# DENBURY GULF COAST PIPELINES, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42022017NOPV
- **title:** DENBURY GULF COAST PIPELINES, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-05-26
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.401(b)(1), 195.402(a), 195.402(c)(12), 195.402(e)(7), 195.408(a), 195.408(b), 195.412(a), 195.440(a), 195.440(b), 195.440(c), 195.440(d), 195.440(e), 195.440(f), 195.440(g), 195.440(h), 195.440(i), 195.452(a)(1), 195.452(a)(2), 195.452(a)(3), 195.452(d)(1), 195.452(f)(6), 195.452(i)(1), 195.452(i)(2), 195.52(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022017nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022017nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022017nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42022017NOPV
**body:**

Notice of Probable Violation involving DENBURY GULF COAST PIPELINES, LLC. PHMSA's enforcement data identifies the cited regulations as 195.401(b)(1),  195.402(a),  195.402(c)(12),  195.402(e)(7),  195.408(a),  195.408(b),  195.412(a),  195.440(a),  195.440(b),  195.440(c),  195.440(d),  195.440(e),  195.440(f),  195.440(g),  195.440(h),  195.440(i),  195.452(a)(1),  195.452(a)(2),  195.452(a)(3),  195.452(d)(1),  195.452(f)(6),  195.452(i)(1),  195.452(i)(2),  195.52(a). The case was opened on 2022-05-26 and is reported as closed as of 2024-01-29. Proposed civil penalty: $3,866,734. Assessed civil penalty: $2,868,100. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42022017NOPV_Closure Letter_01292024_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_Closure%20Letter_01292024_(20-176125).pdf

42022017NOPV_Closure Letter_01292024_(20-176125)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_Closure%20Letter_01292024_(20-176125)_text.pdf

42022017NOPV_Consent Agreement and Order_03242023_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_Consent%20Agreement%20and%20Order_03242023_(20-176125).pdf

42022017NOPV_Consent Agreement and Order_03242023_(20-176125)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_Consent%20Agreement%20and%20Order_03242023_(20-176125)_text.pdf

42022017NOPV_Operator Response to Notice and Request for Hearing and Statement of Issues_07252022_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing%20and%20Statement%20of%20Issues_07252022_(20-176125).pdf

42022017NOPV_Operator Withdrawal of Request for Hearing_03272023_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_Operator%20Withdrawal%20of%20Request%20for%20Hearing_03272023_(20-176125).pdf

42022017NOPV_PCO PCP_0526022_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_PCO%20PCP_0526022_(20-176125).pdf

42022017NOPV_PCO PCP_0526022_(20-176125)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_PCO%20PCP_0526022_(20-176125)_text.pdf

42022017NOPV_PHC Hearing Rescheduled_12222022_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_PHC%20Hearing%20Rescheduled_12222022_(20-176125).pdf

42022017NOPV_PHC Hearing Rescheduled_12222022_(20-176125)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_PHC%20Hearing%20Rescheduled_12222022_(20-176125)_text.pdf

42022017NOPV_PHC Hearing Scheduled_10122022_(20-176125).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_PHC%20Hearing%20Scheduled_10122022_(20-176125).pdf

42022017NOPV_PHC Hearing Scheduled_10122022_(20-176125)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022017NOPV/42022017NOPV_PHC%20Hearing%20Scheduled_10122022_(20-176125)_text.pdf

42022017NOPV_PHC Hearing Scheduled_10122022_(20-176125)_text.pdf

October 12, 2022
VIA ELECTRONIC MAIL TO: ghopkins@velaw.com and bryan.lethcoe@dot.gov
Mr. George C. Hopkins, Esq.
Counsel for Denbury Gulf Coast Pipeline, LLC
Vinson & Elkins LLP
2200 Pennsylvania Avenue, NW, Suite 500
Washington, DC 20037
Mr. Bryan Lethcoe
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
8701 South Gessner Road, Suite 630
Houston, Texas 77074
Re: Notice of Hearing, Denbury Gulf Coast Pipeline, LLC
CPF No. 4-2022-017-NOPV
Dear Mr. Hopkins and Mr. Lethcoe:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order issued by the Pipeline
and Hazardous Materials Safety Administration in the above-referenced case. The hearing will take
place on January 18, 2023, beginning at 8:30 a.m. Central Time.
The hearing will take place at the PHMSA Southwest Region office, 8701 South Gessner Road,
Suite 630, Houston, TX 77074. Upon arrival at the building, attendees will be required to present
photo identification to security personnel. A contact phone number for the day of the hearing is
(713) 272-2859.
At least 10 calendar days prior to the hearing (or by January 9, 2022), both parties must submit and
exchange any additional written materials they intend to present at the hearing and the name and
email address of each attendee. This information should be provided electronically. Materials not
submitted by this date may be excluded.



If you have any questions, please do not hesitate to contact me.
Sincerely,
Larry White
Presiding Official
cc: Mr. David Sheppard, Senior Vice President – Operations, Denbury Gulf Coast Pipeline,
LLC, david.sheppard@denbury.com
Mr. Ian Curry, Esq., Counsel, Southwest Region, Office of Pipeline Safety,
ian.curry@dot.gov

42022017NOPV_PHC Hearing Rescheduled_12222022_(20-176125)_text.pdf

Date: December 22, 2022
From: Larry White
To: File
Re: Continuance of Hearing, Denbury Gulf Coast Pipeline, LLC
CPF No. 4-2022-017-NOPV
By electronic mail dated December 22, 2022, Ian Curry, Counsel for OPS Southwest Region, and
George Hopkins, Counsel for Denbury Gulf Coast Pipeline, LLC submitted a joint request for a
continuance of the hearing previously scheduled for January 18, 2023. The request explained that
the parties were moving forward with negotiation of a consent agreement to resolve the case which
would make a hearing unnecessary and the additional time was needed to conclude the negotiations.
I granted the request for a continuance until March 29, 2023 which will be the new hearing date if
resolution by consent agreement is not completed by that time.

42022017NOPV_Closure Letter_01292024_(20-176125)_text.pdf

VIA ELECTRONIC MAIL TO: chris.kendall@denbury.com
January 29, 2024
Chris Kendall
Director, President, and Chief Executive Officer
Denbury Inc.
5851 Legacy Circle, Suite 1200
Plano, Texas 75024
CPF 4-2022-017-NOPV
Dear Mr. Kendall:
By letter dated May 26, 2022, the Pipeline and Hazardous Materials Safety Administration, Office
of Pipeline Safety, issued a Notice of Probable Violation, Proposed Civil Penalty, and Proposed
Compliance Order to Denbury Gulf Coast Pipelines, LLC. On March 24, 2023, the allegations
were resolved in a Consent Agreement and Order, which required payment of a civil penalty and
certain corrective measures.
Based on PHMSA’s review of the documentation Denbury provided, it has been determined that
Denbury has complied with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: David Sheppard, Executive Vice President – Chief Operating Officer,
david.sheppard@denbury.com
Mr. Randy Robichaux, Vice President, Health, Safety and Environmental,
randy.robichaux@denbury.com
Chad Docekal, Regulatory Manager - Pipelines, chad.docekal@denbury.com

42022017NOPV_Consent Agreement and Order_03242023_(20-176125)_text.pdf

VIA ELECTRONIC MAIL TO: david.sheppard@denbury.com
David E. Sheppard
Executive Vice President and Chief Operating Officer
Denbury Gulf Coast Pipelines, LLC
5851 Legacy Circle, Suite 1200
Plano, Texas 75024
Re: CPF No. 4-2022-017-NOPV
Dear Mr. Sheppard:
Enclosed please find the Consent Order incorporating the terms of the Consent Agreement between
the Pipeline and Hazardous Materials Safety Administration (PHMSA) and Denbury Gulf Coast
Pipelines, LLC, which was executed on March 24, 2023. Service of the Consent Order and
Consent Agreement by electronic mail is deemed effective upon the date of transmission and
acknowledgment of receipt, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. George C. Hopkins, Counsel for Denbury Gulf Coast Pipelines, LLC, Vinson & Elkins,
ghopkins@velaw.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
)
In the Matter of )
)
Denbury Gulf Coast Pipelines, LLC, ) CPF No. 4-2022-017-NOPV
)
Respondent. )
)
CONSENT ORDER
By letter dated May 26, 2022, the Pipeline and Hazardous Materials Safety Administration, Office
of Pipeline Safety, issued a Notice of Probable Violation, Proposed Civil Penalty, and Proposed
Compliance Order (“Notice”) to Denbury Gulf Coast Pipelines, LLC (“Denbury”).
On July 25, 2022, pursuant to 49 C.F.R. § 190.208, Denbury responded to the Notice by submitting
a Request for Settlement Conference and Hearing, after which the parties engaged in settlement
discussions that resulted in the Consent Agreement attached to this Consent Order (the “Order”)
that settles all of the allegations in the Notice.
Accordingly, the Consent Agreement is hereby approved and incorporated by reference into this
Order. Denbury is hereby ordered to comply with the terms of the Consent Agreement, effective
immediately.
Pursuant to 49 U.S.C. § 60101, et seq., failure to comply with this Order may result in the
assessment of civil penalties as set forth in 49 C.F.R. § 190.223.
The terms and conditions of this Order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
)
In the Matter of )
)
Denbury Gulf Coast Pipelines, LLC, ) CPF No. 4-2022-017-NOPV
)
Respondent. )
)
CONSENT AGREEMENT
On May 26, 2022, pursuant to 49 C.F.R. § 190.207, the Pipeline and Hazardous Materials Safety
Administration (“PHMSA”), Office of Pipeline Safety (“OPS” or “Agency”), issued a Notice of
Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order (“Notice”) to
Denbury Gulf Coast Pipelines, LLC (“Denbury” or “Respondent”). The Notice alleged that
Respondent committed probable violations of 49 C.F.R. Part 195, proposed a civil penalty, and
proposed certain actions be taken by Denbury. The claims in the Notice relate to a release of CO2
on February 22, 2020, from Denbury’s pipeline in the vicinity of Satartia, Mississippi including
Denbury’s associated response and reporting related to the incident (the “Satartia Release”).
After receiving an extension of time to respond, on July 25, 2022, Denbury responded to the Notice
by timely submitting a Request for Settlement Conference and Hearing pursuant to 49 C.F.R. §
190.208(a)(4). Settlement discussions were held virtually on August 10, August 19, and
September 22, 2022.
As a result of these settlement discussions, PHMSA and Denbury (collectively, the “Parties”)
agreed that settlement of the Notice will avoid further administrative proceedings or litigation and
will serve the public interest by promoting safety and protection of the environment. Pursuant to
49 C.F.R. Part 190, and upon consent and agreement of Denbury and PHMSA, the Parties hereby
agree as follows:
I. General Provisions
1. Respondent acknowledges that it is the operator of a 111-mile CO2 pipeline that
runs from Jackson Dome, Mississippi to Delhi, Louisiana (the “Delta Pipeline”) and that the Delta
Pipeline is subject to the jurisdiction of the federal pipeline safety laws, 49 U.S.C. § 60101, et seq.,
including the regulations and administrative orders issued thereunder. For purposes of this
Consent Agreement (“Agreement”), Respondent acknowledges that it received proper notice of
PHMSA’s action in this proceeding and that the Notice states claims upon which relief may be



granted pursuant to 49 U.S.C. § 60101, et seq., including the regulations and orders issued
thereunder.
2. After Denbury returns this signed Agreement to PHMSA, the Agency’s
representative will present it to the Associate Administrator for Pipeline Safety, recommending
that the Associate Administrator adopt the terms of this Agreement by issuing an administrative
order (“Consent Order” or “Order”) incorporating the terms of this Agreement. The terms of this
Agreement constitute an offer of settlement until a Consent Order is issued by the Associate
Administrator.
3. Respondent consents to the issuance of the Consent Order, and hereby waives any
further procedural requirements with respect to its issuance. Respondent waives all rights to
contest the adequacy of notice, or the validity of the Consent Order or this Agreement, including
all rights to administrative or judicial hearings or appeals, except as set forth herein. Respondent
agrees to withdraw its request for an administrative hearing regarding the Notice.
4. This Agreement shall apply to and be binding upon PHMSA, and upon Denbury,
its officers, directors, and employees, and its successors, assigns, or other entities or persons
otherwise bound by law. Respondent agrees to provide a copy of this Agreement and any
incorporated compliance orders and schedules to all of Denbury’s officers, employees, and agents
whose duties might reasonably include compliance with this Agreement.
5. This Agreement constitutes the final, complete, and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this Agreement.
PHMSA acknowledges that the claims asserted in the Notice constitute all claims of probable
violations that it will assert against Denbury arising out of the Satartia Release. The Parties
acknowledge that there are no representations, agreements, or understandings relating to settlement
other than those expressly contained in this Agreement, except that the terms of this Agreement
may be construed by reference to the Notice.
6. Nothing in this Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the federal pipeline safety laws, 49 U.S.C. § 60101, et
seq., and the regulations and orders issued thereunder. Nothing in this Agreement alters PHMSA’s
right of access, entry, inspection, and information gathering or PHMSA’s authority to bring
enforcement actions against Denbury pursuant to the federal pipeline safety laws, the regulations
and orders issued thereunder, or any other provision of federal or state law except as otherwise
resolved through this Consent Order.
7. For all direct transfers of complete ownership or operating responsibility of the
Delta Pipeline which occur while this Agreement is in effect, Denbury will provide a copy of this
Agreement to the prospective transferee at least 30 days prior to such transfer. Denbury will
provide written notice of the transfer to the Director no later than 60 days after the transfer occurs,
provided, however, that nothing herein shall require Denbury to provide such notice to the Director
in connection with financing or other commercial transactions involving the pipeline that include
the creation of secured interests.



8. This Agreement does not waive or modify any federal, state, or local laws or
regulations that are applicable to the Delta Pipeline. This Agreement is not a permit, or a
modification of any permit, under any federal, state, or local laws or regulations. Denbury remains
responsible for achieving and maintaining compliance with all applicable federal, state, and local
laws, regulations, and permits.
9. This Agreement does not create rights in, or grant any cause of action to, any third
party that is not a party to this Agreement. The U.S. Department of Transportation is not liable
for any injuries or damages to persons or property arising from acts or omissions of Respondent
or its officers, employees, or agents carrying out the work required by this Agreement. Denbury
agrees to hold harmless the U.S. Department of Transportation, its officers, employees, agents,
and representatives from any and all causes of action arising from any acts or omissions of
Respondent or its contractors in carrying out any work required by this Agreement.
10. Respondent does not admit to any of the alleged violations or risks identified in the
Notice and has provided PHMSA a detailed response outlining its position. However, for the
purposes of this Agreement, Respondent agrees to the findings of violation, and agrees to address
the alleged violations and risks identified in the Notice by completing the actions specified in
Section VI of this Agreement (Compliance Requirements) and to abide by the terms of this
Agreement.
11. Except as set forth herein, this Agreement does not constitute a finding of violation
of any federal law or regulation and may not be used in any civil proceeding of any kind as
evidence or proof of any fact, fault or liability, or as evidence of a violation of any law, rule,
regulation, or requirement, except in a proceeding to enforce the provisions of this Agreement or
in future PHMSA enforcement actions. Respondent does not admit any allegation or conclusion
in the Notice or this Agreement and Order, but agrees, for purposes of this Agreement and Order,
to address the alleged risk conditions by completing the terms of this Agreement.
II. Definitions
12. The “Director” means the Director, Pipeline and Hazardous Materials Safety
Administration, Office of Pipeline Safety, Southwest Region. The Director’s address is 8701 S.
Gessner, Suite 630, Houston, TX 77074.
13. The “Satartia Release” or “Failure” means the release of carbon dioxide that
occurred on Denbury’s Delta Pipeline in the vicinity of Satartia, Mississippi, including Denbury’s
associated response, which Denbury reported to the National Response Center on February 22,
2020.
III. Findings of Violations
14. Item 2 of the Notice: With respect to Item 2, the Notice alleged a violation of 49
C.F.R. § 195.401(b)(1), which Denbury contested. Denbury acknowledges that portions of its
pipeline, including the segment of the Delta Pipeline near the failure site, were subject to erosion
and sloughing type geohazard risks but failed to recognize this particular geohazard and the
associated risk prior to the Satartia Release. Given this acknowledgment, PHMSA instead finds
that Denbury violated 49 C.F.R. § 195.402(c)(13) by failing to review its procedures for



monitoring and addressing geohazard risks to determine their effectiveness and by failing to
correct deficiencies in the geohazard program. Due to the failure to recognize certain geohazard
risks, Denbury also failed to review and revise its procedures in order to ensure that they involved
comprehensive measures to detect and mitigate these geohazard risks. This finding of violation
shall be considered by PHMSA as a prior offense in any future PHMSA enforcement action taken
against Respondent.
15. Item 3 of the Notice: With respect to Item 3, the Notice alleged a violation of 49
C.F.R. § 195.402(c)(12) and (e)(7), which Denbury contested. PHMSA finds that Denbury
violated 49 C.F.R. § 195.402(c)(12) and (e)(7) by its failure to formally meet with the Tri-
Community Volunteer Fire Department as part of its liaison efforts. Information from Denbury
demonstrates that Denbury met with relevant emergency responders at the Yazoo County level as
part of its liaison efforts and Public Awareness program, but failed to meet formally with the Tri-
Community Volunteer Fire Department because Denbury had not identified Satartia as a “could
affect” High Consequence Area (“HCA”) for this segment. Although Denbury officials had
informal contacts with the head of the Fire Department, those contacts were not sufficient to advise
and consult on all topics required to be addressed. This finding of violation shall be considered
by PHMSA as a prior offense in any future PHMSA enforcement action taken against Respondent.
16. Item 4 of the Notice: With respect to Item 4, the Notice alleged a violation of 49
C.F.R. § 195.408, which Denbury contested. Notwithstanding Denbury’s objections and denial,
PHMSA finds that Denbury violated 49 C.F.R. § 195.408 because it failed to establish
communication with local fire, police, and other appropriate public officials during this emergency
condition. Denbury became aware of SCADA data suggesting a potential significant pressure drop
and immediately dispatched Operations Personnel to confirm whether there was a release and to
identify its location. However, because the location of the release had not been confirmed or
identified, Denbury did not immediately reach out to the local responders and no external contact
with emergency responders occurred until Denbury staff were contacted by the local fire chief
approximately 42 minutes after the SCADA indication. This finding of violation shall be
considered by PHMSA as a prior offense in any future PHMSA enforcement action taken against
Respondent.
17. Item 5 of the Notice: With respect to Item 5, the Notice alleged a violation of 49
C.F.R. § 195.412, which Denbury contested. Notwithstanding Denbury’s objections and denial,
PHMSA finds that Denbury violated 49 C.F.R. § 195.412 by failing to conduct adequate right-of-
way inspections. The aerial patrolling program failed to record in at least one location on the Delta
Pipeline the observation of a sloughing condition that reflected a potential geohazard condition
that should have been recorded and followed-up on. In the area where the pipeline rupture
occurred, Denbury had not identified any conditions associated with geohazards that were visible
in the right-of-way before the event but that were not recorded on the aerial patrolling reports.
This finding of violation shall be considered by PHMSA as a prior offense in any future PHMSA
enforcement action taken against Respondent.
18. Item 6 of the Notice: With respect to Item 6, the Notice alleged a violation of 49
C.F.R. § 195.440, which Denbury contested. PHMSA finds that with respect to the Satartia area,
Denbury violated 49 C.F.R. § 195.440 by failing to conduct the activities described in both its
written operations and maintenance (O&M) plan and its Public Awareness and Damage Prevention



Program developed to comply with § 195.440 with respect to the town of Satartia. Specifically,
the events of February 22, 2020 showed that the earlier PHAST dispersion analysis was wrong
and that the town of Satartia was a “could-affect” HCA and should have been included in
Denbury’s Public Awareness and Damage Prevention Program. Denbury also had not chosen as
a discretionary matter to increase its buffer zone which it could have done under its policy,
notwithstanding the modeling that showed Satartia to be outside the expected impact zone. This
finding of violation shall be considered by PHMSA as a prior offense in any future PHMSA
enforcement action taken against Respondent.
19. Item 7 of the Notice: With respect to Item 7, the Notice alleged a violation of 49
C.F.R. § 195.452(d), which Denbury contested. Denbury now considers Satartia as being in a
“could affect” HCA because Denbury has reassessed all segments on all of its lines that are located
within two miles of an HCA where the terrain creates a risk that a leak of carbon dioxide “could
affect” an HCA by supplementing its air dispersion modeling with an overland spread analysis. In
consideration of Denbury’s agreement to the other findings of violation and remaining terms of
the agreement, PHMSA withdraws the alleged violation of § 195.452(d). However, Denbury
agrees to perform the proposed Compliance Requirements for Item 7, as described below.
20. Item 8 of the Notice: With respect to Item 8, the Notice alleged a violation of 49
C.F.R. § 195.452(f)(6) and (i)(1), which Denbury contested. Notwithstanding Denbury’s
objections and denial, PHMSA finds that Denbury violated 49 C.F.R. § 195.452(f)(6) and (i)(1)
by failing to conduct a risk analysis that evaluated geohazards and by failing to identify and take
preventive and mitigative measures to address geohazard risks in all HCAs and “could affect”
HCAs. This finding of violation shall be considered by PHMSA as a prior offense in any future
PHMSA enforcement action taken against Respondent.
IV. Civil Penalties
21. Item 2 of the Notice: With respect to Item 2, the Notice proposed a civil penalty
of $2,251,334. With respect to culpability, Denbury asserted that the comments from the District
Manager were not referring to geohazards at the failure location. Therefore, PHMSA finds it
appropriate to reduce the culpability determination to “[t]he operator failed to comply with an
applicable requirement.” Without admission, Respondent agrees to pay a reduced civil penalty of
$1,935,300 for Item 2 of the Notice.
22. Item 3 of the Notice: With respect to Item 3, the Notice proposed a civil penalty
of $46,600. Without admission, Respondent agrees to pay a civil penalty of $46,600 for Item 3
as proposed in the Notice.
23. Item 4 of the Notice: With respect to Item 4, the Notice proposed a civil penalty
of $46,600. Without admission, Respondent agrees to pay a civil penalty of $46,600 for Item 4 as
proposed in the Notice.
24. Item 5 of the Notice: With respect to Item 5, the Notice proposed a civil penalty
of $46,600. Without admission, Respondent agrees to pay a civil penalty of $46,600 for Item 5 as
proposed in the Notice.



25. Item 6 of the Notice: With respect to Item 6, the Notice proposed a civil penalty
of $46,600. Without admission, Respondent agrees to pay a civil penalty of $46,600 for Item 6
as proposed in the Notice.
26. Item 7 of the Notice: With respect to Item 7, the Notice proposed a civil penalty
of $46,600. For the reasons set forth above, PHMSA withdraws the underlying allegation of
violation for this Item. As such, PHMSA also withdraws the civil penalty for Item 7 of the Notice.
27. Item 8 of the Notice: With respect to Item 8, the Notice proposed a civil penalty
of $1,382,400. With respect to gravity, PHMSA reduces the gravity of the violation from
“increased the severity of an accident/incident” to “occurred within an HCA . . . .” in light of
information presented that had Denbury conducted a geohazard risk analysis, it would not have
decreased the “severity” of the release. Without admission, Respondent agrees to pay a reduced
civil penalty of $746,400 for Item 8 of the Notice.
28. Respondent agrees to pay an adjusted civil penalty amount of $2,868,100 within 20
calendar days of the Effective Date pursuant to the instructions PHMSA has provided for payment.
V. Warning Item
29. Item 1 of the Notice: With respect to Item 1 of the Notice, alleging a probable
violation of 49 C.F.R. § 195.52, this Item was issued as a warning item. Respondent accepts the
warning as alleged in the Notice.
VI. Compliance Requirements
30. Items 2 and 8 of the Notice: Denbury agrees to update its geohazard program to
address hazards on all of its pipelines as well as include preventative and mitigative measures to
enhance public safety and safe operation of its pipeline system. The geohazard program must
include substantive information regarding hazard identification on each pipeline, assessment,
remediation, and hazard recognition training for employees responsible for identifying geohazard
issues.
31. Items 3 and 6 of the Notice: Utilizing the revised dispersion modeling calculations
performed following the Satartia Release and taking into account all newly identified HCAs or
“could affect” HCAs pipeline segments, Denbury agrees to:
i. Identify all federal, state, and local government organizations that may
respond to a pipeline emergency that were not formerly identified and included within
Denbury’s liaison program and ensure that they are included within Denbury’s liaison
activities as specified in Denbury’s manual for operations pursuant to 49 C.F.R. §
195.402(c)(12) and § 195.402(e)(7);
ii. Identify all federal, state, and local government organizations that may
respond to a pipeline emergency that were not formerly identified and included within
Denbury’s Public Awareness program and ensure that they are included within Denbury’s
Public Awareness program as specified in Denbury’s manual for operations pursuant to 49
C.F.R. § 195.440;



iii. Identify a comprehensive list of stakeholders for the Delta Pipeline and
revise its written procedure OMO 0232 Damage Prevention and Public Awareness Section
3.3 Stakeholder Groups (Revised 2/12/2012);
iv. Meet with all federal, state, and local government organizations that may
respond to a pipeline emergency that were not formerly identified and included within
either Denbury’s liaison program or Public Awareness program, or that were not on the
prior list of stakeholders in Section 3.3 Stakeholder Groups, in each case to ensure that they
are aware of the Delta Pipeline in their response areas and provide a copy of the district
area emergency response procedures.
v. Maintain documentation of its compliance with the requirements of
paragraph 31 (i) through (iv) and submit such documentation to the Director; which shall
include:
(1) Record of invitation to each local responder;
(2) Name and contact information (address, county, and phone
numbers);
(3) Attendance sheet with signatures of those in attendance;
(4) Procedures and other information covered/discussed;
(5) Record of documents provided to attendees; and
(6) Record of documents mailed/provided to non-attendees.
32. Item 5 of the Notice: Denbury agrees to complete a review of its written procedure
O&M 0215, Patrolling and Leak Detection, and, based on that review, to include within O&M
0215 additional guidance for the identification of potential geohazard sites and the training of
personnel on the amended procedures.
33. Items 7 and 8 of the Notice: Denbury agrees to update its dispersion model and
buffer zone assessment by employing a model that considers the characteristics of CO2 and the
effects of the specific terrain surrounding the Delta Pipeline, including effects of both elevation
changes and channeling, upon the release of CO2 to the atmosphere. Additionally, Denbury agrees
to assess the extent and coverage of potential vapor cloud releases by updating its dispersion model
to allow for variable inputs relating to foreseeable weather and pipeline operating conditions.
Denbury agrees to incorporate newly identified HCAs or “could affect” HCA pipeline segments
in its Integrity Management Program and Public Awareness Program and conduct a baseline
assessment. Denbury agrees to conduct a risk analysis and will identify additional preventive and
mitigative measures to enhance public safety or environmental protection for all HCAs or “could
affect” HCA pipeline segments.
34. If PHMSA disputes either the sufficiency of Denbury’s measures or the adequacy
of its documentation with respect to the requirements of paragraphs 30 through 33, the parties shall



first informally attempt to resolve any disputes before engaging in dispute resolution according to
paragraph 38. Unless PHMSA presents any dispute regarding the sufficiency of Denbury’s
measures or the adequacy of its documentation with respect to the above paragraphs within 60
days, the Director will promptly confirm in writing to Denbury that the obligations in paragraphs
30 through 33 are satisfied in accordance with paragraph 41.
35. Denbury must complete item v in paragraph 31 within 60 days of the Effective
Date. The Director will determine if such compliance requirement is adequate within 60 days after
submission and timely fulfill its obligations pursuant to Section XI.
36. Denbury agrees to maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is requested
that these costs be reported in two categories: 1) total cost associated with preparation/revision of
plans, procedures, studies, and analyses, and 2) the total cost associated with replacements,
additions, and other changes to pipeline infrastructure.
VII. Enforcement
37. This Agreement is subject to all enforcement authorities available to PHMSA under
49 U.S.C. § 60101, et seq., and 49 C.F.R. Part 190, including administrative civil penalties as
specified in 49 U.S.C. § 60122 and 49 C.F.R. § 190.223 (presently up to $239,142 per violation
for each day the violation continues) and referral of the case to the Attorney General for judicial
enforcement, if PHMSA determines that Respondent is not complying with the terms of this
Agreement in accordance with determinations made by the Director, or if appealed, in accordance
with decisions of the Associate Administrator. The maximum administrative civil penalty amounts
are adjusted annually for inflation. See 49 C.F.R. § 190.223.
VIII. Dispute Resolution
38. The Director and Denbury will informally attempt to resolve any disputes arising
under this Agreement, including, but not limited to, any decision of the Director. If Denbury and
the Director are unable to informally resolve the dispute within 15 calendar days after the dispute
is first raised, in writing, Denbury may submit a written request for a determination resolving the
dispute from the Associate Administrator for Pipeline Safety. The written request for a
determination must be provided to the Director, counsel for the Southwest Region, and to the
Associate Administrator no later than 10 calendar days after the 15-day deadline for informal
resolution referenced in this paragraph. Along with its request, Denbury must provide the
Associate Administrator with all information Denbury believes is relevant to the dispute.
Determinations of the Associate Administrator under this paragraph constitute final Agency
action. The existence of a dispute and PHMSA’s consideration of matters placed in dispute, will
not excuse, toll, or suspend any term or timeframe for completion of any work to be performed
under this Agreement during the pendency of the dispute resolution process, except as agreed upon
by the Director or Associate Administrator in writing.
IX. Effective Date
39. The term “Effective Date,” as used herein, is the date on which the Consent Order
is issued by the Associate Administrator, PHMSA, incorporating the terms of this Agreement.



X. Modification
40. The terms of this Agreement may be modified by mutual agreement of the Parties.
Such modifications must be in writing and signed by both parties.
XI. Termination
41. This Agreement will remain in effect until the Compliance Requirements in Section
VI are satisfied, as reasonably and timely determined by the Director. The Consent Agreement
shall not terminate until the Director confirms, in writing, that the Consent Agreement is
terminated in accordance with this paragraph. Nothing in this Agreement prevents Respondent
from completing any of the obligations earlier than the deadlines provided for in this Agreement
or seeking dispute resolution regarding the question of whether the Compliance Requirements
have been satisfied.
XII. Ratification
42. The Parties’ undersigned representatives certify that they are fully authorized to
enter into the terms and conditions of this Agreement and to execute and legally bind such party
to this document.
43. The Parties hereby agree to all findings, conditions, and terms of this Agreement.
For Denbury Gulf Coast Pipelines, LLC:
____________________________________
David E. Sheppard
Executive Vice President and Chief Operating Officer
____________________________________
Date
For PHMSA:
____________________________________
Bryan Lethcoe
Director, Southwest Region
____________________________________
Date
- **truncated:** false