# HILCORP NORTH SLOPE, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 520100015M
- **title:** HILCORP NORTH SLOPE, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-09-21
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(b)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520100015m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520100015m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520100015m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520100015M
**body:**

Notice of Amendment involving HILCORP NORTH SLOPE, LLC. PHMSA's enforcement data identifies the cited regulation as 192.605(b)(3). The case was opened on 2010-09-21 and is reported as closed as of 2010-12-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520100015M_closure letter_12162010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100015M/520100015M_closure%20letter_12162010.pdf

520100015M_closure letter_12162010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100015M/520100015M_closure%20letter_12162010_text.pdf

520100015M_notice of amendment_09212010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100015M/520100015M_notice%20of%20amendment_09212010.pdf

520100015M_notice of amendment_09212010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100015M/520100015M_notice%20of%20amendment_09212010_text.pdf

520100015M_operator response to NOA_10202010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100015M/520100015M_operator%20response%20to%20NOA_10202010.pdf

520100015M_closure letter_12162010_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 16, 2010
Mr. Greg Mattson
BP Exploration Alaska
P.O. Box 196612
900 E. Benson Blvd.
Anchorage, Alaska 99519
CPF 5-2010-0015M
Dear Mr. Mattson:
On July 27-29, 2010, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-
site pipeline safety inspection of BP Exploration Alaska's procedures for the Badami Natural Gas
Transmission Pipeline in Prudhoe Bay, Alaska.
As a result of the inspection, BP Exploration Alaska was issued a Notice of Amendment on
September 21, 2010, which proposed amendment of your procedures.
BP Exploration Alaska submitted its amended procedures on October 20, 2010. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Cc: PHP-60 Compliance Registry
B. Flanders (#130728)

520100015M_notice of amendment_09212010_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [7007 2560 0000 7825 9471]
September 21, 2010
Mr. Greg Mattson
VP, HSSE & Engineering
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
CPF 5-2010-0015M
Dear Mr. Mattson:
On July 27-29, 2010, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected BP
Exploration Alaska’s (BPXA) procedures for the Badami Natural Gas Transmission Pipeline
in Prudhoe Bay, Alaska.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
BPXA plans or procedures, as described below:
1. §192.605 Procedural manual for operations, maintenance, and emergencies
(b) (3) Making construction records, maps, and operating history available to
appropriate operating personnel. (3) Making construction records, maps, and
operating history available to appropriate operating personnel.
A. The Pipeline Alignment Sheet (G 254) indicated that the pipe wall thickness was .432
inches for the entire pipeline. The Badami Pipeline Site Specific DOT Operations,
Maintenance, Emergency Response (OMER) Manual lists the belowground river
crossings (Kadleroshilih, Shaviovik, and Sagavanirkok river crossings) as .432 wall
thickness and the rest of the pipeline as .375 wall thickness. During the field
inspection, pipe was found marked .432 wall thickness at the cased crossing at
Badami, and .375 along the causeway. The alignment sheets need to indicate the
actual wall thickness of the pipeline.
B. The Operator’s Badami Natural Gas pipelines, DOT Operation, Maintenance,
Emergency Response Manual (OMER) was found in need of updating as follows:



1. Page 5, “Physical Description” indicate that the Technical Specifications are
found in Appendix F ( they are found in Appendix A), DOT equipment are found
in appendix G (they are found in appendix B) and DOT boundaries are in
appendix H ( they are in appendix C)
2. Page 27, Appendix A, Technical Specifications indicate that the valves are rated
ANSI 600 #. This not consistent with the MAOP or the flange rating.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged
in this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 90 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
In correspondence concerning this matter, please refer to CPF 5-2010-0015M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
B. Flanders (#130728)
2
- **truncated:** false