# CHENIERE CREOLE TRAIL PIPELINE, L.P. — Notice of Amendment

- **operation:** document
- **citation:** CPF 42024023NOA
- **title:** CHENIERE CREOLE TRAIL PIPELINE, L.P. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-03-20
- **effective on:** Not available
- **summary:** CLOSED notice of amendment.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42024023noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42024023noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42024023noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42024023NOA
**body:**

Notice of Amendment involving CHENIERE CREOLE TRAIL PIPELINE, L.P.. PHMSA's enforcement data identifies the cited regulation as 60108(a)(1),  60108(a)(2)(E). The case was opened on 2024-03-20 and is reported as closed as of 2024-08-26. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42024023NOA_Closure Letter_08262024_(23-264818).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024023NOA/42024023NOA_Closure%20Letter_08262024_(23-264818).pdf

42024023NOA_Closure Letter_08262024_(23-264818)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024023NOA/42024023NOA_Closure%20Letter_08262024_(23-264818)_text.pdf

42024023NOA_Notice of Amendment_03202024_(23-264818).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024023NOA/42024023NOA_Notice%20of%20Amendment_03202024_(23-264818).pdf

42024023NOA_Notice of Amendment_03202024_(23-264818)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024023NOA/42024023NOA_Notice%20of%20Amendment_03202024_(23-264818)_text.pdf

42024023NOA_Operator Response to Notice_04162024_(23-264818).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024023NOA/42024023NOA_Operator%20Response%20to%20Notice_04162024_(23-264818).pdf

42024023NOA_Closure Letter_08262024_(23-264818)_text.pdf

VIA ELECTRONIC MAIL to: jack.fusco@cheniere.com
August 26, 2024
Jack Fusco
President and Chief Executive Officer
Cheniere Energy, Inc.
700 Milam Street, Suite 1900
Houston, Texas 77002
CPF 4-2024-023-NOA
Dear Mr. Fusco:
From February 21 to July 21, 2023, of the on-site inspection, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to
Chapter 601 of 49 United States Code (U.S.C.) inspected Cheniere Creole Trail Pipeline, L.P.’s
(Cheniere) procedures regarding the transport of natural gas from Gillis, Louisiana, to the Sabine
Pass liquefied natural gas facility in Cameron Parish, Louisiana, through its 42-inch pipeline.
Cheniere Creole Trail Pipeline, L.P., is a subsidiary of Cheniere Energy, Inc.
On March 20, 2024, PHMSA issued the Notice, CPF 4-2024-023-NOA, to Cheniere requiring
amendments of its operations and maintenance procedures.
Cheniere submitted its amended procedures on April 16, 2024. PHMSA reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Corey Grindal, EVP and Chief Operating Officer, cory.grindal@cheniere.com



Chris Williams, Vice President, Pipeline Operations, chris.williams@cheniere.com
Paul Falgout, Pipeline Regulatory Compliance Manager, paul.falgout@cheniere.com

42024023NOA_Notice of Amendment_03202024_(23-264818)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: jack.fusco@cheniere.com
March 20, 2024
Jack Fusco
President and Chief Executive Officer
Cheniere Energy, Inc.
700 Milam Street, Suite 1900
Houston, Texas 77002
CPF 4-2024-023-NOA
Dear Mr. Fusco:
From February 21 to July 21, 2023, of the on-site inspection, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant
to Chapter 601 of 49 United States Code (U.S.C.) inspected Cheniere Creole Trail Pipeline, L.P.’s1
(Cheniere) procedures regarding the transport of natural gas from Gillis, Louisiana, to the Sabine
Pass liquefied natural gas facility in Cameron Parish, Louisiana, through its 42-inch pipeline.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Cheniere’s plans or procedures, as described below:
1. 49 U.S.C. § 60108. Inspection and maintenance
(a) . . . .
(2) If the Secretary or a State authority responsible for enforcing
standards prescribed under this chapter decides that a plan required
under paragraph (1) of this subsection is inadequate for safe operation,
the Secretary or authority shall require the person to revise the plan. .
. . In deciding on the adequacy of a plan, the Secretary or authority
shall consider—
(A) . . . .
(E) the extent to which the plan addresses the replacement or
remediation of pipelines that are known to leak based on the material
(including cast iron, unprotected steel, wrought iron, and historic
plastics with known issues), design, or past operating and maintenance
history of the pipeline.
1 Cheniere Creole Trail Pipeline, L.P., is a subsidiary of Cheniere Energy, Inc.



The Pipeline Safety Act, 49 U.S.C. § 60108(a)(1), requires each person owning or operating a gas
pipeline facility or hazardous liquid pipeline facility to carry out a written plan for inspection and
maintenance of each facility used in transportation. If PHMSA or a certified State authority
determines a written plan does not comply with § 60108(a), has not been adequately implemented,
is inadequate for the safe operation of a pipeline facility, or is otherwise inadequate, PHMSA or
the State authority may require the owner or operator to take corrective action.
Section 114 of the Protecting our Infrastructure of Pipelines and Enhancing Safety Act of 2020,
Public Law No. 116-260 (Act), required owners and operators, by December 27, 2021, to update
their inspection and maintenance plans to address the amendments made in the following sections
of the Act:
Section 60108(a)(2)(D) requires PHMSA to evaluate the extent to which operators’ plans will
contribute to— (i) public safety; (ii) eliminating hazardous leaks and minimizing releases of
natural gas from pipeline facilities; and (iii) the protection of the environment; and
Section 60108(a)(2)(E) requires PHMSA or to evaluate the extent to which operators’ plans
address the replacement or remediation of pipelines that are known to leak based on the material
(including cast iron, unprotected steel, wrought iron, and historic plastics with known issues),
design, or past operating and maintenance history of the pipeline.
Pursuant to 49 U.S.C. § 60108(a), our review of your inspection and maintenance plan indicates
the procedures are inadequate for safe operation. Specifically, the following item needs
amendment:
49 U.S.C. § 60108(a)(2)(E) the extent to which the plan addresses the replacement or remediation
of pipelines that are known to leak based on the material (including cast iron, unprotected steel,
wrought iron, and historic plastics with known issues), design, or past operating and maintenance
history of the pipeline.
Cheniere’s procedures are inadequate for safe operation because they do not address the
replacement or remediation of pipelines that are known to leak based on the material (including
cast iron, unprotected steel, wrought iron, and historic plastics with known issues), design, or past
operating and maintenance history of the pipeline. Cheniere’s procedure (OMP-PPL-6000,
Operations and Maintenance Manual, Rev. 2022) failed to adequately define leak prone pipe and
to include a justification for the assertion that it does not operate or own leak prone pipe.
Therefore, Cheniere’s inspection and maintenance plans were inadequate to assure safe operation
of a pipeline facility in accordance with 49 U.S.C. § 60108(a)(2)(E). Cheniere must revise its
procedures as specified above.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings.



Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Cheniere maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Bryan Lethcoe, Director, Southwest, Pipeline and Hazardous
Materials Safety Administration. In correspondence concerning this matter, please refer to CPF 4-
2024-023-NOA and, for each document you submit, please provide a copy in electronic format
whenever possible.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: Corey Grindal, EVP and Chief Operating Officer, cory.grindal@cheniere.com
Chris Williams, Vice President, Pipeline Operations, chris.williams@cheniere.com
Paul Falgout, Pipeline Regulatory Compliance Manager, paul.falgout@cheniere.com
- **truncated:** false
- **body characters:** 10244