{"operation":"document","citation":"CPF 520105017H","title":"ALYESKA PIPELINE SERVICE CO — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2010-05-27","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520105017h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520105017h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520105017h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520105017H","body":"Corrective Action Order involving ALYESKA PIPELINE SERVICE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2010-05-27 and is reported as closed as of 2012-04-03. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520105017H_CAO_05272010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_CAO_05272010.pdf\n\n520105017H_CAO_05272010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_CAO_05272010_text.pdf\n\n520105017H_closure letter_04032012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_closure%20letter_04032012.pdf\n\n520105017H_closure letter_04032012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_closure%20letter_04032012_text.pdf\n\n520105017H_closure letter_04032012_text.pdf\n\nCERTIFIED MAIL – RETURN RECEIPT REQUESTED\nApril 3, 2012\nMr. Mike Joynor\nVice President, Operations\nAlyeska Pipeline Service Company\n3700 Centerpoint Drive\nP.O. Box 196660, MS 502\nAnchorage, AK 99519-6660\nRE: Closure of Corrective Action Order\nCPF 5-2010-5017H\nDear Mr. Joynor:\nOn May 27, 2010, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued\na Corrective Action Order (CAO) in the above-referenced case. The CAO required Alyeska\nPipeline Service Company (Alyeska) to take corrective actions on the Trans-Alaska Pipeline\nSystem (TAPS) and at Pump Station 9 (PS09) to protect public property and the environment\nfrom the hazards associated with the operation of your hazardous liquids pipeline system.\nHaving reviewed the records and the work performed on TAPS at PS09, PHMSA has determined\nthat Alyeska has satisfactorily complied with the terms of the CAO. Therefore, in accordance\nwith Item 7 of the CAO, I approve the submissions and this case is now closed.\nThank you for your cooperation in this matter.\nSincerely,\nChris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-Alaska (#130193)","truncated":false,"body_characters":2099}