# CHEVRON PIPE LINE CO — Corrective Action Order

- **operation:** document
- **citation:** CPF 520105032H
- **title:** CHEVRON PIPE LINE CO — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-12-08
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105032h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105032h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520105032h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520105032H
**body:**

Corrective Action Order involving CHEVRON PIPE LINE CO. The dataset does not identify a cited regulation for this case. The case was opened on 2010-12-08 and is reported as closed as of 2013-02-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520105032H_CAO_12082010 .pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_CAO_12082010%20.pdf

520105032H_CAO_12082010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_CAO_12082010_text.pdf

520105032H_closure letter_ 02122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_closure%20letter_%2002122013_text.pdf

520105032H_closure letter_02122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520105032H/520105032H_closure%20letter_02122013.pdf

520105032H_closure letter_02122013.pdf

u.s. Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
12300 W. Dakota Ave., Suite 110
Lakewood, CO 80228
CERTIFIED MAIL- RETURN RECEIPT REQUESTED
February 12, 2013
Mr. Randall Curry
President
Chevron Pipe Line Company
4800 Fournace Place
Bellaire, TX 77401-2324
CPF 5-2010-5032H
Closure Letter
Dear Mr. Curry:
On December 8, 2010, the Associate Administrator for Pipeline Safety, Pipeline and Hazardous
Materials Safety Administration (PHMSA), formerly the Research and Special Programs
Administration, issued a Corrective Action Order (CAO) in the above-referenced case. The
CAO required Chevron Pipe Line Company to take immediate corrective actions with respect to
its Rangely to Salt Lake City Number 2 crude oil pipeline system, which experienced a failure on
December 1, 2010. After review of the records and the work performed on this pipeline system,
the Director of the Western Region, PHMSA, has determined that Chevron Pipe Line Company
has satisfactorily complied with the terms of that CAO.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
/lj.d/ (
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 Mulligan/Nguyen
Mr. Gary Saenz, Chevron Pipe Line Company

520105032H_closure letter_ 02122013_text.pdf

CERTIFIED MAIL – RETURN RECEIPT REQUESTED
February 12, 2013
Mr. Randall Curry
President
Chevron Pipe Line Company
4800 Fournace Place
Bellaire, TX 77401-2324
CPF 5-2010-5032H
Closure Letter
Dear Mr. Curry:
On December 8, 2010, the Associate Administrator for Pipeline Safety, Pipeline and Hazardous
Materials Safety Administration (PHMSA), formerly the Research and Special Programs
Administration, issued a Corrective Action Order (CAO) in the above-referenced case. The
CAO required Chevron Pipe Line Company to take immediate corrective actions with respect to
its Rangely to Salt Lake City Number 2 crude oil pipeline system, which experienced a failure on
December 1, 2010. After review of the records and the work performed on this pipeline system,
the Director of the Western Region, PHMSA, has determined that Chevron Pipe Line Company
has satisfactorily complied with the terms of that CAO.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 Mulligan/Nguyen
Mr. Gary Saenz, Chevron Pipe Line Company
- **truncated:** false
- **body characters:** 3624