# ENABLE GAS TRANSMISSION, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 42023046NOA
- **title:** ENABLE GAS TRANSMISSION, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-10-18
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.515(a), 192.605(b)(1), 192.605(b)(4), 192.607(c), 192.607(f)(1), 192.607(f)(2), 192.609, 192.619(a)(1), 192.619(a)(2), 192.624(b), 192.710(b)(3), 192.712(e).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023046noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023046noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023046noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42023046NOA
**body:**

Notice of Amendment involving ENABLE GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulations as 192.515(a),  192.605(b)(1),  192.605(b)(4),  192.607(c),  192.607(f)(1),  192.607(f)(2),  192.609,  192.619(a)(1),  192.619(a)(2),  192.624(b),  192.710(b)(3),  192.712(e). The case was opened on 2023-10-18 and is reported as closed as of 2026-01-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42023046NOA_Closure Letter_01202026_(22-241127).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Closure%20Letter_01202026_(22-241127).pdf

42023046NOA_Closure Letter_01202026_(22-241127)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Closure%20Letter_01202026_(22-241127)_text.pdf

42023046NOA_Notice of Amendment_10182023_(22-241127).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Notice%20of%20Amendment_10182023_(22-241127).pdf

42023046NOA_Notice of Amendment_10182023_(22-241127)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Notice%20of%20Amendment_10182023_(22-241127)_text.pdf

42023046NOA_Operator Response to Notice_01152024_(22-241127).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Operator%20Response%20to%20Notice_01152024_(22-241127).pdf

42023046NOA_Order Directing Amendment_08292025_(22-241127).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Order%20Directing%20Amendment_08292025_(22-241127).pdf

42023046NOA_Order Directing Amendment_08292025_(22-241127)_txt.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023046NOA/42023046NOA_Order%20Directing%20Amendment_08292025_(22-241127)_txt.pdf

42023046NOA_Order Directing Amendment_08292025_(22-241127)_txt.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
August 29, 2025
VIA ELECTRONIC MAIL TO: tom.long@energytransfer.com
Thomas Long
Chief Executive Officer
Energy Transfer Company
8111 Westchester Drive
Dallas, Texas 75227
Re: CPF No. 4-2023-046-NOA
Dear Mr. Long:
Enclosed please find the Order Directing Amendment issued in the above-referenced case. It
makes findings of inadequate procedures, finds that certain amended procedures are adequate,
and requires Enable Gas Transmission, LLC, to amend certain procedures. When the
amendment of procedures has been completed, as determined by the Director, Southwest Region,
this enforcement action will be closed. Service of the Order Directing Amendment by e-mail is
effective upon the date of transmission and acknowledgement of receipt as provided under 49
CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Linda Daugherty
Acting Associate Administrator
for Pipeline Safety
Enclosure
cc: Bryan Lethcoe, Director, PHMSA Southwest Region, Office of Pipeline Safety
Heidi Murchison, Chief Counsel, Energy Transfer, LP, heidi.murchison@energytransfer.com
Todd Nardozzi, Director, Regulatory Compliance, Energy Transfer, LP,



todd.nardozzi@energytransfer.com
Susie Sjulin, Director, Regulatory Compliance, Energy Transfer, LP,
susie.sjulin@energytransfer.com
CONFIRMATION OF RECEIPT REQUESTED
2



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
In the Matter of )
Enable Gas Transmission, LLC, ) CPF No. 4-2023-046-NOA
Respondent. )
)
)
)
)
ORDER DIRECTING AMENDMENT
From September 19, 2022, to January 12, 2023, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.) inspected Enable Gas Transmission, LLC’s (Enable or
Respondent) procedures for operations and maintenance in Oklahoma City, Oklahoma.
As a result of the inspection, the Director, PHMSA Southwest Region, OPS, issued to
Respondent by letter dated October 18, 2023, a Notice of Amendment (Notice). In accordance
with 49 CFR § 190.206, the Notice alleged certain inadequacies in Respondent’s operating and
maintenance procedures and proposed that Enable amend its procedures.
Enable responded to the Notice on January 15, 2024 (Response). In its Response, Enable
submitted additional documentation and contested certain allegations in the Notice. Respondent
did not request a hearing and therefore waived its right to one.
FINDING OF INADEQUATE PROCEDURES
Item 1: The Notice alleged that Respondent’s procedures for conducting operations and
maintenance activities were inadequate to ensure safe operation of a pipeline facility in
accordance with section 192.605(b)(1). The Notice alleged specifically that Enable’s pressure
testing procedure failed to adequately detail all reasonable precautions that may be taken to
protect employees and the public during the pressure testing pursuant to section 192.515(a).
The Notice stated that Respondent’s procedure C4.0105-Pressure Testing Execution, revision
date April 1, 2022, section 4.1, Safety, failed to provide sufficient detail regarding what
constitutes a safe distance away from the testing area when performing hydrotesting. Enable’s
procedures listed a minimum distance of fifty feet, but failed to detail how much additional
distance might be necessary where the minimum distance does not suffice.
In its Response, Enable did not contest Item 1. Enable stated that it revised it procedure to



2
incorporate industry guidance and include additional language for safe distance determination.
Respondent provided a draft of the revised procedure with its response. In accordance with
section 190.209(b)(7), the Director submitted a written evaluation of the Response and a
recommendation for final action dated July 1, 2025 (hereinafter Region Recommendation),
which reviewed the draft revised procedure and determined that Enable corrected the alleged
procedural inadequacy.
Accordingly, based on a review of the evidence, I find that Respondent needs to take no further
action regarding Item 1.
Item 2: The Notice alleged that Respondent’s procedures for conducting nondestructive or
destructive tests, examinations, and assessments to verify the material properties of aboveground
line pipe and components, and of buried line pipe and components, when excavations occur were
inadequate to ensure safe operation of a pipeline facility in accordance with section 192.607(c).
Specifically, the Notice alleged that Enable’s procedure I.43 Material Verification, Rev. 1, July
1, 2021, section 7.2, Track Opportunistic Digs, failed to provide sufficient details regarding
opportunistic digs. The coordination between various work groups and the responsibilities of
each group were not discussed with adequate specificity. The Notice proposed Respondent must
revise its procedure to describe the approach used to track locations needing material
verification, the methods to acquire needed data, the communication methods used to exchange
needed and gathered information between work groups and safeguards in place to ensure
compliance with section 192.607(c).
In its Response, Enable contested the allegation. It stated that the roles of the various work
groups in the coordination of work to comply with section 192.607(c) are detailed in I.43
Material Verification, section 5.0, Governance. Respondent then listed six bullet-points detailing
specific tasks and the group responsible.
The Director reviewed Enable’s Response and the procedures cited therein and, per the Region
Recommendation, recommended ordering amendment of the procedure as proposed in the
Notice.
Having considered the record, Enable is correct that the roles of the various work groups in the
coordination of work to comply with section 192.607(c) are detailed in I.43 Material
Verification, section 5.0, Governance. However, the Notice did not allege that Respondent’s
procedures did not include the roles of the various work groups in the coordination of work to
comply with section 192.607(c). Rather, the Notice alleged that Enable’s procedures did not
adequately address the coordination between these groups – and it proposed that Respondent
revise its procedures to “describe the approach used to track locations needing material
verification, the methods to acquire needed data, the communication methods used to exchange
needed and gathered information between work groups and safeguards in place to ensure
compliance with § 192.607(c).” The listing of each work group’s role and tasks in I.43 Material
Verification, section 5.0, Governance, does not address the concerns expressed in the Notice
regarding location tracking, data acquisition, communication methods, and safeguarding. These
details are not present in Enable’s I.43 Material Verification procedure. Enable, in its Response,
did not address how its I.43 Material Verification procedure adequately addresses these concerns.



3
Accordingly, after reviewing the evidence, I find that Respondent’s procedure for conducting
nondestructive or destructive tests, examinations, and assessments to verify the material
properties of aboveground line pipe and components, and of buried line pipe and components,
when excavations occur were inadequate to ensure safe operation of a pipeline facility in
accordance with section 192.607(c). Enable is hereby ordered to revise its procedures as
specified above. Finalized procedures must be provided to the Southwest Region for review and
approval.
Item 3: The Notice alleged that Respondent’s procedures for establishing and documenting the
American National Standards Institute rating or pressure rating were inadequate to ensure safe
operation of a pipeline facility in accordance with section 192. 607(f). Specifically, the Notice
alleged that Enable’s procedure I.43 Material Verification, Rev. 1, July 1, 2021, section 7.3.3,
Components, failed to provide adequate details regarding the material verification of non-line
pipe components. The Notice stated that the procedure failed to adequately describe how Enable
will verify non-line components that cannot be isolated from mainline pipeline pressures and
methods it will use to gather needed information.
In its response, Enable contested the allegation. It stated that verification of non-line pipe
components that cannot be isolated from mainline pressure is evaluated in the same manner as
those that can be isolated from mainline pressure. Respondent stated this is detailed in its
procedure I.43 Material Verification, section 7.3.3. The Director reviewed Enable’s Response
and the procedures cited therein and, per the Region Recommendation, determined that no
further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 3.
Item 4: The Notice alleged that Enable’s procedures for conducting operations and maintenance
activities were inadequate to ensure safe operation of a pipeline facility in accordance with
section 192.605(b)(1). Specifically, the Notice stated that Respondent’s procedure B.12
Evaluating Class Location Changes (June 28, 2022), section 7.1, GIS Review, did not include
adequate detail regarding incorporating updated or new GIS data into existing class locations.
The procedure failed to adequately detail how Enable incorporated newly acquired pipeline
assets and assets with updated pipeline and structure attributes into the geographic information
system (GIS) to determine if a class location study is required under section 192.609.
In its Response, Enable stated that it revised the GIS process for management of Class location
changes and it described the new process. The Director reviewed Enable’s Response and the
revised process and, per the Region Recommendation, determined that no further procedural
revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 4.
Item 5: The Notice alleged that Respondent’s procedures for conducting operations and
maintenance activities were inadequate to ensure safe operation of a pipeline facility in



4
accordance with section 192.605(b)(1). Specifically, the Notice alleged that Enable’s procedure
B.10 Determination of MAOP, revision date February 1, 20220, Appending B, List of Hydro Test
Factors for Class Location, and Appendix C, Process Flow for Determination of MAOP, failed to
include all required information and contained errors. Appendix B failed to include column three
of Table 1 from section 192.619(a)(2)(ii) and Appendix C referenced an affidavit referred to as a
“Gold Sheet.”
In its Response, Enable stated that it revised its procedures, to include revisions to Appendices B
and C. The Director reviewed Enable’s Response and the revised procedures and, per the
Region Recommendation, determined that no further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 5.
Item 6: The Notice alleged that Enable’s procedures for reconfirming maximum alloawable
operating pressure (MAOP) were inadequate to ensure safe operation of a pipeline facility in
accordance with section 192.624(b). Specifically, the Notice alleged Enable’s procedure MAOP
Reconfirmation Plan, Revision 1 (August 26, 2022), section 2, MAOP Reconfirmation
Committee, did not include adequate detail regarding Reconfirmation Committee activities. The
procedure did not adequately describe how the committee decides on an appropriate
reconfirmation method, timing of segments, appropriate intermediate reconfirmation goals,
adjustments for acquisitions and divestitures, and record keeping for associated decision making.
In its Response, Enable contested the allegation. It asserted that it is not necessary under
section 192.624 to have the details described in the Notice. Respondent further stated that in
2023 its MAOP Reconfirmation Committee approved several changes to Enable’s MAOP
Reconfirmation Plan. It described the details of those changes. The Director reviewed Enable’s
Response and the information therein and, per the Region Recommendation, determined that no
further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 6.
Item 7: The Notice alleged that Enable’s procedures for conducting operations and maintenance
activities were inadequate to ensure safe operation of a pipeline facility in accordance with section
192.605(b)(1). Specifically, the Notice alleged that procedure 192.710 ETC Gas Plan, revision 3
(April 15, 2022), section 6.2, Periodic Reassessment, failed to include adequate detail regarding
the use and documentation of prior assessments. The procedure failed to identify who will make
the determination to use a prior assessment, the associated timelines, how this determination will
be made, and what records will be generated to document this process in accordance with section
192.710(b)(3).
In its Response, Enable did not contest the allegation and explained that it prepared redline
revisions to its procedures to include who will make the determination to use a prior assessment
as the initial assessment and how the determination will be made per section 192.710(b)(3).
Respondent provided a copy of those redlined procedures with its Response.



5
The Director, per the Region Recommendation, indicated that while the draft revised procedures
were reviewed, it could not be verified whether Enable has cured the alleged procedural
inadequacy because Respondent did not provide the finalized version of the procedure.
Accordingly, after reviewing the evidence, I find that Respondent’s procedure was inadequate to
ensure safe operation of a pipeline facility in accordance with section 192.605(b)(1). Enable is
hereby ordered to revise its procedures as specified above. Finalized procedures must be
provided to the Southwest Region for review and approval.
Item 8: The Notice alleged that Enable’s procedures for conducting operations and maintenance
activities were inadequate to ensure safe operation of a pipeline facility in accordance with
section 192.605(b)(1). Specifically, the Notice alleged that procedure D.47 Evaluation of
Remaining Strength Pipeline, revision date September 1, 2022, section 3, Applicability, did not
include adequate detail to conduct an accurate analysis of predicted failure pressure. The
procedure failed to address measurement uncertainties such as tool tolerance, detection threshold,
tool verification, and other potentially relevant data features in accordance with section
192.712(e).
In its Response, Enable contested the allegation. Respondent stated that its procedure is used
only for in situ or in-the-ditch measurements of metal loss to determine remaining strength of
the pipe. Enable noted that section 192.712(e)(1) states that an operator must account for
uncertainties in reported assessment results in identifying and characterizing the defects used in
predicted failure pressure analyses unless the defect dimensions have been verified using in situ
direct measurements. Respondent asserted that since the procedure uses in situ or in-the-ditch
measurements to determine remaining strength, uncertainties or tolerances are not required.
The Director reviewed Enable’s Response and the procedures cited therein and, per the Region
Recommendation, recommended ordering amendment of the procedure as proposed in the
Notice.
Having considered the record, Enable is correct that if defect dimensions are verified using in
situ direct measurements, uncertainties in reported assessment results in identifying and
characterizing the defects used in predicted failure pressure analyses is not required. See section
192.712(e)(1). Had Respondent’s procedures included provisions for using in-line inspection
(ILI) tools to size defects, or if evidence suggested Respondent intended to use ILI tools to size
defects, then the procedures would need to include processes for accounting for tool tolerances
and other measurement uncertainties. However, since the procedures cited in the Notice only
provide for the use of in situ measurements, provisions accounting for uncertainties in reported
assessment results are not necessary. Because Enable’s procedures only provide for in situ or in-
the-ditch measurements of metal loss to determine remaining strength of the pipe, I find the
procedures in place are not inadequate as alleged in the Notice for the currently used method.
Accordingly, after reviewing the evidence, I find that no further action is required.
Item 9: The Notice alleged that Enable’s procedures for the gathering of data needed for annual
and incident reporting under Part 191 in a timely and effective manner were inadequate to ensure
safe operation of a pipeline facility in accordance with section 192.605(b)(4). Specifically, the



6
Notice alleged procedure A.15 PHMSA-States-Incident Reporting failed to detail identifying all
Moderate Consequence Areas (MCAs). MCAs must be identified and included in the annual
and incident reporting. In addition, MCAs must be identified to comply with sections 192.624
and 192.710.
In its Response, Enable contested this allegation and asserted that its procedure is intended to
meet the requirements of Part 191, specifically sections 191.3, 191.5, and 191.15. It stated that
procedure MAOP Reconfirmation Plan and 192.710 Plan also address the requirements of
sections 192.624 and 192.710. In addition, Respondent stated that its procedures A.15 PHMSA-
States-Incident Reporting and A.16 Annual Reporting adhere to and refer to PHMSA’s reporting
instructions, which address MCAs. It further stated that procedure A.15 PHMSA-States-Incident
Reporting defines MCA. Enable provided exhibits showing this information with its Response.
The Director reviewed Enable’s Response and the information provided and, per the Region
Recommendation, determined that no further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 9.
Under 49 CFR section 190.243, Respondent may submit a Petition for Reconsideration of this
Final Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC, 20590. The written petition must
contain a statement of the issue(s) and meet all other requirements of 49 CFR § 190.243. The
terms of the Order remain in effect until the Associate Administrator, upon request, grants a stay.
The terms and conditions of this Order are effective upon service in accordance with 49 CFR §
190.5.
Respondent must amend its procedures, as required above, and submit them to the Director,
PHMSA Southwest Region, OPS, within 30 days following receipt of this Order. The Director
may grant an extension of time to comply with any of the required items upon a written request
timely submitted by the Respondent and demonstrating good cause for an extension. Failure to
comply with this Order may result in administrative assessment of civil penalties exceeding
$200,000, as adjusted for inflation (see 49 CFR § 190.223 for adjusted amounts), for each
violation for each day the violation continues or in referral to the Attorney General for
appropriate relief in a district court of the United States.
Linda Daugherty Date Issued
Acting Associate Administrator
for Pipeline Safety

42023046NOA_Order Directing Amendment_08292025_(22-241127).pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
August 29, 2025
VIA ELECTRONIC MAIL TO: tom.long@energytransfer.com
Thomas Long
Chief Executive Officer
Energy Transfer Company
8111 Westchester Drive
Dallas, Texas 75227
Re: CPF No. 4-2023-046-NOA
Dear Mr. Long:
Enclosed please find the Order Directing Amendment issued in the above-referenced case. It
makes findings of inadequate procedures, finds that certain amended procedures are adequate,
and requires Enable Gas Transmission, LLC, to amend certain procedures. When the
amendment of procedures has been completed, as determined by the Director, Southwest Region,
this enforcement action will be closed. Service of the Order Directing Amendment by e-mail is
effective upon the date of transmission and acknowledgement of receipt as provided under 49
CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
LINDA GAIL
DAUGHERTY
Digitally signed by LINDA
GAIL DAUGHERTY
Date: 2025.08.28
19:06:53 -04'00'
Linda Daugherty
Acting Associate Administrator
for Pipeline Safety
Enclosure
cc: Bryan Lethcoe, Director, PHMSA Southwest Region, Office of Pipeline Safety
Heidi Murchison, Chief Counsel, Energy Transfer, LP, heidi.murchison@energytransfer.com
Todd Nardozzi, Director, Regulatory Compliance, Energy Transfer, LP,



todd.nardozzi@energytransfer.com
Susie Sjulin, Director, Regulatory Compliance, Energy Transfer, LP,
susie.sjulin@energytransfer.com
CONFIRMATION OF RECEIPT REQUESTED
2



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Enable Gas Transmission, LLC, ) CPF No. 4-2023-046-NOA
)
)
)
Respondent. )
____________________________________)
ORDER DIRECTING AMENDMENT
From September 19, 2022, to January 12, 2023, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.) inspected Enable Gas Transmission, LLC’s (Enable or
Respondent) procedures for operations and maintenance in Oklahoma City, Oklahoma.
As a result of the inspection, the Director, PHMSA Southwest Region, OPS, issued to
Respondent by letter dated October 18, 2023, a Notice of Amendment (Notice). In accordance
with 49 CFR § 190.206, the Notice alleged certain inadequacies in Respondent’s operating and
maintenance procedures and proposed that Enable amend its procedures.
Enable responded to the Notice on January 15, 2024 (Response). In its Response, Enable
submitted additional documentation and contested certain allegations in the Notice. Respondent
did not request a hearing and therefore waived its right to one.
FINDING OF INADEQUATE PROCEDURES
Item 1: The Notice alleged that Respondent’s procedures for conducting operations and
maintenance activities were inadequate to ensure safe operation of a pipeline facility in
accordance with VHFWLRQ 192.605(b)(1). The Notice alleged specifically that Enable’s pressure
testing procedure failed to adequately detail all reasonable precautions that may be taken to
protect employees and the public during the pressure testing pursuant to VHFWLRQ 192.515(a).
The Notice stated that Respondent’s procedure C4.0105-Pressure Testing Execution, revision
date April 1, 2022, section 4.1, Safety, failed to provide sufficient detail regarding what
constitutes a safe distance away from the testing area when performing hydrotesting. Enable’s
procedures listed a minimum distance of fifty feet, but failed to detail how much additional
distance might be necessary where the minimum distance does not suffice.
In its Response, Enable did not contest Item 1. Enable stated that it revised it procedure to



2
incorporate industry guidance and include additional language for safe distance determination.
Respondent provided a draft of the revised procedure with its response. In accordance with
VHFWLRQ 190.209(b)(7), the Director submitted a written evaluation of the Response and a
recommendation for final action dated July 1, 2025 (hereinafter Region Recommendation),
which reviewed the draft revised procedure and determined that Enable corrected the alleged
procedural inadequacy.
Accordingly, based on a review of the evidence, I find that Respondent needs to take no further
action regarding Item 1.
Item 2: The Notice alleged that Respondent’s procedures for conducting nondestructive or
destructive tests, examinations, and assessments to verify the material properties of aboveground
line pipe and components, and of buried line pipe and components, when excavations occur were
inadequate to ensure safe operation of a pipeline facility in accordance with VHFWLRQ 192.607(c).
Specifically, the Notice alleged that Enable’s procedure I.43 Material Verification, Rev. 1, July
1, 2021, section 7.2, Track Opportunistic Digs, failed to provide sufficient details regarding
opportunistic digs. The coordination between various work groups and the responsibilities of
each group were not discussed with adequate specificity. The Notice proposed Respondent must
revise its procedure to describe the approach used to track locations needing material
verification, the methods to acquire needed data, the communication methods used to exchange
needed and gathered information between work groups and safeguards in place to ensure
compliance with VHFWLRQ 192.607(c).
In its Response, Enable contested the allegation. It stated that the roles of the various work
groups in the coordination of work to comply with VHFWLRQ 192.607(c) are detailed in I.43
Material Verification, section 5.0, Governance. Respondent then listed six bullet-points detailing
specific tasks and the group responsible.
The Director reviewed Enable’s Response and the procedures cited therein and, per the Region
Recommendation, recommended ordering amendment of the procedure as proposed in the
Notice.
Having considered the record, Enable is correct that the roles of the various work groups in the
coordination of work to comply with VHFWLRQ 192.607(c) are detailed in I.43 Material
Verification, section 5.0, Governance. However, the Notice did not allege that Respondent’s
procedures did not include the roles of the various work groups in the coordination of work to
comply with VHFWLRQ 192.607(c). Rather, the Notice alleged that Enable’s procedures did not
adequately address the coordination between these groups – and it proposed that Respondent
revise its procedures to “describe the approach used to track locations needing material
verification, the methods to acquire needed data, the communication methods used to exchange
needed and gathered information between work groups and safeguards in place to ensure
compliance with  192.607(c).” The listing of each work group’s role and tasks in I.43 Material
Verification, section 5.0, Governance, does not address the concerns expressed in the Notice
regarding location tracking, data acquisition, communication methods, and safeguarding. These
details are not present in Enable’s I.43 Material Verification procedure. Enable, in its Response,
did not address how its I.43 Material Verification procedure adequately addresses these concerns.



3
Accordingly, after reviewing the evidence, I find that Respondent’s procedure for conducting
nondestructive or destructive tests, examinations, and assessments to verify the material
properties of aboveground line pipe and components, and of buried line pipe and components,
when excavations occur were inadequate to ensure safe operation of a pipeline facility in
accordance with VHFWLRQ 192.607(c). Enable is hereby ordered to revise its procedures as
specified above. Finalized procedures must be provided to the Southwest Region for review and
approval.
Item 3: The Notice alleged that Respondent’s procedures for establishing and documenting the
$PHULFDQ 1DWLRQDO 6WDQGDUGV ,QVWLWXWH rating or pressure rating were inadequate to ensure safe
operation of a pipeline facility in accordance with VHFWLRQ 192. 607(f). Specifically, the Notice
alleged that Enable’s procedure I.43 Material Verification, Rev. 1, July 1, 2021, section 7.3.3,
Components, failed to provide adequate details regarding the material verification of non-line
pipe components. The Notice stated that the procedure failed to adequately describe how Enable
will verify non-line components that cannot be isolated from mainline pipeline pressures and
methods it will use to gather needed information.
In its response, Enable contested the allegation. It stated that verification of non-line pipe
components that cannot be isolated from mainline pressure is evaluated in the same manner as
those that can be isolated from mainline pressure. Respondent stated this is detailed in its
procedure I.43 Material Verification, section 7.3.3. The Director reviewed Enable’s Response
and the procedures cited therein and, per the Region Recommendation, determined that no
further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 3.
Item 4: The Notice alleged that Enable’s procedures for conducting operations and maintenance
activities were inadequate to ensure safe operation of a pipeline facility in accordance with
VHFWLRQ 192.605(b)(1). Specifically, the Notice stated that Respondent’s procedure B.12
Evaluating Class Location Changes (June 28, 2022), section 7.1, GIS Review, did not include
adequate detail regarding incorporating updated or new GIS data into existing class locations.
The procedure failed to adequately detail how Enable incorporated newly acquired pipeline
assets and assets with updated pipeline and structure attributes into the JHRJUDSKLF LQIRUPDWLRQ
V\VWHP GIS to determine if a class location study is required under VHFWLRQ 192.609.
In its Response, Enable stated that it revised the GIS process for management of Class location
changes and it described the new process. The Director reviewed Enable’s Response and the
revised process and, per the Region Recommendation, determined that no further procedural
revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 4.
Item 5: The Notice alleged that Respondent’s procedures for conducting operations and
maintenance activities were inadequate to ensure safe operation of a pipeline facility in



4
accordance with VHFWLRQ 192.605(b)(1). Specifically, the Notice alleged that Enable’s procedure
B.10 Determination of MAOP, revision date February 1, 20220, Appending B, List of Hydro Test
Factors for Class Location, and Appendix C, Process Flow for Determination of MAOP, failed to
include all required information and contained errors. Appendix B failed to include column three
of Table 1 from VHFWLRQ 192.619(a)(2)(ii) and Appendix C referenced an affidavit referred to as a
“Gold Sheet.”
In its Response, Enable stated that it revised its procedures, to include revisions to Appendices B
and C. The Director reviewed Enable’s Response and the revised procedures and, per the
Region Recommendation, determined that no further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 5.
Item 6: The Notice alleged that Enable’s procedures for reconfirming PD[LPXP DOORDZDEOH
RSHUDWLQJ SUHVVXUH MAOP were inadequate to ensure safe operation of a pipeline facility in
accordance with VHFWLRQ 192.624(b). Specifically, the Notice alleged Enable’s procedure MAOP
Reconfirmation Plan, Revision 1 (August 26, 2022), section 2, MAOP Reconfirmation
Committee, did not include adequate detail regarding Reconfirmation Committee activities. The
procedure did not adequately describe how the committee decides on an appropriate
reconfirmation method, timing of segments, appropriate intermediate reconfirmation goals,
adjustments for acquisitions and divestitures, and record keeping for associated decision making.
In its Response, Enable contested the allegation. It asserted that it is not necessary under
VHFWLRQ 192.624 to have the details described in the Notice. Respondent further stated that in
2023 its MAOP Reconfirmation Committee approved several changes to Enable’s MAOP
Reconfirmation Plan. It described the details of those changes. The Director reviewed Enable’s
Response and the information therein and, per the Region Recommendation, determined that no
further procedural revisions are necessary.
Accordingly, after reviewing the evidence, I find that Respondent needs to take no further action
regarding Item 6.
Item 7: The Notice alleged that Enable’s procedures for conducting operations and maintenance
activities were inadequate to ensure safe operation of a pipeline facility in accordance with VHFWLRQ
192.605(b)(1). Specifically, the Notice alleged that procedure 192.710 ETC Gas Plan, revision 3
(April 15, 2022), section 6.2, Periodic Reassessment, failed to include adequate detail regarding
the use and documentation of prior assessments. The procedure failed to identify who will make
the determination to use a prior assessment, the associated timelines, how this determination will
be made, and what records will be generated to document this process in accordance with VHFWLRQ
192.710(b)(3).
In its Response, Enable did not contest the allegation and explained that it prepared redline
revisions to its procedures to include who will make the determination to use a prior assessment
as the initial assessment and how the determination will be made per VHFWLRQ 192.710(b)(3).
Respondent provided a copy of those redlined procedures with its Response.



5
The Director, per the Region Recommendation, indicated that while the draft revised procedures
were reviewed, it could not be verified whether Enable has cured the alleged procedural
inadequacy because Respondent did not provide the finalized version of the procedure.
Accordingly, after reviewing the evidence, I find that Respondent’s procedure was inadequate to
ensure safe operation of a pipeline facility in accordance with VHFWLRQ 192.605(b)(1). Enable is
hereby ordered to revise its procedures as specified above. Finalized procedures must be
provided to the Southwest Region for review and approval.
Item 8: The Notice alleged that Enable’s procedures for conducting operations and maintenance
activities were inadequate to ensure safe operation of a pipeline facility in accordance with
VHFWLRQ 192.605(b)(1). Specifically, the Notice alleged that procedure D.47 Evaluation of
Remaining Strength Pipeline, revision date September 1, 2022, section 3, Applicability, did not
include adequate detail to conduct an accurate analysis of predicted failure pressure. The
procedure failed to address measurement uncertainties such as tool tolerance, detection threshold,
tool verification, and other potentially relevant data features in accordance with VHFWLRQ
192.712(e).
In its Response, Enable contested the allegation. Respondent stated that its procedure is used
only for in situ or in-the-ditch measurements of metal loss to determine remaining strength of
the pipe. Enable noted that VHFWLRQ 192.712(e)(1) states that an operator must account for
uncertainties in reported assessment results in identifying and characterizing the defects used in
predicted failure pressure analyses unless the defect dimensions have been verified using in situ
direct measurements. Respondent asserted that since the procedure uses in situ or in-the-ditch
measurements to determine remaining strength, uncertainties or tolerances are not required.
The Director reviewed Enable’s Response and the procedures cited therein and, per the Region
Recommendation, recommended ordering amendment of the procedure as proposed in the
Notice.
Having considered the record, Enable is correct that if defect dimensions are verified using in
situ direct measurements, uncertainties in reported assessment results in identifying and
characterizing the defects used in predicted failure pressure analyses is not required. See VHFWLRQ
192.712(e)(1). Had Respondent’s procedures included provisions for using LQOLQH LQVSHFWLRQ
ILI tools to size defects, or if evidence suggested Respondent intended to use ILI tools to size
defects, then the procedures would need to include processes for accounting for tool tolerances
and other measurement uncertainties. However, since the procedures cited in the Notice only
provide for the use of in situ measurements, provisions accounting for uncertainties in reported
assessment results are not necessary. Because Enable’s procedures only provide for in situ or in-
the-ditch measurements of metal loss to determine remaining strength of the pipe, I find the
procedures in place are not inadequate as alleged in the Notice for the currently used method.
Accordingly, after reviewing the evidence, I find that no further action is required.
Item 9: The Notice alleged that Enable’s procedures for the gathering of data needed for annual
and incident reporting under Part 191 in a timely and effective manner were inadequate to ensure
safe operation of a pipeline facility in accordance with VHFWLRQ 192.605(b)(4). Specifically, the



6
1RWLFH alleged procedure A.15 PHMSA-States-Incident Reporting failed to detail identifying all
Moderate Consequence Areas (MCAs). MCAs must be identified and included in the annual
and incident reporting. In addition, MCAs must be identified to comply with VHFWLRQV 192.624
and 192.710.
In its Response, Enable contested this allegation and asserted that its procedure is intended to
meet the requirements of Part 191, specifically VHFWLRQV 191.3, 191.5, and 191.15. It stated that
procedure MAOP Reconfirmation Plan and 192.710 Plan also address the requirements of
VHFWLRQV 192.624 and 192.710. In addition, Respondent stated that its procedures A.15 PHMSA-
States-Incident Reporting and A.16 Annual Reporting adhere to and refer to PHMSA’s reporting
instructions, which address MCAs. It further stated that procedure A.15 PHMSA-States-Incident
Reporting defines MCA. Enable p
- **truncated:** true
- **body characters:** 71878