# NAVIGATOR BORGER EXPRESS LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42023053NOPV
- **title:** NAVIGATOR BORGER EXPRESS LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-06-13
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.202.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023053nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023053nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42023053nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42023053NOPV
**body:**

Notice of Probable Violation involving NAVIGATOR BORGER EXPRESS LLC. PHMSA's enforcement data identifies the cited regulation as 195.202. The case was opened on 2023-06-13 and is reported as closed as of 2023-12-04. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42023053NOPV_Closure Letter_12042023_(21-227138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_Closure%20Letter_12042023_(21-227138).pdf

42023053NOPV_Closure Letter_12042023_(21-227138)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_Closure%20Letter_12042023_(21-227138)_text.pdf

42023053NOPV_Final Order_09272023_(21-227138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_Final%20Order_09272023_(21-227138).pdf

42023053NOPV_Final Order_09272023_(21-227138)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_Final%20Order_09272023_(21-227138)_text.pdf

42023053NOPV_Operator Response to Notice_07122023_(21-227138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_Operator%20Response%20to%20Notice_07122023_(21-227138).pdf

42023053NOPV_PCO_06132023_(21-227138).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_PCO_06132023_(21-227138).pdf

42023053NOPV_PCO_06132023_(21-227138)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42023053NOPV/42023053NOPV_PCO_06132023_(21-227138)_text.pdf

42023053NOPV_Closure Letter_12042023_(21-227138)_text.pdf

VIA ELECTRONIC MAIL TO: vrosa@nesmidstream.com
December 4, 2023
Vidal Rosa
Senior Vice President of Operations
Navigator Borger Express, LLC
2626 Cole Avenue, Suite 900,
Dallas, Texas 75204
CPF 4-2023-053-NOPV
Dear Mr. Rosa:
On September 27, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Navigator Borger Express, LLC (Navigator) a Final Order (Order) in the above-
referenced case. This Order included a Compliance Order. Based on PHMSA’s review of the
documentation provided on July 12 and 27, 2023, it has been determined that you have complied
with the terms of this order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Ms. Vanessa Romero, Manager EHS/Regulatory, vromero@nesmidstream.com

42023053NOPV_Final Order_09272023_(21-227138)_text.pdf

September 27, 2023
VIA ELECTRONIC MAIL TO: vrosa@nesmidstream.com
Vidal Rosa
Senior Vice President, Operations
Navigator Borger Express LLC
2626 Cole Avenue, Suite 900
Dallas, Texas 75204
Re: CPF No. 4-2023-053-NOPV
Dear Mr. Rosa:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Ms. Vanessa Romero, Manager, EHS/Regulatory, Navigator Borger Express LLC,
vromero@nesmidstream.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Navigator Borger Express LLC, ) CPF No. 4-2023-053-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On June 13, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Navigator Borger
Express LLC (Respondent). The Notice proposed finding that Respondent had violated the
pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to
correct the violation. Respondent did not contest the allegations of violation or corrective
measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.202 (Item 1) ─ Respondent failed to construct each pipeline system in
accordance with comprehensive written specifications or standards that are consistent
with the requirements of Part 195.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
September 27, 2023
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety