# HILCORP NORTH SLOPE, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 520105024M
- **title:** HILCORP NORTH SLOPE, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-09-21
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.404(a)(4), 195.589(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105024m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105024m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105024m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520105024M
**body:**

Notice of Amendment involving HILCORP NORTH SLOPE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.404(a)(4),  195.589(a). The case was opened on 2010-09-21 and is reported as closed as of 2010-12-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520105024M_closure letter_12162010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105024M/520105024M_closure%20letter_12162010.pdf

520105024M_closure letter_12162010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105024M/520105024M_closure%20letter_12162010_text.pdf

520105024M_notice of amendment_09212010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105024M/520105024M_notice%20of%20amendment_09212010.pdf

520105024M_notice of amendment_09212010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105024M/520105024M_notice%20of%20amendment_09212010_text.pdf

520105024M_operator response to NOA_10202010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105024M/520105024M_operator%20response%20to%20NOA_10202010.pdf

520105024M_closure letter_12162010_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 16, 2010
Mr. Greg Mattson
VP, HSSE & Engineering
BP Exploration Alaska
P.O. Box 196612
900 E. Benson Blvd.
Anchorage, Alaska 99519
CPF 5-2010-5024M
Dear Mr. Mattson:
On July 27-29, 2010, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-
site pipeline safety inspection of BP Exploration Alaska’s procedures for the Badami Sales Oil
Pipeline in Prudhoe Bay, Alaska.
As a result of the inspection, BP Exploration Alaska was issued a Notice of Amendment on
September 21, 2010, which proposed amendment of your procedures.
BP Exploration Alaska submitted its amended procedures on October 20, 2010. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
B. Flanders (#130730)

520105024M_notice of amendment_09212010_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [7007 2560 0000 7825 9471]
September 21, 2010
Mr. Greg Mattson
VP, HSSE & Engineering
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
CPF 5-2010-5024M
Dear Mr. Mattson:
On July 27-29, 2010, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected BP
Exploration Alaska’s (BPXA) procedures for the Badami Sales Oil Pipeline in Prudhoe Bay,
Alaska.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
BPXA plans or procedures, as described below:
1. §195.589 What corrosion control information do I have to maintain?
(a) You must maintain current records or maps to show the location of--
(1) Cathodically protected pipelines;
(2) Cathodic protection facilities, including galvanic anodes, installed after
January 28, 2002; and
(3) Neighboring structures bonded to cathodic protection systems.
The Operator’s maps and records did not indicate locations of all the insulation flanges.
2. §195.404(a)(4) Maps and Records.
a) Each operator shall maintain current maps and records of its pipeline



systems that include at least the following information;
(4) The diameter, grade, type and nominal wall thickness of all pipe.
The Pipeline alignment sheets (P244) indicated that the pipe wall thickness was .281 inches
on sheet 29, 46, and 47(below ground river crossings). These sheets should indicate the
correct wall thickness.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged
in this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 90 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
In correspondence concerning this matter, please refer to CPF 5-2010-5024M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
B. Flanders (#130730)