# ALYESKA PIPELINE SERVICE CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 520105017H
- **title:** ALYESKA PIPELINE SERVICE CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-05-27
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105017h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105017h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105017h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520105017H
**body:**

Corrective Action Order involving ALYESKA PIPELINE SERVICE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2010-05-27 and is reported as closed as of 2012-04-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520105017H_CAO_05272010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_CAO_05272010.pdf

520105017H_CAO_05272010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_CAO_05272010_text.pdf

520105017H_closure letter_04032012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_closure%20letter_04032012.pdf

520105017H_closure letter_04032012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105017H/520105017H_closure%20letter_04032012_text.pdf

520105017H_closure letter_04032012_text.pdf

CERTIFIED MAIL – RETURN RECEIPT REQUESTED
April 3, 2012
Mr. Mike Joynor
Vice President, Operations
Alyeska Pipeline Service Company
3700 Centerpoint Drive
P.O. Box 196660, MS 502
Anchorage, AK 99519-6660
RE: Closure of Corrective Action Order
CPF 5-2010-5017H
Dear Mr. Joynor:
On May 27, 2010, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
a Corrective Action Order (CAO) in the above-referenced case. The CAO required Alyeska
Pipeline Service Company (Alyeska) to take corrective actions on the Trans-Alaska Pipeline
System (TAPS) and at Pump Station 9 (PS09) to protect public property and the environment
from the hazards associated with the operation of your hazardous liquids pipeline system.
Having reviewed the records and the work performed on TAPS at PS09, PHMSA has determined
that Alyeska has satisfactorily complied with the terms of the CAO. Therefore, in accordance
with Item 7 of the CAO, I approve the submissions and this case is now closed.
Thank you for your cooperation in this matter.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-Alaska (#130193)
- **truncated:** false
- **body characters:** 2099
