# CITY OF VERNON — Notice of Amendment

- **operation:** document
- **citation:** CPF 520110007M
- **title:** CITY OF VERNON — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-02-25
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.605(b)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110007m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110007m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110007m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520110007M
**body:**

Notice of Amendment involving CITY OF VERNON. PHMSA's enforcement data identifies the cited regulation as 192.605(b)(4). The case was opened on 2011-02-25 and is reported as closed as of 2012-01-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520110007M_closure letter_01182012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110007M/520110007M_closure%20letter_01182012.pdf

520110007M_closure letter_01182012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110007M/520110007M_closure%20letter_01182012_text.pdf

520110007M_notice of amendment_02252011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110007M/520110007M_notice%20of%20amendment_02252011.pdf

520110007M_notice of amendment_02252011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110007M/520110007M_notice%20of%20amendment_02252011_text.pdf

520110007M_Operator_Response_Notice_11042010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110007M/520110007M_Operator_Response_Notice_11042010.pdf

520110007M_closure letter_01182012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 18, 2012
Mr. Carlos Fandino
Director
City of Vernon
Light and Power Department
4305 Santa Fe Avenue
Vernon, CA 90058
CPF 5-2011-0007M
Dear Mr. Fandino:
On August 16 to 19 and on November 3, 2010, a representative from the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United
States Code, conducted an on-site pipeline safety inspection of City of Vernon procedures in
Vernon, California. As a result of the inspection, City of Vernon was issued a Notice of
Amendment on February 25, 2011, which proposed amendment of your procedures.
The City of Vernon submitted its amended procedures to PHMSA and my staff has reviewed
the amended procedures. It appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 P. Nguyen

520110007M_notice of amendment_02252011_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 25, 2011
Mr. Carlos Fandino
Director
City of Vernon
Light and Power Department
4305 Santa Fe Avenue
Vernon, CA 90058
CPF 5-2011-0007M
Dear Mr. Fandino:
On August 16 to 19, and on November 3, 2010, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected manuals and
records, and conducted a field audit of your pipeline facilities in Vernon, California.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within the City
Operations, Inspection and Maintenance Plans, as described below:
1. §192.605 Procedural manual for operations, maintenance, and emergencies.
(b) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following, if applicable, to provide safety during
maintenance and operations.
(4) Gathering of data needed for reporting incidents under Part 191 of this chapter in a
timely and effective manner.
The City Operations, Inspection and Maintenance Plans (May 27, 2010 revision) or the Gas Emergency
Operating Plan (August 8, 2010 revision) did not include the following reporting procedures required
under 49 CFR Part 191:



(a) The telephone number 800-424-8802 to report incidents under § 191.5 (b).
(b) A supplemental report under § 191.15(b).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as part of
this Notice is a document entitled Response Options for Pipeline Operators in Compliance Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit in
response to this enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with
the complete original document you must provide a second copy of the document with the portions you
believe qualify for confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30
days of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this Notice,
you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R. § 190.237).
If you are not contesting this Notice, we propose that you submit your amended procedures to my office
within 30 days of receipt of this Notice. This period may be extended by written request for good cause.
Once the inadequacies identified herein have been addressed in your amended procedures, this
enforcement action will be closed.
It is requested (not mandated) that The City of Vernon maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and
submit the total to Chris Hoidal, Director, Western Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 5-2011-0007M and, for
each document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 P. Nguyen (#128473)
- **truncated:** false