# TARGA DOWNSTREAM LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42023044NOPV
- **title:** TARGA DOWNSTREAM LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-05-04
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.402(c)(13), 195.452(j)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023044nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023044nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023044nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42023044NOPV
**body:**

Notice of Probable Violation involving TARGA DOWNSTREAM LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(13),  195.452(j)(1). The case was opened on 2023-05-04 and is reported as closed as of 2024-08-26. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42023044NOPV_Closure Letter_08262024_(22-234487).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_Closure%20Letter_08262024_(22-234487).pdf

42023044NOPV_Closure Letter_08262024_(22-234487)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_Closure%20Letter_08262024_(22-234487)_text.pdf

42023044NOPV_Final Order_01292024_(22-234487).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_Final%20Order_01292024_(22-234487).pdf

42023044NOPV_Final Order_01292024_(22-234487)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_Final%20Order_01292024_(22-234487)_text.pdf

42023044NOPV_Operator Response to Notice_06022023_(22-234487).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_Operator%20Response%20to%20Notice_06022023_(22-234487).pdf

42023044NOPV_PCO_05042023_(22-234487).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_PCO_05042023_(22-234487).pdf

42023044NOPV_PCO_05042023_(22-234487)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023044NOPV/42023044NOPV_PCO_05042023_(22-234487)_text.pdf

42023044NOPV_Final Order_01292024_(22-234487)_text.pdf

January 29, 2024
VIA ELECTRONIC MAIL TO: cwhite@targaresources.com
G. Clark White
Executive Vice President, Operations
Targa Downstream LLC
811 Louisiana Street, Suite 2100
Houston Texas, 77002
Re: CPF 4-2023-044-NOPV
Dear Mr. White:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure (Final Order)
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Bill Grantham, Vice President of Operations, Targa Downstream LLC,
bgrantham@targaresources.com
Mr. Bryan MacKenzie, Senior Manager of Pipeline Integrity, Targa Downstream LLC,
bmackenzie@targaresources.com



Mr. Gregg Johnson, Director of Pipeline Compliance, Targa Downstream LLC,
gjohnson@targaresources.com
Ms. Julie Pabon, Senior Counsel, Targa Downstream LLC, jpabon@targaresources.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Targa Downstream LLC, ) CPF No. 4-2023-044-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From February 22 through October 17, 2022, pursuant to 49 U.S.C. § 60117, a representative of
the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an inspection of the Grand Prix and Orange NGL pipeline systems of Targa
Downstream LLC (Targa or Respondent) in Houston, Texas.
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated May 4, 2023, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding
that Targa had committed two violations of 49 C.F.R. Part 195 and proposed ordering Respondent
to take certain measures to correct the alleged violations.
Targa responded to the Notice by letter dated June 2, 2023 (Response). In its Response, Targa
contested the allegations of violation but agreed to comply with the terms of the Proposed
Compliance Order (PCO). Targa did not request a hearing and therefore has waived its right to
one.
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195 as follows:
Item 1: The Notice Alleged that Respondent violated § 195.402(a) and (c)(13), which states:
§ 195.402 Procedural manual for operations, maintenance, and
emergencies.
(a) General. Each operator shall prepare and follow for each pipeline
system a manual of written procedures for conducting normal operations and
maintenance activities and handling abnormal operations and emergencies.
This manual shall be reviewed at intervals not exceeding 15 months, but at
least once each calendar year, and appropriate changes made as necessary to
insure that the manual is effective. This manual shall be prepared before



initial operations of a pipeline system commence, and appropriate parts shall
be kept at locations where operations and maintenance activities are
conducted.
(c) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following to
provide safety during maintenance and normal operations:
(1) . . . .
(13) Periodically reviewing the work done by operator personnel to
determine the effectiveness of the procedures used in normal operation and
maintenance and taking corrective action where deficiencies are found.
The Notice alleged that Targa violated 49 C.F.R. § 195.402(a) and (c)(13) by failing to prepare
and follow a manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies, including procedures for
periodically reviewing the work done by operator personnel and taking corrective action.
Specifically, the Notice alleged that Targa failed to conduct periodic reviews of work done by
operator personnel to determine the effectiveness of the procedures used in normal operation and
maintenance and failed to take corrective action where deficiencies were found in accordance with
§ 195.402(c)(13). The Notice alleged that during the inspection, PHMSA requested records
associated with periodic reviews of the work done by operator personnel for calendar years 2020
and 2021, which Targa failed to produce.
In addition, the Notice alleged that Targa’s Hazardous Liquid OM&E – Operations &
Maintenance Manual (Aug. 13, 2010) (Liquid O&M manual) failed to include procedures for
periodically reviewing the work done by personnel to determine the effectiveness of procedures in
accordance with § 195.402(c)(13). The Notice asserted that Targa’s procedure failed to include
details on how the work done by operator personnel is reviewed to determine effectiveness of
procedures, and how the results of the reviews is documented.
In its Response, Targa stated that it disagreed with this allegation and explained that it has an
existing procedure within the Liquid O&M manual related to the requirements of
§ 195.402(c)(13), which was made available to PHMSA’s inspection team. Targa conceded that
the records necessary to demonstrate compliance were not available, as they historically have been
associated with personnel performance records, which are subject to the company’s employee
privacy requirements. Targa stated that going forward it will maintain the records of periodic
effectiveness reviews in a location that is accessible for regulatory audits. Respondent also
asserted that it took necessary measures to update the Effectiveness of Procedures section of the
Liquid O&M manual to amend roles and responsibilities, the process to address changes to
procedures used in normal operation and maintenance, and subsequent training. Targa also agreed
to comply with the PCO and would provide the revised procedures within 30 days of receipt of the
Final Order.
A review of the Notice, Targa’s Response, and the documentation in the record indicates that
Targa’s Liquid O&M manual, which was provided to the PHMSA inspector, states:
“Annually, the work of operating personnel will be reviewed through performance
reviews. If any deficiencies in the normal operating and maintenance procedures are
discovered during the performance reviews, the procedures will be updated and/or changed



to address the deficiencies. The performance reviews will also be used to review with
personnel any deficiencies in their performance in meeting the objectives of the emergency
response training.” 1
While Targa’s procedure includes language referring to the requirement at § 195.402(c)(13), the
procedure essentially restates the regulation without including details that are necessary for
implementation. For example, the procedure does not contain details regarding the specifics of
how the work done by personnel would be reviewed to determine effectiveness, including
standards for reviewing and determining when deficiencies exist that require changes. The
procedures are also silent regarding how the results would be documented.
Targa also acknowledged that it failed to make available the required records of the periodic
effectiveness reviews.2 Targa’s justification that the records were not available due to privacy
concerns is not a permissible reason for non-compliance under PHMSA’s regulations. PHMSA
guidance expressly states that the documentation requirements of § 195.402(c)(13) are required in
order to evaluate procedures.3 Targa did not contest the PCO and agreed to take the proposed
actions going forward.4
Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49
C.F.R. § 195.402(a) and (c)(13) by failing to prepare and follow a manual of written procedures
for conducting normal operations and maintenance activities and handling abnormal operations
and emergencies, including procedures for periodically reviewing the work done by operator
personnel and taking corrective action.
Item 2: The Notice Alleged that Respondent violated § 195.452(j)(1), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) . . . .
(j) What is a continual process of evaluation and assessment to maintain
a pipeline's integrity?
(1) General. After completing the baseline integrity assessment, an
operator must continue to assess the line pipe at specified intervals and
periodically evaluate the integrity of each pipeline segment that could affect
a high consequence area.
The Notice alleged that Targa violated 49 C.F.R. § 195.452(j)(1) by failing to periodically
evaluate the integrity of each pipeline segment that could affect a high consequence area (HCA).
Specifically, the Notice alleged that Targa failed to conduct a periodic evaluation for the Davis
pump station in Murray County, Oklahoma and failed to provide a process in its integrity
1 See, Exhibit A1.
2 See, Targa’s Response, at 2 (June 2, 2023).
3 See, PHMSA, Operations & Maintenance Enforcement Guidance Part 195 Subpart F, at 19 (July 21, 2017),
https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/regulatory-compliance/pipeline/enforcement/5781/o-m-
enforcement-guidance-part-195-7-21-2017.pdf.
4 See, Targa’s Response, at 2 (June 2, 2023).



management plan (IMP) to periodically evaluate the integrity of each pipeline segment that could
affect an HCA as required by §§ 195.452(j)(1) and 195.402(c)(3).
The Notice also alleged that Targa’s Integrity Management Plan for Liquids Transmission Pipelines
Section 7.1 (Apr. 1, 2020) failed to include provisions for periodic evaluations of each pipeline
segment that could affect an HCA. Instead, this section only included the assessment process for
line pipe at specified intervals but overall, failed to provide details on how the periodic evaluation
would be conducted for pump station facilities.
In its response, Targa stated that it disagreed with this allegation, claiming that the spreadsheet
provided for the Akoma to Velma segment included a risk assessment of the Davis pump station
facility. It also stated that its IMP provides that facilities are included within the overall pipeline
evaluation as Targa views the threats as “common” to the pipeline segment. Targa agreed to
comply with the PCO and stated that it is revising the IMP to separate the process of evaluating
line pipe and facilities based on relevant threat factors and adapting the risk assessment
documentation to capture it separately. Targa did not submit additional records or documentation
with its Response.
I have reviewed the Notice, Targa’s Response, and the documentation in the record, which
consists of the Arkomato-Velma segment risk analysis, performance evaluation, and Section 7.1 of
Respondent’s IMP.5 In particular, I note Section 7.1 of the IMP lists approximately 32 “attributes
about the pipeline” that Respondent must integrate with available information when conducting a
periodic evaluation to assure pipeline integrity. While the listed attributes reflect relevant
information about line pipe, they do not contain attributes specific to pump station facilities that
could affect an HCA. In addition, the risk analysis and performance evaluation records do not
otherwise indicate a periodic evaluation was performed of the Davis pump station.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49
C.F.R. § 195.452(j)(1) by failing to periodically evaluate the integrity of each pipeline segment that
could affect an HCA.
These findings of violation will be considered prior offenses in any subsequent enforcement
actions against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1 and 2 in the Notice for violations
of 49 C.F.R. §§ 195.402(a) and (c)(13) and 195.452(j)(1), respectively. Under 49 U.S.C.
§ 60118(a), each person who engages in the transportation of hazardous liquids or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601. Pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217,
Respondent is ordered to take the following actions to ensure compliance with the pipeline safety
regulations applicable to its operations:
1. With respect to the violation of § 195.402(a) and (c)(13), (Item 1), Respondent
5 Exhibits B1, B2, and B3, respectively.



must amend its procedures to include provisions for periodically reviewing the work
done by operator personnel to determine the effectiveness of the procedures used in
normal operation and maintenance and taking corrective action where deficiencies are
found within 30 days of issuance of the Final Order.
2. With respect to the violation of § 195.452(j)(1), (Item 2), Respondent must
develop a procedure in its IMP to periodically evaluate the integrity of each pipeline
segment that could affect an HCA within 30 days of issuance of the Final Order. Targa
must perform the periodic evaluation of Davis pump station facility and submit the
evaluation to the Director, Southwest Region within 60 days of issuance of the Final
Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
PHMSA requests that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies, and analyses; and (2) total cost associated with
replacements, additions, and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (see 49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The terms of
the order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
January 29, 2024
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

42023044NOPV_Closure Letter_08262024_(22-234487)_text.pdf

VIA ELECTRONIC MAIL TO: cwhite@targaresources.com
August 26, 2024
Mr. Clark White
Executive Vice President Operations
Targa Downstream LLC
811 Louisiana Street Suite 2100
Houston, Texas 77002
CPF 4-2023-044-NOPV
Dear Mr. White:
On January 29, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Targa Downstream LLC (Targa) a Final Order in the above-referenced case. This
Order included a Compliance Order. Based on our review of the documentation you provided, it
has been determined that you have complied with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
cc: Bryan J. MacKenzie, Sr. Manager Pipeline Integrity, bmackenzie@targaresources.com
Gregg Johnson, Director of Pipeline Compliance, gjohnson@targaresources.com