# PANHANDLE EASTERN PIPELINE CO — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42023052NOPV
- **title:** PANHANDLE EASTERN PIPELINE CO — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-10-16
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.605(a), 192.731(b), 192.905(a), 192.905(b)(1), 192.907(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023052nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023052nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023052nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42023052NOPV
**body:**

Notice of Probable Violation involving PANHANDLE EASTERN PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 192.605(a),  192.731(b),  192.905(a),  192.905(b)(1),  192.907(a). The case was opened on 2023-10-16 and is reported as closed as of 2025-12-29. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42023052NOPV_ Final Order_12292025_(22-235649).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023052NOPV/42023052NOPV_%20Final%20Order_12292025_(22-235649).pdf

42023052NOPV_ Final Order_12292025_(22-235649)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023052NOPV/42023052NOPV_%20Final%20Order_12292025_(22-235649)_text.pdf

42023052NOPV_Operator Response to Notice_01152024_(22-235649).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023052NOPV/42023052NOPV_Operator%20Response%20to%20Notice_01152024_(22-235649).pdf

42023052NOPV_PCO_10162023_(22-235649).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023052NOPV/42023052NOPV_PCO_10162023_(22-235649).pdf

42023052NOPV_PCO_10162023_(22-235649)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023052NOPV/42023052NOPV_PCO_10162023_(22-235649)_text.pdf

42023052NOPV_ Final Order_12292025_(22-235649)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
December 29, 2025
VIA ELECTRONIC MAIL TO: tom.long@energytransfer.com
Thomas Long
Chief Executive Officer
Energy Transfer Company
8111 Westchester Drive
Dallas, Texas 75225
Re: CPF No. 4-2023-052-NOPV
Dear Mr. Long:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws one of the
allegations of violation, makes other findings of violation, and finds that Panhandle Eastern
Pipeline Company has completed the actions specified in the Notice to comply with the pipeline
safety regulations. Therefore, this case is now closed. Service of the Final Order by e-mail is
effective upon the date of transmission and acknowledgement of receipt as provided under 49
CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Linda Daugherty
Acting Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Greg McIlwain, Executive Vice President of Operations, Energy Transfer, LP,
gregory.mcilwain@energytransfer.com
Mr. Eric Amundsen, Senior Vice President of Operations, Energy Transfer, LP,
eric.amundsen@energytransfer.com
Ms. Heidi Murchison, Chief Counsel, Energy Transfer, LP,
heidi.murchison@energytransfer.com
Mr. Leif Jensen, Vice President of Tech Services, Energy Transfer, LP,



2
leif.jensen@energytransfer.com
Ms. Susie Sjulin, Director, Regulatory Compliance, Energy Transfer, LP,
susie.sjulin@energytransfer.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Panhandle Eastern Pipeline Company, )
a subsidiary of Energy Transfer Co., ) CPF No. 4-2023-052-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From February 28 through June 24, 2022, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of Panhandle
Eastern Pipeline Company (PEPL or Respondent) in Missouri, Kansas, Oklahoma, and Texas.
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated October 16, 2023, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 CFR § 190.207, the Notice proposed finding
that PEPL had committed three violations of 49 CFR Part 192 and proposed ordering
Respondent to take certain measures to correct the alleged violations.
PEPL responded to the Notice by letter dated January 15, 2024 (Response). Respondent
contested one of the allegations and offered additional information in response to the Notice.
Respondent did not request a hearing and therefore has waived its right to one.
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 CFR Part 192 as follows:
Item 1: The Notice alleged that Respondent violated 49 CFR § 192.605(a), which states:
§ 192.605 Procedural manual for operations, maintenance, and
emergencies.
(a) General. Each operator shall prepare and follow for each pipeline, a
manual of written procedures for conducting operations and maintenance



2
activities and for emergency response. For transmission lines, the manual
must also include procedures for handling abnormal operations. This
manual must be reviewed and updated by the operator at intervals not
exceeding 15 months, but at least once each calendar year. This manual
must be prepared before operations of a pipeline system commence.
Appropriate parts of the manual must be kept at locations where operations
and maintenance activities are conducted.
The Notice alleged that Respondent violated 49 CFR § 192.605(a) by failing to follow its manual
of written procedures and promptly repair or replace defective or inadequate equipment in
accordance with section 192.731(b)1 and section 4.0 of its Standard Operating Procedure (SOP),
Relief Valves Testing Inspection and Maintenance: M.05 (dated June 28, 2022). Specifically, the
Notice alleged that PEPL failed to promptly repair or replace relief valve 5RV-3S, used for
secondary overpressure protection at the Olpe Compressor, which drifted above the set point four
times since 2017.
In its Response, PEPL contested Item 1. PEPL argued that annual inspections are done to ensure
the device is set properly and to adjust or repair the device as needed. PEPL stated that annual
maintenance and checks allow the operator to adjust the setpoint if there is a plus or minus drift.
PEPL stated that minor fluctuations in setpoint are to be expected for a mechanical device and
that every time valve 5RV-3S was found to have drifted it was reset. PEPL stated that relief
valve 5RV-3S was replaced in October 2019. Finally, PEPL argued that it had adhered to the
requirements of its SOP as demonstrated by the timely performance and adjustment, as needed,
of the relief device during testing and inspections.
The facts in the record show that Respondent installed the subject relief valve in 2019. The
setpoint of the valve, or the pressure at which the valve starts to relieve, was set at 809 psig.
Photographs show this setpoint value stamped on the body of the valve. Respondent performed a
routine inspection of the valve in 2020 and determined the setpoint had drifted to 832 psig, or
approximately 2.8 percent above the initial value. Respondent reset the setpoint to 809 psig. At
the next annual inspection in 2021, the setpoint was found to be 814 psig, or roughly 0.6 percent
above the original value and was reset. In 2022, Respondent inspected the relief valve during the
PHMSA inspection in May and determined the setpoint was at 813 psig, or 0.5 percent above the
original value. Respondent reset the setpoint and inspected the relief valve again in August and
December 2022, finding the setpoint at 808 psig and 809 psig, representing differences of 0.1
percent and 0.0 percent, respectively.
The Notice alleged the drifting of the setpoint that occurred between 2020 and 2022 proved the
relief valve was defective or inadequate, requiring Respondent to repair or replace the valve.2
This allegation appears to be based on an implied assertion that the relief valve must be defective
or inadequate whenever the setpoint is found to have drifted. The record in this case, however,
does not prove such an inference was necessarily the case. Respondent noted that “minor
fluctuations . . . are typical for such a mechanical device.” In addition, the record is absent any
1 Section 192.731(b) states: “Any defective or inadequate equipment found must be promptly repaired or replaced.”
2 The Notice also referenced drifting in 2018, but that was a different valve than the one installed in 2019.



3
authoritative source upon which a conclusion must be drawn that the drift identified, which was
as little as one-half of one percent (or less), could not be within the acceptable tolerance of the
device at issue.
3 Without additional evidentiary support to show Respondent was required to
follow its procedures to repair or replace the valve, the allegation of violation fails.
Accordingly, after considering all of the evidence, the alleged violation of 49 CFR § 192.605(a)
is hereby withdrawn. This withdrawal does not preclude PHMSA from determining, based on a
finding of sufficient evidence, that a relief valve with set point drift is defective or inadequate in
a future case. Likewise, this withdrawal does not remove any obligation an operator may have to
account for set point drift in its inspection and operating procedures to ensure pressure on a
pipeline does not exceed prescribed limits
Item 2: The Notice alleged that Respondent violated 49 CFR § 192.905(a), which states:
§ 192.905 How does an operator identify a high consequence area?
(a) General. To determine which segments of an operator’s transmission
pipeline system are covered by this subpart, an operator must identify the
high consequence areas. An operator must use method (1) or (2) from the
definition in § 192.903 to identify a high consequence area. An operator
may apply one method to its entire pipeline system, or an operator may
apply one method to individual portions of the pipeline system. An operator
must describe in its integrity management program which method it is
applying to each portion of the operator’s pipeline system. The description
must include the potential impact radius when utilized to establish a high
consequence area. (See appendix E.I. for guidance on identifying high
consequence areas.)
(b)(1) Identified sites. An operator must identify an identified site, for
purposes of this subpart, from information the operator has obtained from
routine operation and maintenance activities and from public officials with
safety or emergency response or planning responsibilities who indicate to
the operator that they know of locations that meet the identified site criteria.
These public officials could include officials on a local emergency planning
commission or relevant Native American tribal officials.
The Notice alleged that Respondent violated 49 CFR § 192.905(a) by failing to identify a high
3 In Explorer Pipeline Company, Order Directing Amendment, CPF No. 3-2013-5010M, 2015 WL 4882526, at *3
(July 9, 2015), PHMSA determined an operator’s written procedures were inadequate because they did not require
recording the “as-found” and “as-left” setpoints when inspecting overpressure safety devices. In the decision,
PHMSA explained the importance of recording these values, noting among other things that “operators must be able
to detect if the set point for an overpressure safety device is drifting because if that was occurring, the device would
not be functioning properly.” It is important to recognize the statement in Explorer about drifting was not essential
to the finding of inadequate procedures in that case. While drifting of a setpoint could be an indication that a
mechanical relief valve is defective, the question of whether a small degree of drift might be within the acceptable
tolerance of a particular device was neither raised nor adjudicated in Explorer. Therefore, Explorer is not
authoritative on this question for purposes of the present case.



4
consequence area in order to determine which segments of the operator’s transmission pipeline
system are covered by subpart O. Specifically, the Notice alleged that PEPL failed to identify a
child development center adjacent to the Jefferson City pipeline right-of-way, and within its
potential impact radius (PIR), as an “identified site” in accordance with section 192.905(b)(1).
In its Response, PEPL did not contest Item 2. PEPL submitted records to demonstrate the center
is now identified as a high consequence area in its integrity management program, as of April 29,
2022.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 192.905(a) by failing to identify a high consequence area in order to determine which segments
of the operator’s transmission pipeline system are covered by subpart O.
Item 3: The Notice alleged that Respondent violated 49 CFR § 192.907(a), which states:
§ 192.907 What must an operator do to implement this subpart?
(a) General. No later than December 17, 2004, an operator of a covered
pipeline segment must develop and follow a written integrity management
program that contains all the elements described in § 192.911 and that
addresses the risks on each covered transmission pipeline segment. The
initial integrity management program must consist, at a minimum, of a
framework that describes the process for implementing each program
element, how relevant decisions will be made and by whom, a time line for
completing the work to implement the program element, and how
information gained from experience will be continuously incorporated into
the program. The framework will evolve into a more detailed and
comprehensive program. An operator must make continual improvements
to the program.
The Notice alleged that Respondent violated 49 CFR § 192.907(a) by failing to follow its written
integrity management program. Specifically, the Notice alleged that PEPL failed to conduct a
preventive and mitigative (P&M) measure study for three pipeline segments in accordance with
section 9 of its Pipeline Integrity Management Plan (Rev. 12; April 1, 2021).
In its Response, PEPL did not contest Item 3. PEPL submitted reports to demonstrate it had
completed preventative and mitigative measures between October 2022 and December 2023.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 CFR
§ 192.907(a) by failing to follow its written integrity management program.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER



5
The Notice proposed a compliance order with respect to Items 1, 2, and 3 in the Notice for
violations of 49 CFR §§ 192.605(a), 192.905(a), and 192.907(a), respectively. Under 49 U.S.C.
§ 60118(a), each person who engages in the transportation of gas or who owns or operates a
pipeline facility is required to comply with the applicable safety standards established under
chapter 601.
As discussed above, Item 1 has been withdrawn. Therefore, the compliance terms proposed in
the Notice for that Item are not included in this Order.
With regard to the violation of section 192.905(a) (Item 2), the Director has indicated that
PEPL satisfied the proposed compliance terms associated with Item 2.
With regard to the violation of section 192.907(a) (Item 3), the Director has indicated that PEPL
satisfied the proposed compliance terms associated with Item 3.
Accordingly, I find that compliance has been achieved with respect to these violations.
Therefore, the compliance terms proposed in the Notice for Items 2 and 3 are not included in this
Order.
The terms and conditions of this Final Order are effective upon service in accordance with 49
CFR § 190.5.
___________________________________ __________________________
Linda Daugherty Date Issued
Acting Associate Administrator
for Pipeline Safety