# FREEPORT-MCMORAN OIL & GAS — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 520097001
- **title:** FREEPORT-MCMORAN OIL & GAS — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2009-01-08
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.426.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520097001.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520097001.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520097001
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520097001
**body:**

Notice of Probable Violation involving FREEPORT-MCMORAN OIL & GAS. PHMSA's enforcement data identifies the cited regulation as 195.426. The case was opened on 2009-01-08 and is reported as closed as of 2011-01-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520097001_FinalOrder_01142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520097001/520097001_FinalOrder_01142011.pdf

520097001_FinalOrder_01142011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520097001/520097001_FinalOrder_01142011_text.pdf

520097001_NOPV PCO_01082009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520097001/520097001_NOPV%20PCO_01082009.pdf

520097001_NOPV PCO_01082009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520097001/520097001_NOPV%20PCO_01082009_text.pdf

520097001_operator_response_02112009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520097001/520097001_operator_response_02112009.pdf

520097001_FinalOrder_01142011_text.pdf

JAN 14 2011
Mr. James C. Flores
President and Chief Executive Officer
Plains Exploration & Production Company
700 Milam, Suite 3100
Houston, TX 77002
Re: CPF No. 5-2009-7001
Dear Mr. Flores:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws the
Notice of Probable Violation. Therefore, this case is now closed. Service of the Final Order by
certified mail is deemed effective upon the date of mailing, or as otherwise provided under 49
C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Chris Hoidal, Director, Western Region, PHMSA
Mr. Thomas B. Goeres
Operations Manager
Plains Exploration & Production Company
201 S. Broadway
Orcutt, CA 93455-4606
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [7005 1160 0001 0040 0023]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Plains Exploration & Production ) CPF No. 5-2009-7001
Company, )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On April 21-25 and May 5-9, 2008, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of Plains
Exploration & Production Company (PXP or Respondent) in Orcutt, California.
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated January 8, 2009, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that PXP had violated 49 C.F.R. § 195.426 and proposed ordering Respondent to take
certain measures to correct the alleged violation.
PXP responded to the Notice by letter dated February 11, 2009 (Response). The company
contested the allegation and offered additional information in response to the Notice.
Respondent did not request a hearing and therefore has waived its right to one.
FINDING OF VIOLATION
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.426, which states:
§ 195.426 – Scraper and sphere facilities
No operator may use a launcher or receiver that is not equipped with a
relief device capable of safely relieving pressure in the barrel before
insertion or removal of scrapers or spheres. The operator must use a
suitable device to indicate that pressure has been relieved in the barrel or
must provide a means to prevent insertion or removal of scrapers or
spheres if pressure has not been relieved in the barrel.



2
The Notice alleged that Respondent violated § 195.426 by using a receiver that was not equipped
with a relief device capable of safely relieving pressure in the barrel before insertion or removal
of scrapers or spheres. Specifically, the Notice alleged that the barrel of the receiver at PXP’s
Lompoc processing facility lacked a vent valve to the atmosphere, and that this could allow the
receiver to open under pressure.
In its Response, PXP objected to the allegation of violation. The company stated that the barrel
of its receiver was equipped with three relief valves that opened to the atmosphere, and that they
were capable of safely relieving pressure in the barrel before insertion or removal of scrapers or
spheres. PXP included with its Response a diagram of its receiver system showing the three
valves.
Based upon the information provided in PXP’s Response, I hereby order that the Notice be
withdrawn.
The Notice proposed a compliance order with respect to Item1. Because I have ordered that the
Notice be withdrawn, the proposed compliance terms are not included in this Order. However, I
would like to commend PXP for acting on OPS’s recommendation to install a valve immediately
downstream of the mainline trap valve to depressure upstream of the barrel in the event a pig
were to become stuck in the neck pipe.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety