{"operation":"document","citation":"CPF 520121018M","title":"NORTH BAJA PIPELINE LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-08-22","effective_on":null,"summary":"CLOSED notice of amendment citing 192.605(b)(8).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520121018m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520121018m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520121018m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520121018M","body":"Notice of Amendment involving NORTH BAJA PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 192.605(b)(8). The case was opened on 2012-08-22 and is reported as closed as of 2013-08-19. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520121018M_closure letter_08192013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520121018M/520121018M_closure%20letter_08192013.pdf\n\n520121018M_closure letter_08192013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520121018M/520121018M_closure%20letter_08192013_text.pdf\n\n520121018M_NOA_08222012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520121018M/520121018M_NOA_08222012.pdf\n\n520121018M_NOA_08222012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520121018M/520121018M_NOA_08222012_text.pdf\n\n520121018M_Operator Response_09282012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520121018M/520121018M_Operator%20Response_09282012.pdf\n\n520121018M_closure letter_08192013_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nAugust 19, 2013\nMr. Vern Meier\nVP, US Pipelines, Field Operations\nTransCanada Corporation\n717 Texas Avenue\nHouston, TX 77002\nCPF 5-2012-1018M\nClosure Letter\nDear Mr. Meier:\nOn August 30 to September 1, 2011, a representative from the Arizona Corporation Commission on\nbehalf of the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety\nAdministration (PHMSA, pursuant to chapter 601 of 49 United States Code, conducted an on-site\npipeline safety inspection of TransCanada Corporation procedures in your Ehrenberg Compressor\nStation in Western Arizona. As a result of the inspection, TransCanada Corporation was issued a\nNotice of Amendment on August 22, 2012, which proposed an amendment of your procedures.\nTransCanada Corporation submitted its amended procedures on September 28, 2012 and August\n15, 2013. My staff reviewed the amended procedures, and it appears that the inadequacies\noutlined in this Notice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nChris Hoidal\nDirector, Western\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 T. Finch (#133004)\nACC Robert Miller","truncated":false,"body_characters":2365}