# TESORO REFINING & MARKETING COMPANY, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 520080004W
- **title:** TESORO REFINING & MARKETING COMPANY, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2008-03-13
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.917(c), 192.935(a), 192.937(b), 192.947, 192.947(d).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520080004w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520080004w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520080004w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520080004W
**body:**

Warning Letter involving TESORO REFINING & MARKETING COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 192.917(c),  192.935(a),  192.937(b),  192.947,  192.947(d). The case was opened on 2008-03-13 and is reported as closed as of 2008-03-13. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520080004W_warning letter_03132008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520080004W/520080004W_warning%20letter_03132008.pdf

520080004w_warning letter_03132008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520080004W/520080004w_warning%20letter_03132008_text.pdf

520080004w_warning letter_03132008_text.pdf

SENT TO COMPLIANCE REGISTR
Hardcopy Electronically
it of Copies i /Date~Iotr
U. S Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
12300 W Dakota Ave, Suite 110
Lakewood, CO 80228
WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT RK UESTED
March 13, 2008
Mr. John W. Moore
V. P. Pipelines, Terminals, Trucking, and Rail (PTTR)
Tesoro Los Angeles Refinery
2101 E Pacific Coast Highway
Wilmington, CA, 90748
CPF 5-200S-0004W
Dear Mr. Moore:
On December 17 through December 20, 2007, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected Tesoro Los Angeles Refinery's procedures and records for your Integrity
Management Program (IMP) in Los Angeles, California.
As a result of the inspection, it appears you have committed probable violations of the Pipeline
Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violations are:
$192. 947 What records must an operator keep?
$192. 947 (d) Documents to support any decision, analysis and process developed
and used to implement and evaluate each element of the baseline assessment plan
and integrity management program. Documents include those developed and used
in support of any identification, calculation, amendment, modification, justification,
deviation and determination made, and any action taken to implement and evaluate
any of the program elements;



$192. 905 (a) GeneraL To determine which segments of an operator's transmission
pipeline system are covered by this subpart, an operator must identify the high
consequence areas. An operator must use method (1) or (2) from the definition in g
192. 903 to identify a high consequence area. An operator may apply one method to
its entire pipeline system, or an operator may apply one method to individual
portions of the pipeline system. An operator must describe in its integrity
management program which method it is applying to each portion of the operator's
pipeline system. The description must include the potential impact radius when
utilized to establish a high consequence area. (See appendix E. I. for guidance on
identifying high consequence areas. )
The Tesoro IMP does not include maps or other sufficiently detailed records of the
location of High Consequence Areas (HCAs) on the pipeline.
Evidence: Tesoro did not have any documentation to show that a system map was
available to identify any of the HCA along their pipeline system.
$192. 917 How does an operator identify potential threats to pipeline integrity and
use the threat identification in its integrity program?
(c) Risk assessment. An operator must conduct a risk assessment that follows
ASME/ANSI B31. SS, section 5, and considers the identified threats for each
covered segment. An operator must use the risk assessment to prioritize the
covered segments for the baseline and continual reassessments ($192. 919, $192. 921,
g 192. 937), and to determine what additional preventive and mitigative measures
are needed (g 192. 935) for the covered segment.
The Tesoro IMP does not define or document clearly the process for periodic evaluation
of pipeline integrity (using updated risk assessments, integrity assessment results, etc. ).
Evidence: The IMP does not require or define periodic evaluations.
$192. 937 What is a continual process of evaluation and assessment to maintain a
pipeline's integrity?
(b) Evaluation. An operator must conduct a periodic evaluation as frequently as
needed to assure the integrity of each covered segment. The periodic evaluation
must be based on a data integration and risk assessment of the entire pipeline as
specified in g 192. 917. For plastic transmission pipelines, the periodic evaluation is
based on the threat analysis specified in g 192. 917(d) For all other transmission
pipelines, the evaluation must consider the past and present integrity assessment
results, data integration and risk assessment information (g 192. 917), and decisions
about remediation (g 192. 933) and additional preventive and mitigative actions (g
192. 935). An operator must use the results from this evaluation to identify the
threats specific to each covered segment and the risk represented by these threats.



The IMP does not require the integrity evaluation to be conducted annually. Although
Shell analysts performed a "data integration" following the ILI in 2006, the pipeline's
risk assessment has not been updated since.
Evidence: No risk assessments conducted since 2004, despite additional information and
pipe condition changes. Next risk assessment is scheduled for 2012.
$192. 935 What additional preventive and mitigative measures must an operator
take?
(a) General requirements. An operator must take additional measures beyond
those already required by Part 192 to prevent a pipeline failure and to mitigate the
consequences of a pipeline failure in a high consequence area. An operator must
base the additional measures on the threats the operator has identified to each
pipeline segment. (See g 192. 917) An operator must conduct, in accordance with
one of the risk assessment approaches in ASME/ANSI B31. SS (incorporated by
reference, see g 192. 7), section 5, a risk analysis of its pipeline to identify additional
measures to protect the high consequence area and enhance public safety. Such
additional measures include, but are not limited to, installing Automatic Shut-off
Valves or Remote Control Valves, installing computerized monitoring and leak
detection systems, replacing pipe segments with pipe of heavier wall thickness,
providing additional training to personnel on response procedures, conducting
drills with local emergency responders and implementing additional inspection and
maintenance programs.
(b) Third party damage and outside force damage—
(1) Third party damage. An operator must enhance its damage prevention
program, as required under $192. 614 of this part, with respect to a covered
segment to prevent and minimize the consequences of a release due to third party
damage. Enhanced measures to an existing damage prevention program include, at
a minimum-
(i) Using qualified personnel (see f 192. 915) for work an operator is conducting
that could adversely affect the integrity of a covered segment, such as marking,
locating, and direct supervision of known excavation work.
(ii) Collecting in a central database information that is location specific on
excavation damage that occurs in covered and non covered segments in the
transmission system and the root cause analysis to support identification of
targeted additional preventative and mitigative measures in the high consequence
areas. This information must include recognized damage that is not required to be
reported as an incident under part 191.
(iii) Participating in one-call systems in locations where covered segments are
present.
(iv) Monitoring of excavations conducted on covered pipeline segments by pipeline
personnel. If an operator finds physical evidence of encroachment involving
excavation that the operator did not monitor near a covered segment, an operator
must either excavate the area near the encroachment or conduct an above ground



survey using methods defined in NACE RP-0502-2002 (incorporated by reference,
see $192. 7). An operator must excavate, and remediate, in accordance with
ANSI/ASME B31. 8S and $192. 933 any indication of coating holidays or
discontinuity warranting direct examination.
(2) Outside force damage. If an operator determines that outside force (e. g. ,
earth
movement, floods, unstable suspension bridge) is a threat to the integrity of a
covered segment, the operator must take measures to minimize the consequences to
the covered segment from outside force damage. These measures include, but are
not limited to, increasing the frequency of aerial, foot or other methods of patrols,
adding external protection, reducing external stress, and relocating the line.
(c) Automatic shut-off valves (ASV) or Remote control valves (RCV). If an
operator determines, based on a risk analysis, that an ASV or RCV would be an
efficient means of adding protection to a high consequence area in the event of a gas
release, an operator must install the ASV or RCV. In making that determination,
an operator must, at least, consider the following factors-swiftness of leak
detection and pipe shutdown capabilities, the type of gas being transported,
operating pressure, the rate of potential release, pipeline profile, the potential for
ignition, and location of nearest response personnel.
The Tesoro IMP does not include a risk-based evaluation to determine if automatic shut-
off valves or remote control valves should be added to the line to protect HCAs.
Evidence: The IMP does not include a requirement to perform this analysis.
$192. 947 What records must an operator keep?
An operator must maintain, for the useful life of the pipeline, records that
demonstrate compliance with the requirements of this subpart. At minimum, an
operator must maintain the following records for review during an inspection.
(a) A written integrity management program in accordance with g 192. 907;
(b) Documents supporting the threat identification and risk assessment in
accordance with g 192. 917;
(c) A written baseline assessment plan in accordance with g 192. 919;
(d) Documents to support any decision, analysis and process developed and used to
implement and evaluate each element of the baseline assessment plan and integrity
management program. Documents include those developed and used in support of
any identification, calculation, amendment, modification, justification, deviation
and determination made, and any action taken to implement and evaluate any of
the program elements;
(e) Documents that demonstrate personnel have the required training, including a
description of the training program, in accordance with g 192. 915;
(f) Schedule required by g 192. 933 that prioritizes the conditions found during an
assessment for evaluation and remediation, including technical justifications for the
schedule.



(g) Documents to carry out the requirements in g 192. 923 through g 192. 929 for a
direct assessment plan;
(h) Documents to carry out the requirements in g 192. 931 for confirmatory direct
assessment;
(i) Verification that an operator has provided any documentation or notification
required by this subpart to be provided to OPS, and when applicable, a State
authority with which OPS has an interstate agent agreement, and a State or local
pipeline safety authority that regulates a covered pipeline segment within that
State.
Records have not been maintained on HCA identification results, remediation decisions,
and preventive and mitigative measure decisions.
Evidence: These records were not available to the inspection team and could not be
obtained by Tesoro.
Under 49 United States Code, $ 60122, you are subject to a civil penalty not to exceed $100, 000
for each violation for each day the violation persists up to a maximum of $1, 000, 000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item(s) identified in this
letter. Failure to do so will result in Tesoro being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-200S-0004W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U. S. C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U. S, C. 552(b).
Sincerely,
Chris 'dal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Gilliam (¹120054)
Bernadette Frieh, PTTR Environmental Compliance Manager
- **truncated:** false