section that the Southwest Region did not actually recommend withdrawing this Item
(“Therefore, Southwest Region recommends that the Final Order be issued finding KDE in violation of § 191.29(a)
and (b) for Item 4. The Southwest Region recommends issuing the Proposed Compliance Order for Item 4 as
drafted in the Notice.”).



The Notice alleged that Respondent violated 49 C.F.R. §§ 192.717 by failing to complete a
permanent field repair of a leak. Specifically, the Notice alleged that on July 16, 2021, KDE
repaired a through-wall pinhole leak with a Belzona Superwrap II composite wrap, and
documented it as a “permanent” repair on its Pipeline Repair & Replacement Field Worksheet
(Maximo Ticket Number 21-91661) and in its Pipeline Inspection Report (Repair Number BBH-
4482). The Notice alleged neither § 192.717 nor KDE’s written procedure (in place since July
2020) allows for through-wall leaks to be permanently repaired using composite wraps.
In its Response, Respondent contested the violation and stated that it had not updated its written
procedures to account for through-wall defects. Respondent argued that pursuant to 49 C.F.R.
§ 192.717(b)(5), permanent field repairs of leaks may be made using a method that reliable
engineering tests and analyses show can permanently restore the serviceability of the pipe. KDE
cited several documents5 to support its assertion that the regulations allow operators to choose
other methods to repair leaks, and it asserted that composite wraps are one such method.
While I agree that Respondent’s procedures and 49 C.F.R. § 192.717(b)(5) permit operators to
use repair methods not specifically listed in the regulation, the procedures and regulation require
that those repair methods must permanently restore the serviceability of the pipe, as shown by
reliable engineering tests and analyses. The PHMSA documents Respondent cited in its
Response reiterate that an operator’s repair method is permitted only when reliable engineering
tests and analyses show that it permanently restores serviceability of the pipe. Respondent did
not provide or cite to any reliable engineering tests or analyses that show that Belzona wrap
permanently restores the serviceability of pipe that has a leak.
Further, in email correspondence, the Southwest Region identified two industry standards which
explicitly prohibit the use of composite wraps to permanently repair leaks, including ASME
B21-4 (2019) which prohibits the use of composites for repairing leaks for a permanent repair
and ASME B31-8 (2018) which prohibits the use of composites for repairing leaks on a line
operating over 100 psig. While Respondent is correct that these standards have not been
incorporated by reference into part 192, the prohibition on the use of composite wraps to
permanently repair leaks in these industry standards is evidence that using such composite wraps
does not constitute a method that reliable engineering tests and analyses show can permanently
restore the serviceability of the pipe. Further, as mentioned above, Respondent failed to provide
any other tests or analyses that show the Belzona Superwrap II composite wrap can permanently
restore the serviceability of pipe with a through-wall leak.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 192.717 by failing to complete a permanent field repair of a leak.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
5 64 Fed. Reg. 69660 (Dec. 14, 1999); PHMSA Letter of Interpretation (Nov. 18, 2010); Email from PHMSA
Southwest Region.



$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.6
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require. The Notice
proposed a total civil penalty of $46,600 for the violations cited above.
Item 5: The Notice proposed a civil penalty of $46,600 for Respondent’s violation of 49 C.F.R.
§ 192.717, for failing to complete a permanent field repair of a leak. Respondent did not argue
for reduction or mitigation of the proposed civil penalty, rather argued that it did not violate
§ 192.717. For the reasons given above, I found Respondent in violation of § 192.717.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $46,600 for violation of 49 C.F.R. § 192.717.
Payment of the civil penalty must be made within 20 days after receipt of this Final Order.
Federal regulations (49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer
through the Federal Reserve Communications System (Fedwire), to the account of the U.S.
Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
transfers should be directed to: Financial Operations Division (AMK-325), Federal Aviation
Administration, Mike Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City,
Oklahoma 79169. The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the $46,600 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1, 2, 4, and 5 for violations of 49
C.F.R. §§ 191.15(a), 191.17(a), 191.29(a)(1) and 191.29(b), and 192.717, respectively. Under
49 U.S.C. § 60118(a), each person who engages in the transportation of gas or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601.
With regard to the violations of §§ 191.15(a) and 191.17(a) (Items 1 and 2, respectively),
6 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223 for adjusted amounts.



Respondent argued that the underlying allegations of violation should be withdrawn. For the
reasons stated above, Items 1 and 2 of the Notice have been withdrawn. Consequently, the
Compliance Order for these Items is hereby withdrawn.
With regard to the violation of §§ 191.29(a)(1) and 191.29(b), and 192.717 (Items 4 and 5,
respectively), Respondent argued that the underlying allegations of violation should be
withdrawn. KDE did not provide separate argument for withdrawal or modification of the
Compliance Order for these Items absent withdrawal of the underlying allegations. For the
reasons stated above, the underlying allegations of violation have not been withdrawn.
Consequently, the Compliance Order for these Items is not withdrawn or modified for these
Items.
Pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is
ordered to take the following actions to ensure compliance with the pipeline safety regulations
applicable to its operations:
1. With respect to the violation of § 191.29 (a)(1) and 191.29(b) (Item 4),
Respondent must resubmit its calendar year (CY) 2020 NPMS submission to include
assets acquired on April 1, 2016, from ANR, and provide PHMSA Southwest Region
a complete and accurate record of the CY 2020 NPMS submission, within 30 days
following receipt of the Final Order.
2. With respect to the violation of § 192.717 (Item 5), Respondent must permanently
repair the leak on its Pipeline ID 341, El Paso Platform 327-A in Eugene Island,
Louisiana, in compliance with its own procedures and § 192.717. Additionally,
Respondent must review previous repairs made to its pipeline systems jurisdictional
to 49 C.F.R. part 192, determine if any permanent repairs completed using the
Belzona composite wraps remain, and provide a list of those repairs identified along
with its plans for remedial action to PHMSA Southwest Region. These actions must
be completed and Respondent must provide PHMSA Southwest Region with
documentation verifying completion within 30 days following receipt of the Final
Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
PHMSA requests that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (see 49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.



WARNING ITEM
With respect to Item 3, the Notice alleged probable violation of Part 191, but identified it as a
warning item pursuant to § 190.205. The warning was for:
49 C.F.R. § 191.22(c)(2)(iv) (Item 3) ─ Respondent’s alleged failure to file a
Type D acquisition notification through the National Registry of Operators for the
acquisition of approximately 515 miles of gas transmission pipelines from ANR
Pipeline Company no later than 60 days following acquisition.
Respondent, in its Response, provided additional information regarding this Item, and argued
that it had not violated § 191.22(c)(2)(iv). Under § 190.205, PHMSA does not adjudicate
warning items to determine whether a probable violation occurred. If OPS finds a violation of
this provision in a subsequent inspection, Respondent may be subject to future
enforcement action.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The filing of a
petition automatically stays the payment of any civil penalty assessed. The other terms of the
order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
October 19, 2022
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

42022007NOPV_Decision on Petition for Reconsideration_03222023_(21-230161)_text.pdf

March 22, 2023
VIA ELECTRONIC MAIL TO: kurt.cheramie@kineticallc.com
Mr. Kurt Cheramie
Senior Vice President
Kinetica Partners, LLC
1001 McKinney Street, Suite 900
Houston, Texas 77002
Re: CPF No. 4-2022-007-NOPV
Dear Mr. Cheramie:
Enclosed is the Decision on the Petition for Reconsideration (Decision) issued in the above-
referenced case. For the reasons explained therein, the Decision denies your petition. The
penalty payment and compliance order terms remain unchanged from those set forth in the Final
Order issued October 19, 2022. This Decision constitutes the final administrative action in this
proceeding. Service of this decision by electronic mail is effective upon the date of transmission
as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Bill Prentice, General Counsel, Kinetica Partners, LLC,
bill.prentice@kineticallc.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Kinetica Deepwater Express, LLC, ) CPF No. 4-2022-007-NOPV
a subsidy of Kinetica Partners, LLC, )
)
Petitioner. )
____________________________________)
DECISION ON PETITION FOR RECONSIDERATION
From June 21, 2021, through October 18, 2021, pursuant to 49 U.S.C. § 60117, a representative
of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline
Safety (OPS), inspected Kinetica Deepwater Express, LLC’s (KDE) records following an
incident that occurred on July 13, 2021, on its pipeline ID 341, El Paso Platform 327-A, in
Eugene Island, Louisiana. Kinetica Partners, LLC (Kinetica or Petitioner), the parent company
of KDE, owns and operates over 1,800 miles of natural gas transmission and gathering
pipelines.1
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to KDE, by
letter dated February 11, 2022, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that KDE had violated 49 C.F.R. parts 191 and 192, proposed assessing a civil
penalty of $46,600 for the alleged violations, and proposed ordering KDE to take certain
measures to correct the alleged violations. The Notice also included an additional warning item
pursuant to 49 C.F.R. § 190.205, which warned the operator to correct the probable violation or
face possible future enforcement action.
Kinetica, on behalf of KDE, responded to the Notice by letter dated March 25, 2022 (Response).2
Petitioner contested all of the allegations of violation and offered additional information in
response to the Notice. Kinetica did not request a hearing and therefore waived its right to one.
On October 19, 2022, pursuant to 49 U.S.C. §§ 60117 and 60122, and 49 C.F.R. § 190.213, the
1 Kinetica Partners, LLC website, Pipeline Safety Portal, available at
https://app.smartsheet.com/b/publish?EQBCT=225f8d51ee3041a3827b5f1dfcd39b20 (last accessed February. 22,
2023).
2 Kinetica Deepwater Express, LLC, Written Response CPF No. 4-2022-007-NOPV, dated March 25, 2022
(Response) (on file with PHMSA).



Associate Administrator for Pipeline Safety issued a Final Order finding that KDE committed
the violations as alleged in the Notice (Final Order).3 The Final Order assessed a civil penalty of
$46,600, pursuant to the authority of 49 U.S.C. § 60122 and 49 C.F.R. § 190.221, and ordered
Petitioner to take certain measures to correct certain violations, pursuant to the authority of
49 U.S.C. § 60118 and 49 C.F.R. § 190.217. The Final Order also included the additional
warning item pursuant to 49 C.F.R. § 190.205, warning KDE to correct the probable violation or
face possible future enforcement action.
On November 4, 2022, Kinetica, on behalf of KDE, filed a Petition for Reconsideration pursuant
to 49 C.F.R. § 190.243 (Petition).4 In its Petition, Kinetica requested reconsideration of Items 3,
4, and 5 of the Final Order, which found violations of 49 C.F.R §§ 191.17(a), 191.29(a)(1) and
(b), and 192.717(b)(5), respectively. It did not request reconsideration of the other Items within
the Final Order.
I. Standard of Review
Under 49 C.F.R. § 190.243, a respondent may petition the Associate Administrator for
reconsideration of a Final Order that has been issued pursuant to § 190.213. Reconsideration is
not an appeal or a completely new review of the record.5 A respondent may ask for correction of
an error or, in limited circumstances, may present previously unavailable information. If a
respondent requests consideration of additional facts or arguments, the respondent must submit
the reasons they were not presented prior to the issuance of the Final Order. The Associate
Administrator may grant or deny, in whole or in part, a petition for reconsideration without
further proceedings.
II. Analysis
a. Item 3
The Final Order issued a warning to KDE regarding compliance with 49 C.F.R.
§ 191.22(c)(2)(iv), which requires each operator of a gas pipeline facility to notify PHMSA of
any of the acquisition or divestiture of 50 or more miles of a pipeline or pipeline system subject
to Part 192. Specifically, the Notice alleged that KDE failed to file a Type D acquisition
notification through the National Registry of Operators for the acquisition of approximately 515
miles of gas transmission pipelines from ANR Pipeline Company no later than 60 days after
acquisition. Petitioner argued in its Response that KDE was not at fault for the errors and
discrepancies that were made in reporting the divestiture of assets from ANR Pipeline Company
to KDE.
3 Kinetica Deepwater Express, LLC, Final Order, CPF No. 4-2022-007-NOPV (Final Order) (October 19, 2022) (on
file with PHMSA).
4 Petition for Reconsideration of CPF No. 4-2022-007-NOPV, dated November 4, 2022 (Petition) (on file with
PHMSA).
5 49 C.F.R. § 190.243(a)-(d).



The Final Order noted that, pursuant to § 190.205, PHMSA does not adjudicate warning items to
determine whether a probable violation occurred. In its Petition, Kinetica again argued that it did
not violate § 191.22(c)(2)(iv) and requested that PHMSA withdraw the warning. However, as
explicitly set forth in its regulations, “[a]n adjudication under [§ 190.205] to determine whether a
violation occurred is not conducted for warnings.” Accordingly, there is no basis for
reconsidering or withdrawing the warning item as alleged in the Notice.
b. Item 4
The Final Order found that KDE violated 49 C.F.R. §§ 191.29(a)(1) and 192.29(b), which
require each operator of a gas transmission pipeline to provide certain geospatial data to
PHMSA. Specifically, the Notice alleged that KDE violated §§ 191.29(a)(1) and 129.29(b) by
failing to submit complete and accurate National Pipeline Mapping System (NPMS) information
required by § 191.29(a) on or before March 15 representing its assets as of December 31 of the
previous year. On April 1, 2016, KDE acquired from ANR Pipeline Company approximately
470.7 miles of offshore pipeline assets located in the Gulf of Mexico and approximately 44.52
miles of onshore pipeline assets. The Notice alleged that since the 2016 acquisition, KDE did
not submit updates to NPMS to account for these assets.
In its Response, Petitioner argued that it submitted the required NPMS information for the
pipeline mileage in question under OPID 39519 for calendar years 2016, 2017, 2018, 2019,
2020, and 2021. Kinetica provided screenshots from the NPMS website with its Response.
The Final Order determined that KDE did not satisfy the requirements of §§ 191.29(a)(1) and
192.29(b). Exhibit D in the case file showed the total mileage that KDE submitted to NPMS
each year was 261 miles in 2016, 219 miles in 2017 and 2018, and 202 miles in 2019 and 2020.
However, the Final Order found the reported mileage conflicted with KDE’s annual reports for
those years, wherein the company indicated it operated over 400 miles of pipelines in each of the
pertinent years.
In its Petition, Kinetica asserted that the lines not reported pursuant to § 192.29 were gathering
lines, and thus not subject to the reporting requirements of that section. In support of its
assertion, Petitioner submitted copies of its annual reports for calendar years 2016 through 2021.
These annual reports show that KDE reported the following pipeline mileage:
Calendar Year Miles of Steel Transmission
Pipeline
Miles of Steel Gathering
Pipeline
2016 250.25 255.58
2017 207.63 223.3
2018 216.17 232.4
2019 197.41 212.31
2020 197.34 213.15
2021 197.34 211.83



Petitions for reconsideration provide a vehicle for respondents to submit evidence or arguments
not previously available during the proceeding. The Associate Administrator does not consider
repetitious information but may consider additional facts or arguments, provided that the
respondent submits a valid reason why such information was not presented prior to issuance of
the final order. Here, the annual report information, including gathering line mileage, was
previously available to the Petitioner and to PHMSA, and in fact was cited by the Associate
Administrator in the Final Order. Petitioner failed to present additional facts in this Petition that
were not presented prior to the issuance of the Final Order. Petitioner also failed to submit a
valid reason for failing to present its specific argument regarding gathering line mileage before
the Final Order was issued.
Even considering the evidence and arguments provided in the Petition, I find that the Final Order
correctly concluded Petitioner did not comply with § 192.29. The evidence provided with the
Response and Petition shows the mileage KDE reported to PHMSA pursuant to §§ 191.29(a)(1)
and 129.29(b) conflicts with the mileage of steel transmission pipeline it reported to PHMSA in
its 2016 through 2020 annual reports even when the gathering line mileage is excluded.
Petitioner’s argument regarding the gathering line mileage does not negate the veracity of the
underlying finding of violation–that KDE did not accurately report its pipeline mileage in
accordance with § 192.29. Accordingly, I find no basis for withdrawing the finding of violation
of §§ 191.29(a)(1) and 192.29(b).
c. Item 5
The Final Order found that KDE violated 49 C.F.R. § 192.717(b)(5) by failing to complete a
permanent field repair of a leak. Specifically, the Notice alleged that on July 16, 2021, KDE
repaired a through-wall pinhole leak with a Belzona Superwrap II composite wrap, and
documented it as a “permanent” repair on its Pipeline Repair & Replacement Field Worksheet
(Maximo Ticket Number 21-91661) and in its Pipeline Inspection Report (Repair Number BBH-
4482). The Notice alleged neither § 192.717 nor KDE’s written procedures allow for through-
wall leaks to be permanently repaired using composite wraps.
In response to the Notice, Petitioner argued that pursuant to § 192.717(b)(5), permanent field
repairs of leaks may be made using a method that reliable engineering tests and analyses show
can permanently restore serviceability of the pipe. It also stated that it had not updated its written
procedures to account for through-wall defects. Kinetica cited several documents6 in its
Response to support its assertion that the regulations allow operators to choose other methods to
repair leaks, and it asserted that composite wraps are one such method.
The Final Order determined that KDE violated § 191.717 by failing to perform the leak repair
with a method that is shown by reliable engineering tests and analyses to permanently restore
serviceability of the pipe. In reaching this determination, the Final Order stated that Petitioner
did not provide or cite to any reliable engineering tests or analyses that show Belzona Superwrap
II composite wrap permanently restores serviceability of a pipe that has a leak.
6 64 Fed. Reg. 69660 (Dec. 14, 1999); PHMSA Letter of Interpretation (November 18, 2010); Email from PHMSA
Southwest Region.



With its Petition, Kinetica attached three product specification sheets from 2015, 2016, and
2019, four design and repair procedure documents prepared in October 2017, July 2021, May
2022, and October 2022, and a prequalification testing document from 2018, all pertaining to
Belzona Superwrap II composite wrap.
7 All of these records pre-date PHMSA’s issuance of the
Final Order. Petitioner did not provide these documents with its Response, nor did it provide a
reason why it did not present such information prior to PHMSA’s issuance of the Final Order. In
its Petition, Kinetica noted that a professional engineer recently reviewed the design and repair
procedure document that was initially prepared in July 2021. Petitioner argued these documents
show “that composite wraps do provide a method to permanently restore serviceability of the
pipe.
”
After considering the evidence submitted with the Petition, I find the information therein actually
belies Petitioner’s argument that composite wraps permanently restore serviceability of pipe.
The design and repair procedure prepared in October 2017, titled “Belzona SuperWrap II,” states
through-wall defects can continue to grow after implementation of the repair. Further, the
ASME and ISO standards cited in this document state that the composite wrap repair has a
maximum service life of 20 years. The document submitted by the Petitioner that included an
engineer’s review of a procedure does not dispute these facts. The evidence included with the
Petition supports the finding in the Fin