{"operation":"document","citation":"CPF 520125012M","title":"CHEVRON PIPE LINE CO — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-04-24","effective_on":null,"summary":"CLOSED notice of amendment citing 195.446(a).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520125012m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520125012m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520125012m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520125012M","body":"Notice of Amendment involving CHEVRON PIPE LINE CO. PHMSA's enforcement data identifies the cited regulation as 195.446(a). The case was opened on 2012-04-24 and is reported as closed as of 2012-06-08. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520125012M_closure letter_060812.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520125012M/520125012M_closure%20letter_060812.pdf\n\n520125012M_closure letter_06082012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520125012M/520125012M_closure%20letter_06082012_text.pdf\n\n520125012M_NOA_04242012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520125012M/520125012M_NOA_04242012.pdf\n\n520125012M_NOA_04242012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520125012M/520125012M_NOA_04242012_text.pdf\n\n520125012M_Operator Response_05292012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520125012M/520125012M_Operator%20Response_05292012.pdf\n\n520125012M_closure letter_060812.pdf\n\nu.s. Department\nof Transportation\nPipeline and\nHazardous Materials Safety\nAdministration\nSENT ·n . .~.~ ,,\n·- ·(EGISTRY\nHardcOp) .. . · \"(Cally X #of Copie~J.....; lJatc k·~· !2.-\n12300 W. Dakota Ave., Suite 11 0\nLakewood, CO 80228\nCERTIFIED MAIL- RETURN RECEIPT REQUESTED\nJune 8, 2012\nMr. Randall Curry\nPresident\nChevron Pipe Line\n4800 Fournace Place\nBellaire, TX 77401\nCPF 5-2012-5012M\nDear Mr. Curry:\nOn December 5 through December 9, 2011, representatives from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) and the Washington Utilities and Transportation\nCommission (WUTC), pursuant to chapter 601 of 49 United States Code, conducted an on-\nsite pipeline safety inspection of Chevron Pipe Line's (Chevron) control room management\n(CRM) procedures in Houston, Texas. As a result of the inspection, Chevron was issued a\nNotice of Amendment on April24, 2012, which proposed amendment of your procedures.\nChevron submitted its amended procedures on May 29, 2012. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\n•.\n~~~\nF o(L Chris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 J. Davis (#136839)\n\n520125012M_closure letter_06082012_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nJune 8, 2012\nMr. Randall Curry\nPresident\nChevron Pipe Line\n4800 Fournace Place\nBellaire, TX 77401\nCPF 5-2012-5012M\nDear Mr. Curry:\nOn December 5 through December 9, 2011, representatives from the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) and the Washington Utilities and Transportation\nCommission (WUTC), pursuant to chapter 601 of 49 United States Code, conducted an on-\nsite pipeline safety inspection of Chevron Pipe Line’s (Chevron) control room management\n(CRM) procedures in Houston, Texas. As a result of the inspection, Chevron was issued a\nNotice of Amendment on April 24, 2012, which proposed amendment of your procedures.\nChevron submitted its amended procedures on May 29, 2012. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nChris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 J. Davis (#136839)","truncated":false,"body_characters":3682}