# DCP MIDSTREAM, LP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 42025056NOPV
- **title:** DCP MIDSTREAM, LP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2025-08-29
- **effective on:** Not available
- **summary:** OPEN notice of probable violation citing 192.229(c)(1), 192.463(a), 192.619(a)(3), 192.619(c)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-42025056nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-42025056nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-42025056nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/42025056NOPV
**body:**

Notice of Probable Violation involving DCP MIDSTREAM, LP. PHMSA's enforcement data identifies the cited regulations as 192.229(c)(1),  192.463(a),  192.619(a)(3),  192.619(c)(1). The case was opened on 2025-08-29 and is reported as open. Proposed civil penalty: $37,200. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42025056NOPV_Operator Response to Notice and Request for Hearing and Request Informal Settlement Conference and Statement of Issues_10292025_(24-296556).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42025056NOPV/42025056NOPV_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing%20and%20Request%20Informal%20Settlement%20Conference%20and%20Statement%20of%20Issues_10292025_(24-296556).pdf

42025056NOPV_PCP PCO_08292025_(24-296556).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42025056NOPV/42025056NOPV_PCP%20PCO_08292025_(24-296556).pdf

42025056NOPV_PCP PCO_08292025_(24-296556)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42025056NOPV/42025056NOPV_PCP%20PCO_08292025_(24-296556)_text.pdf
- **truncated:** false
- **body characters:** 1123
