{"operation":"document","citation":"CPF 520110024M","title":"SUNRISE POWER COMPANY, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-08-23","effective_on":null,"summary":"CLOSED notice of amendment citing 192.485, 192.605(a), 192.613(b), 192.703, 192.713, 192.715, 192.717, 192.719.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520110024m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520110024m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520110024m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520110024M","body":"Notice of Amendment involving SUNRISE POWER COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 192.485,  192.605(a),  192.613(b),  192.703,  192.713,  192.715,  192.717,  192.719. The case was opened on 2012-08-23 and is reported as closed as of 2013-04-12. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520110024M_Closure Letter_04122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Closure%20Letter_04122013.pdf\n\n520110024M_Closure Letter_04122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Closure%20Letter_04122013_text.pdf\n\n520110024M_NOA_11212011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_NOA_11212011.pdf\n\n520110024M_NOA_11212011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_NOA_11212011_text.pdf\n\n520110024M_Operator Response_09122012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Operator%20Response_09122012.pdf\n\n520110024M_Revised NOA_08232012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Revised%20NOA_08232012.pdf\n\n520110024M_Revised NOA_08232012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Revised%20NOA_08232012_text.pdf\n\n520110024M_Closure Letter_04122013_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nApril 12, 2013\nMr. David King\nPlant Manager\nEdison Mission Operations and Maintenance\nSunrise Power Company, LLC\nPO Box 5485\nBakersfield, CA 93388-5484\nCPF 5-2011-0024M\nClosure Letter\nDear Mr. King:\nOn June 13-17, 2011, a representative from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an\non-site pipeline safety inspection of Edison Mission Operations and Maintenance procedures\nin Fellows, California. As a result of the inspection, Edison Mission was issued a Notice of\nAmendment, CPF 5-2011-0024M, on August 23, 2012, which proposed amendment of your\nprocedures.\nEdison Mission submitted its amended procedures on September 12, 2012. My staff reviewed\nthe amended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nChris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP–60 Compliance Registry\nPHP-500 C. Lee (#132891)","truncated":false,"body_characters":2604}