# PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 520045009
- **title:** PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2004-03-22
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.308, 195.571, 195.573(e), 195.575(e), 195.577(a), 195.579(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520045009.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520045009.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520045009
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520045009
**body:**

Notice of Probable Violation involving PHILLIPS 66 PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195,  195.308,  195.571,  195.573(e),  195.575(e),  195.577(a),  195.579(a). The case was opened on 2004-03-22 and is reported as closed as of 2008-04-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520045009_Final Order_09202006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045009/520045009_Final%20Order_09202006.pdf

520045009_final order_09202006_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045009/520045009_final%20order_09202006_text.pdf

CPF_NO_5-2004-5009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045009/CPF_NO_5-2004-5009.pdf

520045009_final order_09202006_text.pdf

O
U S Department
of Transportation
Pipeline and Hazardous
Materials Safety Administration
SEP 20 duo
Ms. Meg Yeage
President
Conoco Phillips
600 North Dairy Ashford
TA 2010
Houston, Texas 77079
Re: CPF No. 5-2004-5009
Dear Ms. Yeage:
400 Seventh Street, S W
Washington, D C 20590
Enclosed is the Final Order issued by the Acting Associate Administrator for Pipeline
Safety in the above-referenced case. It makes findings of violation and specifies actions to be
taken to comply with the pipeline safety regulations. When the terms of the Compliance
Order are completed, as determined by the Director, Western Region, this enforcement action
will be closed. Your receipt of the Final Order constitutes service under 49 C. F. R. $ 190. 5.
Sincerely,
James Reynolds
Pipeline Compliance Registry
PHMSA-Office of Pipeline Safety
Enclosure
cc: Mr. Chris Hoidal, P. E.
, Director, Western Region, PHMSA
CERTIFIED MAIL — RETUR1V RECEIPT RE UESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
In the Matter of
ConocoPhillips,
Respondent
CPF No. 5-2004-5009
FINAL ORDER
On August 11-15 and October 2, 2003, pursuant to 49 U. S. C. $ 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration's {PHMSA's)' Office of Pipeline Safety
conducted an on-site pipeline safety inspection of Respondent's Yellowstone Pipeline facilities
in Montana and Idaho as well as manuals and records in Billings, Helena, and Missoula,
Montana. As a result of the inspection, the Director, Western Region, issued to Respondent, by
letter dated March 22, 2004, a Notice of Probable Violation and Proposed Compliance Order
{Notice). In accordance with 49 C. F. R. $ 190. 207, the Notice proposed finding that Respondent
had violated 49 C. F. R. Part 195 and proposed ordering Respondent to take certain measures to
correct the alleged violations. The Notice also warned Respondent to take appropriate corrective
action on other cited items.
Respondent responded to the Notice by letter dated April 28, 2005, later supplemented
(Response). Respondent contested the allegations and offered information to explain the
allegations. Respondent did not request a hearing, and therefore has waived its right to one.
FINDINGS OF VIOLATION
(Contested)
Item 3 in the Notice alleged Respondent violated 49 C. F. R. $ 195. 571 by failing to properly
consider the voltage drop when measuring cathodic protection levels on its Yellowstone
Pipeline. The Notice alleged that Respondent could not provide documentation showing how
' Effective February 20, 2005, the Pipeline and Hazardous Materials Safety Administration (PHMSA) succeeded
Research and Special Programs Administrat&on as the agency responsible for regulating safety in pipeline
transportation and hazardous materials transportation. See, section 108 of the Norman Y. Mineta Research and
Special Programs Improvement Act (Public Law 108-426, 118 Stat. 2423-2429 (November 30, 2004)). See also, 70
Fed. Reg. 8299 (February 18, 2005) redelegating the pipeline safety authonties and functions to the PHMSA
Admimstrator.



considerations for voltage drops have been accounted for when Respondent used a cathodic
protection adequacy criteria of an "on" potential at least as negative as 850 millivolts (mV) with
respect to a saturated copper/copper sulphate reference electrode.
49 C. F. R. $ 195. 571 requires that cathodic protection monitoring criteria must meet the
requirements of NACE Standard RP0169-96, "Control of External Corrosion on Underground or
Submerged Metallic Piping Systems, " paragraphs 6. 2 and 6. 3. NACE RP0169 Section 6 allows
for an operator to use -850 mV potential with cathodic protection applied and voltage drops
considered, typically known as the "on" method. An "on" potential taken with cathodic
protection current applied is made up of both the polarized potential of the structure being
protected as well as the voltage drop caused by the soils resistance to the protective current being
applied. The voltage drop magnitude of an "on" potential can be so high that the polarized
potential part of the "on" potential is not adequate to provide corrosion protection to the
structure. Therefore, an operator is required to consider those voltage drops to insure that there
is still sufficient cathodic protection current reaching the structure to provide protection from
corrosion. RP0169 Section 6 allows the operator to account for those voltage drops in several
ways including measurement or calculation of voltage drops, evaluation of physical evidence of
corrosion and/or evaluation of the cathodic protection system. Prudent industry practice is that
when potential measurements are more negative than 850 mV and voltage drops have been
accounted for, potentials measured may be used to monitor the cathodic protection system for a
period of time or until there is a significant change in the environment, structural, coating, or
cathodic protection system parameters. 2
In its April 28, 2004 Response, Respondent argues that sustaining "on" readings of at least as
negative as 850 mV is taking voltage drops into consideration. Respondent contends that this
information was made available to PHMSA during the 2003 inspection in support of this
argument.
In Respondent's case, it appears unclear as to how voltage drops are considered and how "on"
potentials were used for monitoring. During the 2003 inspection, cathodic protection records
consisted of "on" pipe to soil measurements taken along the pipeline during the 2002 and 2003
years. Though other information may have been available for review, PHMSA would still have
had to integrate the pig logs, the rectifier readings, the exposed pipe reports, the historic cathodic
protection levels, and other data at each test station to determine if "on" levels taken in 2002 and
2003 did demonstrate the adequacy of corrosion control measures. However, that is
Respondent's responsibility under 49 C. F. R. $ 195. 589 and not the PHMSA inspector.
Respondent's records do not clearly indicate how voltage drops. are considered nor do they
indicate "on" potentials being used to monitor each test station. Accordingly, I find that
Respondent violated 49 C. F. R. $ 195. 571 as alleged in the Notice.
Item 5 in the Notice alleged Respondent violated 49 C. F. R. $ 195. 575(e) by failing to install any
fault current or lightning protection on its pipeline where it is in close proximity to electrical
transmission tower footings. The Notice alleged that Respondent provided no evidence that
' See NACE Standard TM0497-97, "Measurement Techniques Related to Criteria for Cathodic Protection on
Underground or Submerged Metallic Piping Systems. "



Yellowstone Pipeline is protected from fault currents or lightning from several adjacent electrical
tower footings in the Heights area of Billings, Montana.
49 C. F. R. $ 195. 575(e) requires that an operator must protect their pipeline against damage from
fault currents or lightning imposed from electrical transmission tower footings.
In its April 28, 2004 Response, Respondent states that it considered the existing rectifiers and
associated groundbeds to be a form of protection from fault currents and lightning.
Respondent's supplement provided its procedures for "Ground Fault & Lightning Protection" to
PHMSA. Those procedures stated that "Any existing ground mats or ground rods as well as/or
any existing rectifier and its associated groundbed (within one mile of the influenced section),
which are electrically tied to a section of pipeline seeing AC influences or a section of pipeline in
close proximity to a high voltage power line tower footing or ground, are considered to provide
protection against ground faults and lightning strikes. "
During the 2003 inspection, data obtained indicates that the nearest rectifier is approximately
three miles from the beginning of this line segment that is in close proximity to tower footings.
In this case, the distance to the nearest rectifier is further than one mile, exceeding the criteria in
Respondent's procedures; furthermore, this segment of pipeline crosses through several
residences in a populated area of Billings, Montana.
Respondent additionally provided the "AC Electrical Interference Analysis Billings/Yellowstone
10" Pipeline" report prepared by ARK Engineering and Technical Services, Inc, dated December
13, 2004. In that report ARK Engineering did an alternating current (AC) interference study of
the area of concern. This study and subsequent analysis found that the worst case fault currents
from the adjacent electrical transmission lines in the Heights area of Billings, Montana would
induce a coating stress voltage of 1260 V. That report also states that coating damage can occur
when coating stress voltages are greater than 5000 V on pipelines coated with fusion bonded
epoxy and when these voltages are between 1000 V and 2000 V for bitumen coated pipelines.
Although the report concludes that no additional mitigation methods are required at this time on
this section of pipeline, that conclusion is based on the assumption that the pipeline is coated
with fusion bonded epoxy. Respondent's personnel informed the PHMSA inspector that this
pipeline segment is coated with coal tar enamel, a bitumen based coating. Therefore, it appears
that this report calls for some type of mitigating action to minimize coating stress voltages that
could be induced from fault currents.
Accordingly, I find that Respondent violated 49 C. F. R. $ 195. 575(e) as alleged in Item 5 of the
Notice.
Item 6 in the Notice alleged Respondent violated 49 C. F. R. $ 195. 577(a) by failing to provide
protection from current induced upon the Yellowstone Pipeline from adjacent electrical
transmission power lines in the Heights area of Billings, Montana. The Notice alleged that the
AC pipe to soil readings at the time of this inspection showed an induced AC voltage on the
pipeline of 5V.



It its April 28, 2004 Response, Respondent stated that no AC potential readings taken on the
Yellowstone Pipeline at the time of the 2003 inspection were above 5V AC, which is less than
the 15V AC action level defined in their procedures. Therefore, Respondent contends that
provisions at this location are adequate. In its procedure MPR-4006, "High Voltage AC Power
Lines — Influence on Pipelines — Safety Precautions and Corrosion Mitigation Considerations"
(Effective Date 2004-05-26" submitted to PHMSA on May 26, 2004, Respondent considers
readings above 15 V AC to be detrimental both because of worker safety and pipeline corrosion.
Although Respondent submitted "AC Electrical Interference Analysis Billings/Yellowstone 10"
Pipeline" report to also address Notice Item 6, that study only investigated the induced AC
voltages on the Yellowstone Pipeline and not the AC current density. In addition, this report
concluded that touch voltages present no apparent personal safety concerns.
According to NACE Corrosion 2004 Paper 04206, "AC Corrosion: Corrosion Rate and
Mitigation Requirements" by Mark Yunovick and Neil G. Thompson of CC Technologies
Laboratories, Inc.
,
"The mitigation threshold of 15 V recommended in NACE RP0177 for safety
concerns is not necessarily sufficient to mitigate AC corrosion. " That is, although maintaining
induced current potentials below 15 V AC is primarily a safety level to provide shock protection
to individuals working on the pipeline per NACE Standard RP0177-2000, "Mitigation of
Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control
Systems, " it is questionable as to whether this is an acceptable level to prevent corrosion.
Furthermore, the NACE AC Corrosion 2004 Paper 04206 gives guidance that mitigation criteria
should put the emphasis on mitigating the AC current density, rather than the AC voltage.
Here, an AC current density study was not done on this segment of pipeline and, thus, it cannot
be determined if induced AC voltages/currents present a corrosion hazard.
Accordingly, I find that Respondent violated 49 C. F. R. $ 195. 577 as alleged in Item 6 of the
Notice.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Items 3, 5, and 6 in the Notice. Under
49 U. S. C. $ 60118(a), each person who engages in the transportation of hazardous liquids or who
owns or operates a pipeline facility is required to comply with the applicable safety standards
established under Chapter 601. Pursuant to the authority of 49 U. S. C. $ 60118(b) and 49 C. F. R.
$ 190. 217, Respondent is ordered to take the following actions to ensure compliance with the
pipeline safety regulations applicable to its operations. Respondent must—
With respect to Item 3, pertaining to voltage drop consideration on the Yellowstone
Pipeline, develop a procedure for monitoring cathodic protection that incorporates
methods to be used to determine if one of the criteria listed in paragraph 6. 2 of NACE
Standard RP0169-96 has been met.



With respect to Item 5, pertaining to fault currents or lightning from adjacent
electrical transmission lines in the Heights area of Billings, Montana, protect the
pipeline against damage from fault currents or lightning along this segment as well as
any other segments that are close to electrical transmission tower footings;
3. With respect to Item 6, pertaining to the area of AC influence in the Heights area of
Billings, Montana, develop a program to identify, test for, and minimize detrimental
effects of currents induced upon the pipeline from adjacent electrical transmission
power lines;
Within 30 days of receipt of this Final Order, complete the above items;
Respondent shall maintain documentation of the safety improvement costs associated
with fulfilling this Compliance Order and submit the total to Director, Western
Region, PHMSA. Costs shall be reported in two categories: 1) total cost associated
with preparation/revision of plans, procedures, studies and analyses, and 2) total cost
associated with replacements, additions and other changes to pipeline infrastructure;
and
Submit documentation of procedures, costs and evidence of actions taken to the
Director, Western Region, Pipeline and Hazardous Materials Safety Administration,
12300 West Dakota Avenue, Suite 110, Lakewood, Colorado 80228. Please refer to
CPF No. 5-2004-5009 on any correspondence or communication in these matters.
The Director, Western Region, may grant an extension of time to comply with any of the
required items upon a written request timely submitted by the Respondent demonstrating good
cause for an extension.
Failure to comply with this Final Order may result in the assessment of civil penalties of not
more than $100, 000 per day, or in the referral of the case for judicial enforcement.
WARNING ITEMS
The Notice did not propose a civil penalty or corrective action for Items 1 and 2 in the Notice but
warned Respondent that it should take appropriate corrective action to correct the items.
Item 1, as more fully described in the Notice, was for failing to test tie-ins in accordance with
49 C. F. R. gg 195. 308. Respondent stated in its response that the six-foot segment of pipe in
question was installed before the pipeline was hydrostatically tested on April 10, 2003.
However, information from the 2003 inspection of the Yellowstone Pipeline showed that the six-
foot pipe segment in question was installed on April 11, 2003, one day after the hydrostatic test
was completed for the pipeline. This six-foot pipe segment replaced piping that included a
fitting used for the April 10, 2003 hydrostatic test. There is no definitive evidence that this piece
of pipe was pressure tested prior to being installed on April 11, 2003.



Item 2, as more fully described in the Notice, was for failing to take corrective action to mitigate
corrosive activity in accordance with 49 C. F. R. $$ 195. 402 and 195. 579. This item was
uncontested and Respondent provided documentation indicating it was addressing this internal
corrosion issue.
Items 1 and 2 in the Notice are considered to be warning items. Respondent is warned that if it
does not take appropriate action to correct these items, enforcement action will be taken if a
subsequent inspection reveals a violation.
WITHDRAWAL OF WARNING ITEM
Item 4 in the Notice cited that Respondent's records showed that there were low cathodic
protection readings at MP 3. 7 on the Alkali Creek to Laurel segment in both 2002 and 2003
years. Respondent presented data, indicating that it was following up on the low cathodic
protection potentials at MP 3. 7 on the Alkali Creek to Laurel segment after the first low reading
was taken in 2002, which was prior to the 2003 PHMSA inspection. Based on this information, I
am withdrawing this warning item.
Under 49 C. F. R. $ 190. 215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be received within 20 days of Respondent's receipt of this
Final Order and must contain a brief statement of the issue(s). The terms of the order, including
any required corrective action, remain in full effect unless the Associate Administrator, upon
request, grants a stay. The terms and conditions of this Final Order are effective on receipt.
eo ore L. Willke
Acting Associate Administrator
for Pipeline Safety
Date Issued