# ISLAND ENERGY — Warning Letter

- **operation:** document
- **citation:** CPF 520100008W
- **title:** ISLAND ENERGY — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-02-12
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.16(d), 192.465(a), 192.465(b), 192.605(b)(8), 192.615(c), 192.739(a), 192.747(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520100008w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520100008w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520100008w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520100008W
**body:**

Warning Letter involving ISLAND ENERGY. PHMSA's enforcement data identifies the cited regulations as 192.16(d),  192.465(a),  192.465(b),  192.605(b)(8),  192.615(c),  192.739(a),  192.747(a). The case was opened on 2010-02-12 and is reported as closed as of 2010-02-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520100008W_warning letter_02122010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100008W/520100008W_warning%20letter_02122010.pdf

520100008W_warning letter_02122010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100008W/520100008W_warning%20letter_02122010_text.pdf

520100008W_warning letter_02122010_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 12, 2010
Mr. David Elder
General Manager
Island Energy
440 Walnut Avenue
Mare Island, CA 94592-0001
CPF 5-2010-0008W
Dear Mr. Elder:
On December 15 - 16, 2009, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected your
gas distribution system at Mare Island, California.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violations are:
1. §192.605 Procedural Manual for operations, maintenance, and emergencies.
(b) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following, if applicable, to provide
safety during maintenance and operations.
(8) Periodically reviewing the work done by operator personnel to determine the
effectiveness and adequacy of the procedures used in normal operation and
maintenance and modifying the procedures when deficiencies are found.



There were no records available at the time of the inspection to document periodic review of the
work done by operator’s personnel to determine the effectiveness and adequacy of procedures.
2. §192.615 Emergency plans.
(c) Each operator shall establish and maintain liaison with appropriate fire, police,
and other public officials to:
(1) Learn the responsibility and resources of each government organization that
may respond to a gas pipeline emergency;
(2) Acquaint the officials with the operator’s ability in responding to a gas pipeline
emergency;
(3) Identify the types of gas pipeline emergencies of which the operator notifies the
official; and
(4) Plan how the operator and officials can engage in mutual assistance to
minimize hazards to life or property.
There were no records available at the time of the inspection to document required liaison
activities had been performed.
3. §192.465 External corrosion control: Monitoring.
(a) Each pipeline that is under cathodic protection must be tested at least once each
calendar year, but with intervals not exceeding 15 months, to determine whether
the cathodic protection meets the requirements of §192.463. However, if tests at
those intervals are impractical for separately protected short sections of mains or
transmission line, not in excess of 100 feet (30 meters), or separately protected
service line, these pipelines may be surveyed on a sampling basis. At least 10
percent of these protected structures, distributed over the entire system must be
surveyed each calendar year, with a different 10 percent checked each subsequent
year, so that the entire system is tested in each 10-year period.
Records were unavailable at the time of the inspection to document compliance with the
inspection and testing requirements for corrosion control. Only a few recorded readings could
be found.
4. §192.465 External corrosion control: Monitoring.
(b) Each cathodic protection rectifier or other impressed current power source
must be inspected six times each calendar year, but with intervals not exceeding 2
½ months.
2



Records were unavailable at the time of the inspection to document compliance with the
inspection and testing requirements for corrosion control. Only a few recorded readings could
be found.
5. §192.16 Customer Notification.
(d) Each operator must make the following records available for inspection by the
Administrator or a State agency participating under 49 U.S.C. 60105 or 60106:
(1) A copy of the notice currently in use; and
(2) Evidence that notices have been sent to customers within the previous 3 years.
No records pertaining to customer notification were available during the inspection.
6. §192.739 Pressure Limiting and regulating stations: Inspection and testing.
(a) Each pressure limiting stations, relief device (except rupture discs), and
pressure regulating station and its equipment must be subjected at intervals not
exceeding 15 months, but at least once each calendar year, to inspections and tests
to determine that it is-
(1) In good mechanical condition;
(2) Adequate from the standpoint of capacity and reliability of operation for the
service in which it is employed.
(3)Except as provided in paragraph (b) of this section, set to control or relieve at
the correct pressure consistent with the pressure limits of §192.201(a);
No documentation of required pressure regulator and monitor testing for calendar years 2006
and 2007 was available during the inspection.
7. §192.747 Valve maintenance: Distribution systems.
(a) Each valve, the use of which may be necessary for the safe operation of a
distribution system, must be checked and serviced at intervals not exceeding 15
months, but at least once each calendar year.
No documentation of required valve maintenance for calendar years 2006 and 2007 was
available during the inspection.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $100,000
for each violation for each day the violation persists up to a maximum of $1,000,000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
3



assessment proceedings at this time. We advise you to correct the items identified in this letter.
Failure to do so will result in Island Energy being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-2010-0008W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Stahoviak (#123931)
4