{"operation":"document","citation":"CPF 520105032H","title":"CHEVRON PIPE LINE CO — Corrective Action Order","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2010-12-08","effective_on":null,"summary":"CLOSED corrective action order.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520105032h.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520105032h.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520105032h","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520105032H","body":"Corrective Action Order involving CHEVRON PIPE LINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2010-12-08 and is reported as closed as of 2013-02-12. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520105032H_CAO_12082010 .pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_CAO_12082010%20.pdf\n\n520105032H_CAO_12082010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_CAO_12082010_text.pdf\n\n520105032H_closure letter_ 02122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_closure%20letter_%2002122013_text.pdf\n\n520105032H_closure letter_02122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_closure%20letter_02122013.pdf\n\n520105032H_closure letter_02122013.pdf\n\nu.s. Department\nof Transportation\nPipeline and\nHazardous Materials Safety\nAdministration\n12300 W. Dakota Ave., Suite 110\nLakewood, CO 80228\nCERTIFIED MAIL- RETURN RECEIPT REQUESTED\nFebruary 12, 2013\nMr. Randall Curry\nPresident\nChevron Pipe Line Company\n4800 Fournace Place\nBellaire, TX 77401-2324\nCPF 5-2010-5032H\nClosure Letter\nDear Mr. Curry:\nOn December 8, 2010, the Associate Administrator for Pipeline Safety, Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), formerly the Research and Special Programs\nAdministration, issued a Corrective Action Order (CAO) in the above-referenced case. The\nCAO required Chevron Pipe Line Company to take immediate corrective actions with respect to\nits Rangely to Salt Lake City Number 2 crude oil pipeline system, which experienced a failure on\nDecember 1, 2010. After review of the records and the work performed on this pipeline system,\nthe Director of the Western Region, PHMSA, has determined that Chevron Pipe Line Company\nhas satisfactorily complied with the terms of that CAO.\nAccordingly, this case is now closed and no further action is contemplated with respect to the\nmatters involved in this case. Thank you for your cooperation in this matter.\n/lj.d/ (\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 Mulligan/Nguyen\nMr. Gary Saenz, Chevron Pipe Line Company\n\n520105032H_closure letter_ 02122013_text.pdf\n\nCERTIFIED MAIL – RETURN RECEIPT REQUESTED\nFebruary 12, 2013\nMr. Randall Curry\nPresident\nChevron Pipe Line Company\n4800 Fournace Place\nBellaire, TX 77401-2324\nCPF 5-2010-5032H\nClosure Letter\nDear Mr. Curry:\nOn December 8, 2010, the Associate Administrator for Pipeline Safety, Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), formerly the Research and Special Programs\nAdministration, issued a Corrective Action Order (CAO) in the above-referenced case. The\nCAO required Chevron Pipe Line Company to take immediate corrective actions with respect to\nits Rangely to Salt Lake City Number 2 crude oil pipeline system, which experienced a failure on\nDecember 1, 2010. After review of the records and the work performed on this pipeline system,\nthe Director of the Western Region, PHMSA, has determined that Chevron Pipe Line Company\nhas satisfactorily complied with the terms of that CAO.\nAccordingly, this case is now closed and no further action is contemplated with respect to the\nmatters involved in this case. Thank you for your cooperation in this matter.\nSincerely,\nChris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 Mulligan/Nguyen\nMr. Gary Saenz, Chevron Pipe Line Company","truncated":false,"body_characters":3624}