# OP RENO LLC — Warning Letter

- **operation:** document
- **citation:** CPF 520116003W
- **title:** OP RENO LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-01-20
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.432(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520116003w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520116003w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520116003w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520116003W
**body:**

Warning Letter involving OP RENO LLC. PHMSA's enforcement data identifies the cited regulation as 195.432(b). The case was opened on 2011-01-20 and is reported as closed as of 2011-01-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520116003W_warning letter_01202011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520116003W/520116003W_warning%20letter_01202011.pdf

520116003W_warning letter_01202011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520116003W/520116003W_warning%20letter_01202011_text.pdf

520116003W_warning letter_01202011_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 20, 2011
Mr. John Niemi
Manager LLC
OP Reno, LLC
1331 Christine Avenue, Suite 100
St. Louis, MO 63131
CPF 5-2011-6003W
Dear Mr. Niemi:
On February 25, 2010, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected your
Sparks Terminal in Sparks, Nevada.
As a result of the inspection, it appears that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The item inspected and the
probable violation is:
1. §195.432 Inspection of in-service breakout tanks.
(b) Each operator shall inspect the physical integrity of in-service atmospheric and
low-pressure steel above-ground breakout tanks according to section 4 of API



Standard 653. However, if structural conditions prevent access to the tank bottom,
the bottom integrity may be assessed according to a plan included in the operations
and maintenance manual under §195.402(c)(3).
The API Standard 653 inspections are late for two of your PHMSA regulated tanks. The last
API 653 internal inspections for Tanks 25007 and 27008 were performed in 1999. The next API
653 internal inspection was due in 2009. At the time of the inspection, the API 653 internal
inspections had not been completed for these tanks.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $100,000
for each violation for each day the violation persists up to a maximum of $1,000,000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item identified in this letter.
Failure to do so will result in OP Reno, LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-2011-6003W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 C. Allen (#129673)
2
- **truncated:** false
- **body characters:** 3475