# SUNRISE POWER COMPANY, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 520110024M
- **title:** SUNRISE POWER COMPANY, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-08-23
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.485, 192.605(a), 192.613(b), 192.703, 192.713, 192.715, 192.717, 192.719.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110024m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110024m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520110024m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520110024M
**body:**

Notice of Amendment involving SUNRISE POWER COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 192.485,  192.605(a),  192.613(b),  192.703,  192.713,  192.715,  192.717,  192.719. The case was opened on 2012-08-23 and is reported as closed as of 2013-04-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520110024M_Closure Letter_04122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Closure%20Letter_04122013.pdf

520110024M_Closure Letter_04122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Closure%20Letter_04122013_text.pdf

520110024M_NOA_11212011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_NOA_11212011.pdf

520110024M_NOA_11212011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_NOA_11212011_text.pdf

520110024M_Operator Response_09122012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Operator%20Response_09122012.pdf

520110024M_Revised NOA_08232012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Revised%20NOA_08232012.pdf

520110024M_Revised NOA_08232012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520110024M/520110024M_Revised%20NOA_08232012_text.pdf

520110024M_Closure Letter_04122013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 12, 2013
Mr. David King
Plant Manager
Edison Mission Operations and Maintenance
Sunrise Power Company, LLC
PO Box 5485
Bakersfield, CA 93388-5484
CPF 5-2011-0024M
Closure Letter
Dear Mr. King:
On June 13-17, 2011, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an
on-site pipeline safety inspection of Edison Mission Operations and Maintenance procedures
in Fellows, California. As a result of the inspection, Edison Mission was issued a Notice of
Amendment, CPF 5-2011-0024M, on August 23, 2012, which proposed amendment of your
procedures.
Edison Mission submitted its amended procedures on September 12, 2012. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP–60 Compliance Registry
PHP-500 C. Lee (#132891)