# ALYESKA PIPELINE SERVICE CO — Warning Letter

- **operation:** document
- **citation:** CPF 520115021W
- **title:** ALYESKA PIPELINE SERVICE CO — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-12-14
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.452(j)(2), 195.579(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520115021w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520115021w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520115021w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520115021W
**body:**

Warning Letter involving ALYESKA PIPELINE SERVICE CO. PHMSA's enforcement data identifies the cited regulations as 195.452(j)(2),  195.579(b)(2). The case was opened on 2011-12-14 and is reported as closed as of 2011-12-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520115021W_operator_response_01132012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115021W/520115021W_operator_response_01132012.pdf

520115021W_warning letter_12142011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115021W/520115021W_warning%20letter_12142011.pdf

520115021W_warning letter_12142011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115021W/520115021W_warning%20letter_12142011_text.pdf

520115021W_warning letter_12142011_text.pdf

WARNING LETTER
VIA UPS GROUND
December 14, 2011
Mr. Mike Joynor
Pipeline Vice President
Alyeska Pipeline Service Company
900 East Benson Blvd.
P.O. Box 196660
Anchorage, AK 99519-6660
CPF 5-2011-5021W
Dear Mr. Joynor:
On June 13, 2011, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected
Alyeska Pipeline Service Company’s (Alyeska) pipeline segment between Milepost 367 and
Milepost 496, including Pump Stations 7 & 8, in Alaska.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violations are:
1. §195.452 Pipeline integrity management in high consequence areas.
(j) What is a continual process of evaluation and assessment to maintain a
pipeline's integrity?—
(2) Evaluation. An operator must conduct a periodic evaluation as
frequently as needed to assure pipeline integrity. An operator must base
the frequency of evaluation on risk factors specific to its pipeline,
including the factors specified in paragraph (e) of this section. The
evaluation must consider the results of the baseline and periodic integrity
assessments, information analysis (paragraph (g) of this section), and



decisions about remediation, and preventive and mitigative actions
(paragraphs (h) and (i) of this section).
Alyeska has not included the barrel sleeve at Mile Post 457.53 in its continual process of
evaluation and assessment. During the inspection on June 15, 2011, OPS observed the barrel
sleeve at Mile Post 457.53 on the mainline and requested that Alyeska provide information
concerning internal corrosion inspection on this sleeve. OPS sent a formal request for the
same information to Alyeska in a Request for Specific Information on July 5, 2011.
Alyeska’s response dated September 1, 2011, indicated that this sleeve was installed in 1989
over a bolted split sleeve that had been installed in 1978. Alyeska’s September 1st letter also
stated “To date, there have been no inspections or assessments completed at this location”.
This sleeve must be included in Alyeska’s integrity management program, and must be
investigated for corrosion. This particular sleeve presents a corrosion risk because water and
solids may accumulate inside of the barrel. Such water and solids may contribute to internal
corrosion, particularly because they may not be removed during maintenance pigging
operations. In addition, ILI tools cannot detect corrosion damage inside a barrel sleeve.
Given the corrosion risks, Alyeska should include this barrel sleeve in their internal corrosion
control program.
This probable violation is based on photographs, conversation, the information received from
Alyeska’s Government Letter No. 24186, and Alyeska’s IM-244, TAPS Integrity
Management Plan for High Consequence Areas.
2. § 195.579 What must I do to mitigate internal corrosion?
(b) Inhibitors. If you use corrosion inhibitors to mitigate internal corrosion,
you must –
(2) Use coupons or other monitoring equipment to determine the effectiveness
of the inhibitors in mitigating internal corrosion; and
Alyeska is not properly determining the effectiveness of their internal corrosion inhibitors.
The existing pipeline coupons used to monitor the effectiveness of corrosion inhibitors are
currently installed at high points in the pipeline that do not reflect conditions of the below-
ground pipeline segments. The below-ground segments differ because the heavier fluids
settle and wax and solids accumulate on the bottom of the pipe. The procedures, type and
quantity of inhibitor could be significantly different if coupons are measuring corrosion
activity in the below-ground segments of piping.
Alyeska uses corrosion inhibitors in the 36-inch diameter relief piping at Pump Station 07.
The suction and discharge relief lines are no longer connected to the relief valves at PS07.
These sections of crude piping are known as “dead legs” because they are part of the pipeline
system that experiences low or no flow. Dead legs are susceptible to internal corrosion.
These dead legs consist of both above-ground and below-ground segments. During the
2



inspection, OPS observed that the coupons used to monitor corrosion were only installed on
high points in the relief piping.
Alyeska’s Integrity Management Engineering Team gave a PowerPoint presentation of
Alyeska’s Internal Corrosion Program on June 24, 2010, at PHMSA’s Anchorage office.
The presentation provided Alyeska’s plans for mitigating internal corrosion in the 36” relief
dead legs at their Pump Stations, but did not make any representations about the dead legs at
PS07.
This probable violation is based on photographs, conversation, and the information presented
during Alyeska’s Internal Corrosion Program presentation on June 24, 2010.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of
$1,000,000 for any related series of violations. We have reviewed the circumstances and
supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct
the items identified in this letter. Failure to do so will result in Alyeska Pipeline Service
Company being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 5-2011-5021W and send all documents to our office at 188 W. Northern Lights
Blvd., Suite 520, Anchorage, AK 99503. Be advised that all material you submit in response
to this enforcement action is subject to being made publicly available. If you believe that
any portion of your responsive material qualifies for confidential treatment under 5 U.S.C.
552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 B. Flanders (#133348)
3
- **truncated:** false
- **body characters:** 7271