# CENEX PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 520055004
- **title:** CENEX PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-02-09
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.1, 195.310(b)(9), 195.402(c)(13), 195.402(c)(4), 195.402(d)(5), 195.403(a)(6), 195.403(b)(2), 195.403(c), 195.404(a)(3), 195.428(a), 195.581(c)(2), 195.589(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520055004.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520055004.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520055004
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520055004
**body:**

Notice of Probable Violation involving CENEX PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195,  195.1,  195.310(b)(9),  195.402(c)(13),  195.402(c)(4),  195.402(d)(5),  195.403(a)(6),  195.403(b)(2),  195.403(c),  195.404(a)(3),  195.428(a),  195.581(c)(2),  195.589(c). The case was opened on 2005-02-09 and is reported as closed as of 2008-04-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520055004_final order_04182008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520055004/520055004_final%20order_04182008.pdf

520055004_final order_04182008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520055004/520055004_final%20order_04182008_text.pdf

520055004_final order_04182008_text.pdf

U S Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
APR 1 8 lol18
t200 New Jersey Ave S E
Washington DC 20590
Mr. Dan Knepper
Vice President, Energy Operations
Front Range Pipeline, LLC
803 Highway 212 South
Laurel, MT 59044
Re: CPF No. 5-2005-5004
Dear Mr. Knepper.
Enclosed is the Final Order issued in the above-referenced case. It makes findings of violation
and finds that you have completed the actions specified in the Notice required to comply with the
pipeline safety regulations. It also finds that you have addressed the inadequacies in your
procedures that were cited in the Notice of Amendment Therefore, this case is now closed.
Your receipt of the Final Order constitutes service under 49 C. F. R $ 190. 5.
Thank you for your cooperation in this matter
Smcerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Chris Hoidal
Director, Western Region, PHMSA
CERTIFIED MAIL — RETURN RECEIPT RE UESTED



U. S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D. C. 20590
In the Matter of
Front Range Pipeline, LLC,
formerly CHS, Inc.
,
Respondent
CPF No. 5-2005-5004
FINAL ORDER
On August 19, 2004 and between October 4 and 8, 2004 pursuant to 49 U, S C, ) 60117, a
representative of Western Region of the Pipeline and Hazardous Materials Safety Administration
(PHMSA), conducted an onsite pipeline safety inspection of Front Range Pipeline's (Front
Range or Respondent) Tank 47, records, and manuals in Laurel, Montana, and its crude oil
pipeline facilities between the Canadian border and Cutbank, Montana.
As a result of the inspection, the Director, Western Region, of PHMSA's Office of Pipeline
Safety (OPS), issued to Respondent, by letter dated February 9, 2005, a Notice of Probable
Violation, Proposed Compliance Order, and Notice of Amendment (Notice). ' In accordance
with 49 C. F. R, ) 190 207, the Notice proposed finding that Respondent had committed violations
of 49 C, F. R. ) 195. 1 and proposed ordering Respondent to take certain measures to correct the
alleged violations. The Notice also proposed, in accordance with 49 C. F, R. ) 190. 237, that
Respondent amend its written procedures and plans. The Notice further proposed finding that
Respondent had committed certain other probable violations of 49 C. F. R. Part 195 and warning
Respondent to take appropriate corrective action to address them or be subject to future
enforcement action.
Respondent responded to the Notice by letter dated April 1, 2005 (Response). Respondent did
not contest the allegations of violation but submitted copies of its amended procedures.
Respondent did not request a hearing and therefore has waived its right to one.
' The Notice of Probable Violation was addressed to CHS, Inc, the operator of the facilities that are the subject of
this Final Order Front Range now operates said facilities as a subsidiary of CHS, Inc



FINDING OF VIOLATION
Pursuant to 49 C. F. R. $ 190. 213 and U. S. C. $ 60122, I find that Respondent violated the
following section of 49 C. F R. Part 195, as more fully described m the Notice:
Notice Item 1: The Notice alleged that Respondent violated 49 C. F. R. ) 195. 1(c), which states:
49 C. F. R. g 195. 1 Applicability.
(a) Except as provided in paragraph (b) of this section, this part applies to pipeline
facilities and the transportation of hazardous liquids or carbon dioxide associated with
those facilities in or affecting interstate or foreign commerce, includmg pipeline facilities
on the Outer Continental Shelf. . . . .
(c) Breakout tanks subject to this part must comply with requirements that apply
specifically to breakout tanks and, to the extent applicable, with requirements that apply
to pipeline systems and pipeline facilities. If a conflict exists between a requirement that
applies specifically to breakout tanks and a requirement that applies to pipelme systems
or pipeline facilities, the requirement that apphes specifically to breakout tanks
prevails. . . . . .
The Notice alleged that Respondent had failed to consider its Tank No, 74 to be a breakout tank
and therefore had failed to meet the various requirements for breakout tanks under Part 195. A
breakout tank is a tank used to relieve surges in a hazardous liquid pipeline system or to receive
and store hazardous liquid transported by a pipeline for rein~ection or continued transportation by
pipeline, 49 C. F. R. ) 195. 2. The Notice alleged that "Tank 74 receives crude oil from the CHS
Front Range pipeline terminus pressiue relief. " In its Response, Respondent did not contest that
Tank 74 is a breakout tank.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent,
COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Item 1 in the Notice for violation of 49
C, F. R. $ 195. 1. Under 49 U. S, C. $ 60118(a), each person who engages in the transportation of
hazardous liquids or who owns or operates a pipeline facility is required to comply with the
applicable safety standards estabhshed under chapter 601. The Director has indicated that
Respondent has taken certain corrective measures to bring the specified matter into compliance
with $ 195. 1. Since compliance has been achieved with respect to this violation, it is
unnecessary to include the proposed compliance terms in this Order.
AMENDMENT OF PROCEURES
With respect to items 3, 4, 6, and 9, the Notice alleged certain inadequacies in Respondent's
Operations, Maintenance, and Emergencies Manual (Manual) and proposed to require that
Respondent amend it to comply with 49 C. F. R. )) 195. 402 — 195. 404. Specifically:



Item 3 of the Notice alleged that Respondent violated 49 C. F. R. $ 195. 402(c)(4) because its
Manual did not identify areas that would require an immediate response by the operator to
prevent hazards to the public if the facilities failed or malfunctioned.
Item 4 of the Notice alleged that the Respondent violated 49 C. F. R. $ 195. 402(c)(13) because its
Manual did not require periodic review of work done by the operator during normal operations to
determine the effectiveness of the company's procedures.
Item 6 of the Notice alleged that the Respondent violated 49 C F. R ) 195. 403(a)(1)-(6) by
failing to establish and conduct a continuing training program to instruct operating and
maintenance personnel in emergency procedures.
Item 9 of the Notice alleged that the Respondent violated 49 C. F. R. $ 195. 404(a)(3) because its
Manual failed to include the proper maximum operating pressure for the 10-inch pipeline
installed in 1985 that runs from the Canadian border to the Santa Rita pump station.
Respondent did not contest the proposed Notice of Amendment but provided amended
procedures, which the Director has reviewed and approved. Accordmgly, based on the results of
this review, I find that Respondent's original procedures and plans were inadequate to ensure
safe operation of its pipeline system but that Respondent has corrected the identified
inadequacies. Therefore, no need exists to issue an order directing amendment.
WARNING ITEMS
With respect to Items 2, 5, 7, 8, 10, 11, and 12, the Notice alleged probable violations of Part 195
but did not propose a civil penalty or compliance order for these items, Therefore, these items
are considered warning items. The warnings were for:
49 C. F, R. ) 195. 310(b)(9) notice Item 2) — Respondent's failure to include in its testing records
a profile showing elevation and test sites for the section of pipeline from the Canadian border to
the Santa Rita pump station. The regulations require a profile where the elevation difference in a
section exceeds 100 feet. Respondent's pressure test records for this section indicate an
elevation difference of 618 feet.
49 C. F. R. ) 195 402(d)(5) (Notice Item 5) — Respondent's failure to document in its Manual any
review of abnormal operating conditions to determme the effectiveness of the company's
procedures for controlling abnormal operation and taking corrective action where deficiencies
are found.
49 C. F. R. 195. 403(b)(1)-(2) (Notice Item 7) — Respondent's failure to demonstrate through its
records that it had engaged in a review with personnel of their performance in meeting training
program objectives and the company's failure to demonstrate that it had made appropriate
changes to its emergency response training program to ensure its effectiveness. Respondent's
records did not contain any records of an annual review of its emergency response personnel's
performance to ensure the adequacy of their emergency response training.



49 C. F. R. $ 403(c) (Notice Item 8) — Respondent's failure to demonstrate through its records that
it had verified that supervisors maintained a thorough knowledge of that portion of the $ 195, 402
procedures for which they were responsible. Although Respondent's training procedures gave
guidance for annual verification of each supervisor's knowledge of procedures, Respondent had
no records indicating that managers had actually verified each supervisor's knowledge of such
procedures.
49 C. F. R. ) 195. 428(a) (Notice Item 10) — Respondent's failure to inspect and test at intervals of
each calendar year not to exceed 15 months each relief valve to determine whether it was
functioning properly, was in good mechanical condition, and was adequate from the standpoint
of capacity and reliability of operation for the service in which it was used. At the time of the
inspection, the Flex Flow relief valve on the Cutbank Tank Hill had not been tested at the proper
intervals.
49 C. F. R. $ 195. 581(c)(1)-(2) (Notice Item 11) — Respondent's failure to protect against
atmospheric corrosion for portions of pipelines in soil-to-air interfaces or to show that corrosion
would only be a light surface oxide or that it would not affect safe operation. Piping associated
with Tank 10 at the Santa Rita pump station was resting directly on the ground with no
additional coating for protection against soil abrasion. Areas where pipe rests directly on the
ground are considered soil-to-air interfaces,
49 C. F. R. () 195 195, 583(c) and 195. 589(c) (Notice Item 12) — Respondent's failure to protect
against atmospheric corrosion and failure to maintain corrosion control records of each analysis,
check, demonstration, inspection, investigation, review, survey, and test to detail the accuracy of
corrosion control measures. Respondent's atmospheric corrosion investigation records of certain
valves north of the Santa Rita station indicated that there was atmospheric corrosion present. At
the time of the inspection, no corrosion control measures action had been taken.
Having considered such information, I find, pursuant to 49 C. F. R, ( 109 205, that probable
violations of 49 C. F. R. $ 195. 310(b)(9) (Notice Item 2), 49 C. F. R. ) 195. 402(d)(5) (Notice Item
5), 49 C. F. R. 195. 403(b)(1)-(2) (Notice Item 7), 49 C. F. R. ) 403(c) (Notice Item 8), 49 C. F. R. (
195. 428(a) (Notice Item 10), 49 C. F, R. ) 195, 581(c)(1)-(2) (Notice Item 11), and 49 C. F. R )$
195. 195. 583(c) and 195. 589(c) (Notice Item 12) have occurred and Respondent is hereby
advised to correct such conditions. In the event that PHMSA finds a violation for any of these
items in a subsequent inspection, Respondent may be subject to future enforcement action.
The terms and conditions of this Final Order shall be effective upon receipt,
APR 1 8 N08
Date Issued
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
- **truncated:** false