{"operation":"document","citation":"CPF 520115016M","title":"CENEX PIPELINE LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2011-12-30","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(c)(3), 195.402(d)(1), 195.505(b), 195.505(i), 195.58(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520115016m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520115016m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520115016m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520115016M","body":"Notice of Amendment involving CENEX PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(3),  195.402(d)(1),  195.505(b),  195.505(i),  195.58(a). The case was opened on 2011-12-30 and is reported as closed as of 2012-04-20. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520115016M_closure letter_04202012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115016M/520115016M_closure%20letter_04202012.pdf\n\n520115016M_closure letter_04202012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115016M/520115016M_closure%20letter_04202012_text.pdf\n\n520115016M_NOA_12302011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115016M/520115016M_NOA_12302011.pdf\n\n520115016M_NOA_12302011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115016M/520115016M_NOA_12302011_text.pdf\n\n520115016M_operator response_02292012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115016M/520115016M_operator%20response_02292012.pdf\n\n520115016M_closure letter_04202012_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nApril 20, 2012\nMr. John Traeger\nManager, Pipelines and Terminals\nCenex Pipeline Company\n803 Highway 212 South\nP.O. Box 909\nLaurel, MT 59044-0909\nCPF 5-2011-5016M\nDear Mr. Traeger:\nOn August 16 through September 3, 2010, a representative of the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,\ninspected Cenex Pipeline Company’s (Cenex) operation and maintenance procedures in Laurel,\nMontana. As a result of the inspection, Cenex was issued a Notice of Amendment on\nDecember 30, 2011, which proposed amendment of your operation and maintenance procedures.\nCenex responded with amended procedures on February 29, 2012 and on April 17, 2012. My\nstaff reviewed the amended procedures, and it appears that the inadequacies outlined in this\nNotice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nChris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 G. Davis (#129363)","truncated":false,"body_characters":2279}