# ENSTAR NATURAL GAS CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 520110023M
- **title:** ENSTAR NATURAL GAS CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-10-25
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.1007(a), 192.1007(b), 192.1007(e)(1), 192.1007(f).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110023m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110023m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110023m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520110023M
**body:**

Notice of Amendment involving ENSTAR NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulations as 192.1007(a),  192.1007(b),  192.1007(e)(1),  192.1007(f). The case was opened on 2011-10-25 and is reported as closed as of 2012-07-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520110023M_closure letter_07032012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110023M/520110023M_closure%20letter_07032012.pdf

520110023M_closure letter_07032012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110023M/520110023M_closure%20letter_07032012_text.pdf

520110023M_notice of amendment_10252011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110023M/520110023M_notice%20of%20amendment_10252011.pdf

520110023M_notice of amendment_10252011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110023M/520110023M_notice%20of%20amendment_10252011_text.pdf

520110023M_Operator Response_01232012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110023M/520110023M_Operator%20Response_01232012.pdf

520110023M_closure letter_07032012_text.pdf

VIA UPS GROUND – 1Z WR2 588 03 9534 5430
July 3, 2012
Mr. David Bredin
Director of Operations
ENSTAR Natural Gas Company
401 East International Airport Road
P.O. Box 190288
Anchorage, AK 99519-0288
CPF 5-2011-0023M
Dear Mr. Bredin:
On September 19-22, 2011, a representative from the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of ENSTAR Natural Gas Company’s
(ENSTAR) procedures in Anchorage, Alaska. As a result of the inspection, ENSTAR was
issued a Notice of Amendment on October 25, 2011, which proposed amendment of your
procedures.
ENSTAR submitted its amended procedures on January 23, 2012. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Strawn (#136011)

520110023M_notice of amendment_10252011_text.pdf

NOTICE OF AMENDMENT
VIA UPS GROUND
October 25, 2011
Mr. David Bredin
Director of Operations
ENSTAR Natural Gas Company
401 East International Airport Road
P.O. Box 190288
Anchorage, AK 99519-0288
CPF 5-2011-0023M
Dear Mr. Frantz:
On September 19-22, 2011, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected
ENSTAR Natural Gas Company’s (ENSTAR) procedures and records for Distribution
Integrity Management Program (DIMP) in Anchorage, Alaska.
On the basis of the inspections, PHMSA has identified the apparent inadequacies found
within ENSTAR’s DIMP as described below:
1. §192.1007 What are the required elements of an integrity management plan? A
written integrity management plan must contain procedures for developing and
implementing the following elements:
(a) Knowledge. An operator must demonstrate an understanding of its gas
distribution system developed from reasonably available information.
(1) Identify the characteristics of the pipeline's design and operations and the
environmental factors that are necessary to assess the applicable threats and
risks to its gas distribution pipeline.
(2) Consider the information gained from past design, operations, and
maintenance.



(3) Identify additional information needed and provide a plan for gaining that
information over time through normal activities conducted on the pipeline (for
example, design, construction, operations or maintenance activities).
(4) Develop and implement a process by which the IM program will be reviewed
periodically and refined and improved as needed.
(5) Provide for the capture and retention of data on any new pipeline installed.
The data must include, at a minimum, the location where the new pipeline is
installed and the material of which it is constructed.
ENSTAR must add detail to the procedure describing the methods and data sources used to
gather information and knowledge of the system from reasonably available sources of
information (e.g., subject matter experts consulted; Standard Operating Procedures;
Operations, Maintenance, and Inspection forms; records; system information).
2. §192.1007 What are the required elements of an integrity management plan? A
written integrity management plan must contain procedures for developing and
implementing the following elements:
(b) Identify threats. The operator must consider the following categories of
threats to each gas distribution pipeline: Corrosion, natural forces, excavation
damage, other outside force damage, material, weld or joint failure (including
compression coupling), equipment failure, incorrect operation, and other
concerns that could threaten the integrity of its pipeline. An operator must
consider reasonably available information to identify existing and potential
threats. Sources of data may include, but are not limited to, incident and leak
history, corrosion control records, continuing surveillance records, pa-trolling
records, maintenance history, and excavation damage experience.
ENSTAR must add detail to the procedure used to identify existing and potential threats that
describes how subject matter expert(s) gathered and input information into the SHRIMP
application for the threat assessment.
The procedure must detail how ENSTAR considers all available information for the threat
assessment including all leak data, corrosion control inspection, and other inspection and
maintenance documentation.
3. §192.1007 What are the required elements of an integrity management plan? A
written integrity management plan must contain procedures for developing and
implementing the following elements:
(e) Measure performance, monitor results, and evaluate effectiveness.
(1) Develop and monitor performance measures from an established baseline to
evaluate the effectiveness of its IM program. An operator must consider the
results of its performance monitoring in periodically re-evaluating the threats
and risks. These performance measures must include the following:
2



(i) Number of hazardous leaks either eliminated or repaired as required by
§192.703(c) of this subchapter (or total number of leaks if all leaks are repaired
when found), categorized by cause;
(ii) Number of excavation damages;
(iii) Number of excavation tickets (receipt of information by the underground
facility operator from the notification center);
(iv) Total number of leaks either eliminated or repaired, categorized by cause;
(v) Number of hazardous leaks either eliminated or repaired as required by
§192.703(c) (or total number of leaks if all leaks are repaired when found),
categorized by material; and
(vi) Any additional measures the operator determines are needed to evaluate the
effectiveness of the operator's IM program in controlling each identified threat.
ENSTAR must modify their DIMP to include procedures for establishing baselines for
performance measures from which to monitor effectiveness of its DIMP.
4. §192.1007 What are the required elements of an integrity management plan? A
written integrity management plan must contain procedures for developing and
implementing the following elements:
(f) Periodic Evaluation and Improvement. An operator must re-evaluate threats
and risks on its entire pipe-line and consider the relevance of threats in one
location to other areas. Each operator must determine the appropriate period
for conducting complete program evaluations based on the complexity of its
system and changes in factors affecting the risk of failure. An operator must
conduct a complete program re-evaluation at least every five years. The
operator must consider the results of the performance monitoring in these
evaluations.
ENSTAR must modify their DIMP and describe, in detail, how ENSTAR will conduct a
periodic evaluation.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
3



allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged
in this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 45 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
It is requested (not mandated) that ENSTAR maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision
of plans, procedures) and submit the total to Dennis Hinnah, Deputy Director, Western
Region, Pipeline and Hazardous Materials Safety Administration.
In correspondence concerning this matter, please refer to CPF 5-2011-0023M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 J. Strawn (#136011)
4
- **truncated:** false
- **body characters:** 10628