# BRAVO PIPELINE COMPANY — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42023039NOPV
- **title:** BRAVO PIPELINE COMPANY — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-05-11
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.452(l)(1)(ii).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023039nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023039nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023039nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42023039NOPV
**body:**

Notice of Probable Violation involving BRAVO PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 195.452(l)(1)(ii). The case was opened on 2023-05-11 and is reported as closed as of 2024-03-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42023039NOPV_Closure Letter_03182024_(22-234780).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_Closure%20Letter_03182024_(22-234780).pdf

42023039NOPV_Closure Letter_03182024_(22-234780)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_Closure%20Letter_03182024_(22-234780)_text.pdf

42023039NOPV_Final Order_09192023_(22-234780).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_Final%20Order_09192023_(22-234780).pdf

42023039NOPV_Final Order_09192023_(22-234780)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_Final%20Order_09192023_(22-234780)_text.pdf

42023039NOPV_Operator Response to Notice_05242023_(22-234780).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_Operator%20Response%20to%20Notice_05242023_(22-234780).pdf

42023039NOPV_PCO_05112023_(22-234780).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_PCO_05112023_(22-234780).pdf

42023039NOPV_PCO_05112023_(22-234780)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023039NOPV/42023039NOPV_PCO_05112023_(22-234780)_text.pdf

42023039NOPV_Closure Letter_03182024_(22-234780)_text.pdf

VIA ELECTRONIC MAIL TO: vishal gupta@oxy.com
March 18, 2024
Vishal Gupta
President and General Manager for Oxy EOR
Bravo Pipeline Company
5 Greenway Plaza Suite 110
Houston, Texas 77046
CPF 4-2023-039 NOPV
Dear Mr. Gupta:
On September 19, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Bravo Pipeline Company’s (Bravo) carbon dioxide (CO2) transmission pipeline system
a Final Order in the above-referenced case. This Order included a Compliance Order. Based on
our review of the documentation you provided, it has been determined that you have complied
with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Lee Turfe, Manager Control Center, Occidental Petroleum Corporation,
lee_turfe@oxy.com
Bradey Holland, Pipeline Operations Lead, Occidental Petroleum Corporation,
Bradey_holland@oxy.com

42023039NOPV_Final Order_09192023_(22-234780)_text.pdf

September 19, 2023
VIA ELECTRONIC MAIL TO: vishal gupta@oxy.com
Vishal Gupta
President and General Manager for Oxy EOR
Bravo Pipeline Company
5 Greenway Plaza Suite 110
Houston, Texas 77046
Re: CPF No. 4-2023-039-NOPV
Dear Mr. Gupta:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Mark Hamlin, Managing Counsel, Occidental Petroleum Company,
mark_hamlin@oxy.com
Mr. Bradey Holland, Lead, Plant Operations, Bravo Pipeline Company,
bradey_holland@oxy.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
________________________________________
In the Matter of )
Bravo Pipeline Company, ) CPF No. 4-2023-039-NOPV
a subsidiary of Occidental Petroleum Corp., )
)
)
)
Respondent. )
________________________________________)
FINAL ORDER
On May 11, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Bravo Pipeline
Company (Respondent). The Notice proposed finding that Respondent had violated the pipeline
safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to correct
the violation. Respondent did not contest the allegation of violation or corrective measures.
Based upon a review of all the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.452(l)(1)(ii) (Item 1) ─ Respondent failed to maintain records to
support the decisions and analyses, including any modifications, justifications,
variances, deviations, and determinations made, and actions taken, to implement and
evaluate each element integrity management program.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
September 19, 2023
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 6366
