# CALIFORNIA RESOURCES CENTRAL VALLEY — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 520070023
- **title:** CALIFORNIA RESOURCES CENTRAL VALLEY — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2007-11-16
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.457(a), 192.459, 192.463(a), 192.465(a), 192.467(c), 192.475, 192.477, 192.615(c), 192.705, 192.739.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520070023.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520070023.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520070023
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520070023
**body:**

Notice of Probable Violation involving CALIFORNIA RESOURCES CENTRAL VALLEY. PHMSA's enforcement data identifies the cited regulations as 192.457(a),  192.459,  192.463(a),  192.465(a),  192.467(c),  192.475,  192.477,  192.615(c),  192.705,  192.739. The case was opened on 2007-11-16 and is reported as closed as of 2009-09-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520070023_FinalOrder_09142009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520070023/520070023_FinalOrder_09142009.pdf

520070023_FinalOrder_09142009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520070023/520070023_FinalOrder_09142009_text.pdf

520070023_FinalOrder_09142009_text.pdf

SEP 14 2009
Mr. Duane Dudics, PE
HES Manager
Vintage Production California LLC
9600 Ming Ave., Suite 300
Bakersfield, CA 93311
Re: CPF No. 5-2007-0023
Dear Mr. Dudics:
Enclosed is the Final Order issued in the above-referenced case. It makes findings of violation
and finds that Vintage Production California LLC has completed the actions specified in the
Notice required to comply with the pipeline safety regulations. This case is now closed. Your
receipt of this Final Order constitutes service of that document under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Chris Hoidal, Director, Western Region, OPS
CERTIFIED MAIL – RETURN RECEIPT REQUESTED [7004 2510 0003 6895 8808]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
___________________________________
In the Matter of )
Vintage Production California LLC, ) CPF No. 5-2007-0023
)
)
Respondent. )
___________________________________ )
FINAL ORDER
Between July 30 - August 2, 2007, pursuant to 49 U.S.C. § 60117, representatives of the Pipeline
and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an inspection of the facilities and records of Vintage Production California LLC’s
(Vintage or Respondent) pipeline system near Piru and Santa Paula, California. Respondent
operates a gas gathering pipeline system which consists of 20-miles of pipeline located within
one or more High Consequence Areas (HCAs).1
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated November 16, 2007, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that Respondent had violated 49 C.F.R. §§ 192.457(a), 192.463(a), 192.475(a)-(b),
192.477, 192.705(a), and 192.739(a), and proposed ordering Respondent to take certain
measures to correct the alleged violations. The Notice also proposed finding that Respondent had
committed probable violations of 49 C.F.R. §§ 192.459, 192.465(a), 192.467(c), and 192.615(c),
and warned Respondent to take appropriate corrective action or be subject to future enforcement
action.
Vintage sought and received a brief extension to respond to the Notice. Vintage responded to the
Notice by letters dated January 7, 2008, and July 23, 2009 (Responses). Respondent did not
contest the items in the Notice and provided explanations and information concerning the
corrective actions it had taken and planned to take in the future. Respondent did not request a
hearing and has therefore waived its right to one.
1 49 C.F.R. § 192.903 defines “high consequence areas.”



2
FINDINGS OF VIOLATION
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.457(a), which states:
§ 192.457 External Corrosion Control: Buried or submerged pipelines
installed before August 1, 1971.
(a) Except for buried piping at compressor, regulator, and measuring
stations, each buried or submerged transmission line installed before
August 1, 1971, that has an effective external coating must be cathodically
protected along the entire area that is effectively coated, in accordance
with this subpart. For the purposes of this subpart, a pipeline does not
have an effective external coating if its cathodic protection current
requirements are substantially the same as if it were bare. The operator
shall make tests to determine the cathodic protection current requirements.
Item 1 alleged that Respondent violated § 192.457(a) by failing to cathodically protect certain of
its buried pipelines. Specifically, it alleged that Vintage had not cathodically protected its
Saticoy and Maulhardt gathering line systems.2 Both of these systems are Type A gathering
lines.3
Respondent did not contest this allegation, and provided information regarding the design,
purchase, and installation of cathodic protection (CP) on the Saticoy and Maulhardt systems.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R. §
192.457(a) by failing to cathodically protect the Saticoy and Maulhardt gathering systems.
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 192.463(a), which states:
§ 192.463 External corrosion control: Cathodic protection.
(a) Each cathodic protection system required by this subpart must
provide a level of cathodic protection that complies with one or more of
the applicable criteria contained in appendix D of this part . . .
2 The Saticoy and Mulhardt gathering pipelines are in Class 2 and 3 areas, respectively. Pipeline locations are
classified according to their proximity to buildings intended for human occupancy or other places of public
assembly, as more fully described in 49 C.F.R. § 192.5.
3 Both pipelines qualify as Type A regulated onshore gathering pipelines under 49 C.F.R. § 192.8. Operators of
such pipelines must comply with the majority of the Part 192 requirements, including the corrosion control
requirements in Subpart I – Requirements for Corrosion Control. 49 C.F.R. § 192.9. In its Response, Vintage did
not contest that prior to April 14, 2006, its pipelines were subject to the requirements of Part 192. Further, 49 C.F.R.
§ 190.209(c) states “[f]ailure of the respondent to respond in accordance with paragraph (a) of this section or, when
applicable, paragraph (c) of this section, constitutes a waiver of the right to contest the allegations in the notice of
probable violation and authorizes the Associate Administrator, OPS, without further notice to the respondent, to find
facts to be as alleged in the notice of probable violation and to issue a final order . . .”



3
Item 3 alleged that Respondent violated § 192.463(a) by failing to provide a level of CP that
complied with one or more of the applicable criteria contained in Appendix D of 49 C.F.R. Part
192. Specifically, it alleged that Respondent did not provide the adequate levels of CP on its
South Mountain Booster and Termo pipelines. Respondent’s annual CP reports for the two years
prior to the inspection indicated insufficient CP levels.
Respondent did not contest this allegation, and provided information regarding corrective actions
and testing it had performed or planned to perform. Accordingly, after considering all of the
evidence, I find that Respondent violated 49 C.F.R. § 192.463(a) by failing to provide a level of
CP that complied with one or more of the applicable criteria contained in Appendix D of 49
C.F.R. Part 192.
Item 6: The Notice alleged that Respondent violated 49 C.F.R. §§ 192.475(a) and (b), which
state:
§ 192.475 Internal corrosion control: General.
(a) Corrosive gas may not be transported by pipeline, unless the
corrosive effect of the gas on the pipeline has been investigated and steps
have been taken to minimize internal corrosion.
(b) Whenever any pipe is removed from a pipeline for any reason, the
internal surface must be inspected for evidence of corrosion. If internal
corrosion is found-
(1) The adjacent pipe must be investigated to determine the extent of
internal corrosion;
(2) Replacement must be made to the extent required by the
applicable paragraphs of §§ 192.485, 192.487, or 192.489; and
(3) Steps must be taken to minimize the internal corrosion.
Item 6 alleged that Respondent violated § 192.475(a) by failing to investigate the corrosive effect
of gas it transported in its pipeline. Specifically, it alleged that Respondent did not have a process
to monitor the corrosiveness of the gas it is transporting. OPS noted that Vintage’s Termo
gathering system transports some carbon dioxide (CO2) gas, but that Respondent was unaware of
how the CO2 affected the pipelines.
Item 6 also alleged that Respondent violated § 192.475(b) by failing to inspect the internal
surface of certain pipe removed from its system for evidence of corrosion. Specifically, it
alleged that on January 18, 2007, Respondent removed and replaced a short section of its
Barsdale gas gathering system, but failed to examine the interior surface of the removed pipeline
for signs of internal corrosion.
Respondent did not contest these allegations, but provided information regarding procedures and
equipment it had in place to investigate and minimize internal corrosion, including refresher
training for its personnel. Accordingly, after considering all of the evidence, I find that
Respondent violated 49 C.F.R. § 192.475(a) by failing to investigate the corrosive effect of the



4
gas it was transporting in its pipeline, and that Respondent violated 49 C.F.R. § 192.475(b) by
failing to inspect the internal surface of a section of pipeline that was removed.
Item 7: The Notice alleged that Respondent violated 49 C.F.R. § 192.477, which states:
§ 192.477 Internal corrosion control: Monitoring.
If corrosive gas is being transported, coupons or other suitable means
must be used to determine the effectiveness of the steps taken to minimize
internal corrosion. Each coupon or other means of monitoring internal
corrosion must be checked two times each calendar year, but with
intervals not exceeding 7 ½ months.
Item 7 alleged that Respondent violated § 192.477 by failing to use or periodically monitor
coupons or other suitable means to determine the effectiveness of steps taken to minimize
internal corrosion. Specifically, it alleged that Respondent’s Termo gas gathering system, which
contains a high concentration of CO2, is not monitored for internal corrosion. The Notice further
alleged that Respondent had no process in place to monitor internal corrosion of the pipeline.
Respondent did not contest this allegation and provided information regarding corrective actions
it had taken. Accordingly, after considering all of the evidence, I find that Respondent violated
49 C.F.R. § 192.477 by failing to use or periodically monitor coupons or other suitable means to
determine the effectiveness of steps taken to minimize internal corrosion.
Item 9: The Notice alleged that Respondent violated 49 C.F.R. § 192.705(a), which states:
§ 192.705 Transmission lines: Patrolling.
(a) Each operator shall have a patrol program to observe surface
conditions on and adjacent to the transmission line right-of-way for
indications of leaks, construction activity, and other factors affecting
safety and operation.
Item 9 alleged that Respondent violated § 192.705(a) by failing to patrol certain pipeline right-
of-ways for indications of leaks, construction activity, and other factors affecting safety and
operation. Specifically, the Notice alleged that Vintage had not patrolled the rights-of-way for
the Saticoy and Maulhardt systems since it started operating those systems in 2006.
Respondent did not contest this allegation and provided information regarding the corrective
actions it had taken. Accordingly, after considering all of the evidence, I find that Respondent
violated 49 C.F.R. § 192.705(a) by failing to patrol the Saticoy and Maulhardt pipeline rights-of-
way for indications of leaks, construction activity, and other factors affecting safety and
operation.



5
Item 10: The Notice alleged that Respondent violated 49 C.F.R. § 192.739(a), which states:
§ 192.739 Pressure limiting and regulating stations: Inspection and
testing.
(a) Each pressure limiting station, relief device (except rupture discs),
and pressure regulating station and its equipment must be subjected at
intervals not exceeding 15 months, but at least once each calendar year, to
inspections and tests to determines that it is-
(1) In good mechanical condition;
(2) Adequate from the standpoint of capacity and reliability of
operation for the service in which it is employed;
(3) Except as provided in paragraph (b) of this section, set to control
or relieve at the correct pressure consistent with the pressure limits of
§ 192.201(a); and
(4) Properly installed and protected from dirt, liquids, or other
conditions that might prevent proper operation.
Item 10 alleged that Respondent violated § 192.739(a) by failing to subject its relief devices to
inspections and tests at the intervals required.
Respondent did not contest the violation, but provided information indicating that it had
subsequently performed the required relief device inspections, and described additional safety
measures it had taken. Accordingly, after considering all of the evidence, I find that Respondent
violated 49 C.F.R. § 192.739(a) by failing to subject its relief devices to inspections and tests at
the intervals required.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent
COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Items 1, 3, 6, 7, 9, and 10 in the Notice
for violations of 49 C.F.R. Part 192.
Under 49 U.S.C. § 60118(a), each person who engages in the transportation of gas or who owns
or operates a pipeline facility is required to comply with the applicable safety standards
established under chapter 601. The Director has indicated that Respondent has satisfactorily
completed the following actions specified in the Proposed Compliance Order:
1. 49 C.F.R. § 192.457(a) -- With regard to the violation described in Item 1 of the
Notice, Respondent stated it has completed installation of CP systems on its
Maulhardt and Saticoy pipelines, and outlined the steps it took to complete the testing
and installation of those systems.



6
2. 49 C.F.R. § 192.463(a) -- With regard to the violation as described in Item 3 of
the Notice, Respondent stated it has provided adequate CP to its Termo pipeline and
South Mountain Booster, and outlined the steps it took to complete testing and
installation of CP systems.
3. 49 C.F.R. § 192.475(a)-(b) -- With regard to the violation as described in Item 6
of the Notice, Respondent stated it has added procedures and equipment to investigate
internal corrosion, and has taken additional steps to monitor and minimize internal
corrosion, including providing operations and maintenance refresher training for its
personnel.
4. 49 C.F.R. § 192.477 -- With regard to the violation as described in Item 7 of the
Notice, Respondent stated it has installed corrosion coupon holders and has taken
additional steps to monitor gas corrosivity and to monitor the effectiveness of its
“corrosion inhibitor treatment program.”
5. 49 C.F.R. § 192.705(a) -- With regard to the violation as described in Item 9 of
the Notice, Respondent began performing and keeping records of walking patrols in
September 2007. Respondent stated it will continue performing the patrols.
6. 49 C.F.R. § 192.739(a) -- With regard to the violation as described in Item 10 of
the Notice, the Responses provided information and records showing that Respondent
had performed the required relief device inspections, and also provided information
regarding additional relief devices it had installed.
Accordingly, since compliance has been achieved with respect to these violations, the
compliance terms are not included in this Order.
WARNING ITEMS
With respect to Items 2, 4, 5, and 8 the Notice alleged probable violation of 49 C.F.R. Part 192,
but did not propose a civil penalty or compliance order for these items. Therefore, these are
considered to be warning items. The warnings were for:
1. 49 C.F.R. § 192.459 (Notice Item 2) – Respondent’s alleged failure to examine
external corrosion on exposed pipeline and failure to examine a replaced section of
pipeline for signs of external corrosion.
2. 49 C.F.R. § 192.465(a) (Notice Item 4) – Respondent’s alleged failure to monitor
CP levels on portions of its pipeline as required.
3. 49 C.F.R. § 192.467(c) (Notice Item 5) – Respondent’s alleged failure to include
a casing in its annual CP survey to confirm it was electrically isolated from the gas
carrier pipe.



7
4. 49 C.F.R. § 192.615(c) (Notice Item 8) – Respondent’s alleged failure to produce
records confirming it had met with public officials regarding emergency plans as
required.
Vintage Production California did not provide any information in its Responses regarding the
warning items, but stated that “these items are also being addressed.” Having reviewed the
record, I find, pursuant to 49 C.F.R. § 190.205, that probable violations of 49 C.F.R. §§ 192.463,
192.465(a), 192.467(c), and 192.615(c) have occurred and Respondent is hereby advised to
correct such conditions. If OPS finds a violation for these items in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this Final Order shall be effective upon receipt.
_____________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false