# PERMIAN EXPRESS PARTNERS LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42022040NOPV
- **title:** PERMIAN EXPRESS PARTNERS LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-10-11
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.412(a), 195.452(i)(1), 195.52(a)(3), 195.573(e), 195.583(a), 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022040nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022040nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42022040nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42022040NOPV
**body:**

Notice of Probable Violation involving PERMIAN EXPRESS PARTNERS LLC. PHMSA's enforcement data identifies the cited regulations as 195.412(a),  195.452(i)(1),  195.52(a)(3),  195.573(e),  195.583(a),  195.589(c). The case was opened on 2022-10-11 and is reported as closed as of 2024-03-28. Proposed civil penalty: $22,800. Assessed civil penalty: $22,800. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42022040NOPV_Closure Letter (Revised)_03282024_(21-202527).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Closure%20Letter%20(Revised)_03282024_(21-202527).pdf

42022040NOPV_Closure Letter (Revised)_03282024_(21-202527)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Closure%20Letter%20(Revised)_03282024_(21-202527)_text.pdf

42022040NOPV_Closure Letter_03222024_(21-202527).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Closure%20Letter_03222024_(21-202527).pdf

42022040NOPV_Closure Letter_03222024_(21-202527)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Closure%20Letter_03222024_(21-202527)_text.pdf

42022040NOPV_Final Order_06302023_(21-202527).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Final%20Order_06302023_(21-202527).pdf

42022040NOPV_Final Order_06302023_(21-202527)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Final%20Order_06302023_(21-202527)_text.pdf

42022040NOPV_Operator Response to Notice_11182022_(21-202527).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_Operator%20Response%20to%20Notice_11182022_(21-202527).pdf

42022040NOPV_PCO PCP_10112022_(21-202527).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_PCO%20PCP_10112022_(21-202527).pdf

42022040NOPV_PCO PCP_10112022_(21-202527)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022040NOPV/42022040NOPV_PCO%20PCP_10112022_(21-202527)_text.pdf

42022040NOPV_Closure Letter (Revised)_03282024_(21-202527)_text.pdf

VIA ELECTRONIC MAIL TO: gregory.mcilwain@energytransfer.com
March 28, 2024
Gregory McIlwain
Executive Vice President, Operations
Permian Express Partners, LLC
1300 Main Street
Houston, Texas 77002
CPF 4-2022-040-NOPV
Dear Mr. McIlwain:
On June 30, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Permian Express Partners a Final Order in the above-referenced case. This Order included a
Compliance Order and Civil Penalty assessment and requirement to take corrective actions on
your pipeline. Based on our review of the documentation you provided and confirmation of
payment of the civil penalty, it has been determined that you have complied with the terms of
this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Todd Nardozzi, Director, Regulatory Compliance, Energy Transfer, LP,
todd.nardozzi@energytransfer.com

42022040NOPV_Closure Letter_03222024_(21-202527)_text.pdf

VIA ELECTRONIC MAIL TO: gregory.mcilwain@energytransfer.com
March 22, 2023
Gregory McIlwain
Executive Vice President, Operations
Permian Express Partners, LLC
1300 Main Street
Houston, Texas 77002
CPF 4-2022-040-NOPV
Dear Mr. McIlwain:
On June 30, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Permian Express Partners a Final Order in the above-referenced case. This Order included a
Compliance Order and Civil Penalty assessment and requirement to take corrective actions on
your pipeline. Based on our review of the documentation you provided and confirmation of
payment of the civil penalty, it has been determined that you have complied with the terms of
this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Todd Nardozzi, Director, Regulatory Compliance, Energy Transfer, LP,
todd.nardozzi@energytransfer.com

42022040NOPV_Final Order_06302023_(21-202527)_text.pdf

June 30, 2023
VIA ELECTRONIC MAIL TO: gregory.mcilwain@energytransfer.com
Gregory McIlwain
Executive Vice President, Operations
Permian Express Partners, LLC
1300 Main Street
Houston, Texas 77002
Re: CPF No. 4-2022-040-NOPV
Dear Mr. McIlwain:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, withdraws one alleged violation, assesses a civil penalty of $22,800, and specifies
actions that need to be taken by Permian Express Partners, LLC, to comply with the pipeline
safety regulations. The penalty payment terms are set forth in the Final Order. When the civil
penalty has been paid and the terms of the compliance order completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Todd Nardozzi, Director, Regulatory Compliance, Permian Express Partners, LLC,
todd.nardozzi@energytransfer.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Permian Express Partners, LLC, ) CPF No. 4-2022-040-NOPV
a subsidiary of Energy Transfer, LP, )
)
Respondent. )
____________________________________)
FINAL ORDER
From March 1, 2021, through November 16, 2021, pursuant to 49 U.S.C. § 60117, a
representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office
of Pipeline Safety (OPS), inspected Permian Express Partners, LLC’s (Permian Express or
Respondent) Patoka Pipeline system in Illinois, Missouri, Arkansas, and Texas. The Permian
Express pipelines consist of approximately 1,700 miles of crude oil pipeline extending from
producing areas in the Permian Basin of Texas through Louisiana, Arkansas, Missouri, and
Illinois.1 Permian Express is a subsidiary of Energy Transfer, LP.2
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated October 11, 2022, a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that Permian Express committed three violations of 49 C.F.R. Part 195,
proposed assessing a civil penalty of $22,800 for the alleged violations, and proposed ordering
Respondent to take certain measures to correct the alleged violations. The Notice also included
an additional three warning items pursuant to 49 C.F.R. § 190.205, which warned the operator to
correct the probable violations or face possible future enforcement action.
Permian Express requested an extension of time to respond to the Notice on November 9, 2022.
PHMSA granted this request. Respondent responded to the Notice by letter dated November 18,
2022 (Response). Permian Express contested several of the allegations, offered additional
information in response to the Notice, and requested that PHMSA find that it satisfied the
proposed compliance order associated with one of the alleged violations. Respondent did not
request a hearing and therefore has waived its right to one.
1 Crude Oil, ENERGY TRANSFER, https://energytransfer.com/crude-oil/ (last accessed June 27, 2023).
2 Id.



FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a)….
(i) What preventative and mitigative measures must an operator take to
protect the high consequence area?
(1) General requirements. An operator must take measures to prevent
and mitigate the consequences of a pipeline failure that could affect a high
consequence area. These measures include conducting a risk analysis of the
pipeline segment to identify additional actions to enhance public safety or
environmental protection. Such actions may include, but are not limited to,
implementing damage prevention best practices, better monitoring of
cathodic protection where corrosion is a concern, establishing shorter
inspection intervals, installing EFRDs on the pipeline segment, modifying
the systems that monitor pressure and detect leaks, providing additional
training to personnel on response procedures, conducting drills with local
emergency responders and adopting other management controls.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1) by failing to conduct a
risk analysis for its pipeline facilities located in Beaumont and Nederland, Texas, in accordance
with § 195.452(i)(1) and its written procedures. Specifically, Respondent’s written pipeline
integrity management plan section 4.6, Facility Threat/Risk Analysis and Preventative and
Mitigative Measures, requires a facility risk analysis (HAZOP) and mitigative study to be
performed for the facilities in Beaumont and Nederland, Texas.
In its Response, Respondent did not contest the allegation of violation and provided additional
information regarding its corrective actions. Accordingly, after considering all of the evidence, I
find that Permian Express violated 49 C.F.R. § 195.452(i)(1) by failing to conduct a risk analysis
for its pipeline facilities located in Beaumont and Nederland, Texas, in accordance with
§ 195.452(i)(1) and its written procedures.
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.573(e), which states:
§ 195.573 What must I do to monitor external corrosion control?
(a)….
(e) Corrective action. You must correct any identified deficiency in
corrosion control as required by § 195.401(b). However, if the deficiency
involves a pipeline in an integrity management program under § 195.452,
you must correct the deficiency as required by § 195.452(h).
The Notice alleged that Respondent violated 49 C.F.R. § 195.573(e) by failing to correct
identified corrosion control deficiencies. Specifically, the Notice alleged that Permian Express



failed to correct three identified corrosion control deficiencies within one calendar year, as
required by its procedure;3 failed to correct deficiencies at 13 test stations in 2018, 2019, and
2020 where it identified low pipe-to-soil readings for cathodic protection; and failed to remediate
depleted groundbeds and deficiencies that were needed to ensure the proper performance of
rectifiers on its cathodic protection system within one calendar year in 2018, 2019, and 2020.
In its Response, Respondent did not contest the allegation of violation and provided additional
information regarding its corrective actions.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.573(e) by failing to correct identified corrosion control deficiencies.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
WITHDRAWAL OF ITEM
Item 6: The Notice alleged that Respondent violated 49 C.F.R. § 195.589(c), which states:
§ 195.589 What corrosion control information do I have to maintain?
(a)….
(c) You must maintain a record of each analysis, check, demonstration,
examination, inspection, investigation, review, survey, and test required by
this subpart in sufficient detail to demonstrate the adequacy of corrosion
control measures or that corrosion requiring control measures does not
exist. You must retain these records for at least 5 years, except that records
related to §§ 195.569, 195.573(a) and (b), and 195.579(b)(3) and (c) must
be retained for as long as the pipeline remains in service.
The Notice alleged that Respondent violated 49 C.F.R. § 195.589(c) by failing to maintain
corrosion control records in accordance with § 195.589(c) for Tank 348. Specifically, the Notice
alleged that a record of an atmospheric corrosion inspection carried out on April 3, 2019, on
Tank 348 failed to indicate any items of concern or items requiring follow-up regarding
corrosion on the tank shell. The Notice further stated that an external inspection report carried
out for the same tank from February 18, 2014, indicated that there was corrosion on the shell and
roof areas.
In its Response, Permian Express argued that it complied with § 195.589(c) by maintaining
records of the February 18, 2014 and April 3, 2019 inspections of Tank 348 and providing those
records to PHMSA.4 Respondent noted that corrosion was reported in both inspection reports
3 Section 4.0 of the Corrosion Control Remedial Action, HLD.40 (Effective Date 04/01/2018).
4 Permian Express Partners, LLC, CPF No. 4-2022-040-NOPV Written Response to Notice of Probable Violation,
Proposed Civil Penalty and Proposed Compliance Order, dated November 18, 2022 (hereinafter “Response”) (on
file with PHMSA), at 12.



and that “at no time was [the corrosion] determined to have deteriorated to the degree of being
out of compliance with API 650 / 653 standards and requiring immediate remediation in order to
continue service.”5
After considering all of the evidence, I find that the allegation of violation should be withdrawn
because the evidence fails to sufficiently establish that Respondent failed to maintain a record of
each atmospheric corrosion inspection of Tank 348 to demonstrate the adequacy of corrosion
control measures. Although the Notice alleged that Respondent’s record from the 2019
atmospheric corrosion inspection failed to indicate any items of concern or items requiring
follow-up, the report in question did record several items of note. For example, the report noted
the external shell coating was weathered, that the condition should be monitored for continued
deterioration, and that consideration should be given to properly cleaning and re-coating. The
report recorded there was coating failure on the shell stiffener but that based on ultrasonic
thickness readings this was noted for information only. The report noted corrosion located at the
nine o'clock position of a nozzle that should be replaced the next time the tank has major repairs.
These and other conditions were documented with photographs.6
Because I find there is insufficient evidence to find a violation of § 195.589(c) for failure to
maintain a record of each atmospheric corrosion inspection of Tank 348, I hereby order that Item
6 be withdrawn.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.7
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require. The Notice
proposed a total civil penalty of $22,800 for the violations cited above.
5 Id., at 13.
6 Item 6 did not allege a violation for failing to remediate atmospheric corrosion as may be required pursuant to
§§ 195.401 or 195.583. This Final Order does not preclude potential future enforcement if the Director finds
Respondent failed to remediate identified atmospheric corrosion. The allegation in Item 6 is limited to the alleged
failure to maintain records.
7 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223 for adjusted amounts.



Item 4: The Notice proposed a civil penalty of $22,800 for Respondent’s violation of 49 C.F.R.
§ 195.573(e), for failing to correct identified corrosion control deficiencies. Respondent neither
contested the allegation nor presented any evidence or argument justifying a reduction in or
elimination of the proposed penalty. Accordingly, having reviewed the record and considered
the assessment criteria, I assess Respondent a civil penalty of $22,800 for violation of 49 C.F.R.
§ 195.573(e).
Payment of the civil penalty must be made within 20 days after receipt of this Final Order.
Federal regulations (49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer
through the Federal Reserve Communications System (Fedwire), to the account of the U.S.
Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
transfers should be directed to: Financial Operations Division (AMK-325), Federal Aviation
Administration, Mike Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City,
Oklahoma 79169. The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the civil penalty will result in accrual of interest at the current annual rate in
accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to those
same authorities, a late penalty charge of six percent (6%) per annum will be charged if payment
is not made within 110 days of service. Furthermore, failure to pay the civil penalty may result
in referral of the matter to the Attorney General for appropriate action in a district court of the
United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 3, 4, and 6 in the Notice for
violations of 49 C.F.R. §§ 195.452(i)(1), 195.573(e), and 195.589(c), respectively. Under 49
U.S.C. § 60118(a), each person who engages in the transportation of hazardous liquids or who
owns or operates a pipeline facility is required to comply with the applicable safety standards
established under chapter 601. As discussed above, Item 6 has been withdrawn. Therefore, the
compliance terms proposed in the Notice for Item 6 are not included in this Order. The Director
has indicated that Respondent has taken the following actions to address Item 3:
Permian Express has completed HAZOP assessments of the pipeline facilities located
in Beaumont and Nederland, Texas, in accordance with § 195.452(i)(1) and its
written procedures.
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice for Item 3 are not included in this Order.
Respondent did not contest the proposed compliance terms for Item 4. Pursuant to the authority
of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the following
actions to ensure compliance with the pipeline safety regulations applicable to its operations:
1. With respect to the violation of § 195.573(e) (Item 4), Respondent must submit a plan
to have the cathodic protection remediated at the 13 identified locations within 90 days of



receipt of the Final Order. Permian Express must also submit a plan to remediate any
identified corrosion control deficiencies from the calendar year 2021 annual pipe-to-soil
survey remediated within 90 days of receipt of the Final Order. Respondent must also
submit a remediation plan for all rectifier systems where there has not been current output
following the calendar years 2020 and 2021 inspections completed within 90 days of
receipt of the Final Order. Permian Express shall provide records showing completion of
remedial activities and inspections within the submitted remedial action plans for this
Item within 60 days of the completion of the inspections and remediations carried out
following the Final Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
PHMSA requests that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in administrative assessment of civil penalties not
to exceed $200,000, as adjusted for inflation (see 49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
WARNING ITEMS
With respect to Items 1, 2, and 5, the Notice alleged probable violations of Part 195, but
identified them as warning items pursuant to § 190.205. The warnings were for:
49 C.F.R. § 195.52(a) (Item 1) ─ Respondent’s alleged failure to provide
notification within one hour after confirmed discovery of an accident where the
estimated property damage exceeded $50,000;
49 C.F.R. § 195.412(a) (Item 2) ─ Respondent’s alleged failure to conduct right-
of way (ROW) inspections capable of observing the surface conditions on or
adjacent to each pipeline; and
49 C.F.R. § 195.583(a) (Item 5) ─ Respondent’s alleged failure to inspect its
pipeline exposed to the atmosphere for evidence of atmospheric corrosion in
accordance with § 195.583(a).
Permian Express requested withdrawal of Item 1, because it believes it complied with the
reporting requirements of § 195.52(a). Under § 190.205, PHMSA does not adjudicate warning
items to determine whether a probable violation occurred. Respondent provided additional



information regarding its actions to address Items 2 and 5. If OPS finds a violation of these
provisions in a subsequent inspection, Permian Express may be subject to future
enforcement action.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The filing of a
petition automatically stays the payment of any civil penalty assessed. The other terms of the
order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
June 30, 2023
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false