# ROSEFIELD OPERATING COMPANY, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42024014NOPV
- **title:** ROSEFIELD OPERATING COMPANY, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-01-30
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.452(j)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42024014nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42024014nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42024014nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42024014NOPV
**body:**

Notice of Probable Violation involving ROSEFIELD OPERATING COMPANY, LLC. PHMSA's enforcement data identifies the cited regulation as 195.452(j)(3). The case was opened on 2024-01-30 and is reported as closed as of 2025-03-21. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42024014NOPV_Closure Letter_03212025_(21-217155).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_Closure%20Letter_03212025_(21-217155).pdf

42024014NOPV_Closure Letter_03212025_(21-217155)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_Closure%20Letter_03212025_(21-217155)_text.pdf

42024014NOPV_Final Order_04112024_(21-217155).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_Final%20Order_04112024_(21-217155).pdf

42024014NOPV_Final Order_04112024_(21-217155)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_Final%20Order_04112024_(21-217155)_text.pdf

42024014NOPV_Operator Response to Notice_02272024_(21-217155).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_Operator%20Response%20to%20Notice_02272024_(21-217155).pdf

42024014NOPV_PCO_01302024_(21-217155).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_PCO_01302024_(21-217155).pdf

42024014NOPV_PCO_01302024_(21-217155)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024014NOPV/42024014NOPV_PCO_01302024_(21-217155)_text.pdf

42024014NOPV_Final Order_04112024_(21-217155)_text.pdf

April 11, 2024
VIA ELECTRONIC MAIL TO: caps@rosefieldpipeline.com
Christopher Capsimalis
Chief Executive Officer
Rosefield Operating Company, LLC
2103 Research Forest
Suite 300
The Woodlands, Texas 77380
Re: CPF No. 4-2024-014-NOPV
Dear Mr. Capsimalis:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Garrett Parker, Regulatory Specialist, Rosefield Operating Company, LLC,
gparker@rosefieldpipeline.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Rosefield Operating Company, LLC, ) CPF No. 4-2024-014-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On January 30, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Rosefield Operating
Company, LLC (Respondent). The Notice proposed finding that Respondent had violated the
pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to
correct the violation. Respondent did not contest the allegations of violation or corrective
measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.452(j)(3) (Item 1) ─ Respondent failed to continually assess the
line pipe’s integrity within a five-year interval, not to exceed 68 months.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
April 11, 2024
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

42024014NOPV_Closure Letter_03212025_(21-217155)_text.pdf

VIA ELECTRONIC MAIL TO: caps@rosefieldpipeline.com
March 21, 2025
Christopher Capsimalis
Chief Executive Officer
Rosefield Operating Company, LLC
2103 Research Forest
Suite 300
The Woodlands, Texas 77380
RE: CPF 4-2024-014-NOPV
Dear Mr. Capsimalis:
From July 11, 2021 to November 27, 2023, a representative of the Office of Pipeline Safety
(OPS), Southwest Region, pursuant to Chapter 601 of 49 United States Code (U.S.C.), reviewed
and inspected an Integrity Assurance notification submitted on June 30, 2021, by Rosefield
Operating Company, LLC (Rosefield), regarding its High Island Pipeline System that transports
crude oil from offshore locations to Texas City, Texas. As a result of the inspection, Rosefield
was issued a Final Order (Order) in the above-referenced case. This Order included a Compliance
Order.
Based on PHMSA’s review of the documentation Rosefield provided, it has been determined that
Rosefield has complied with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Garrett Parker, Regulatory Specialist, Rosefield Operating Company, LLC