{"operation":"document","citation":"CPF 520126010M","title":"HAWAII ELECTRIC LIGHT — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-04-17","effective_on":null,"summary":"CLOSED notice of amendment citing 195.214(a), 195.402(a), 195.402(c)(7), 195.402(e)(2), 195.402(f), 195.52(c).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-520126010m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-520126010m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-520126010m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/520126010M","body":"Notice of Amendment involving HAWAII ELECTRIC LIGHT. PHMSA's enforcement data identifies the cited regulations as 195.214(a),  195.402(a),  195.402(c)(7),  195.402(e)(2),  195.402(f),  195.52(c). The case was opened on 2012-04-17 and is reported as closed as of 2012-08-16. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n520126010M_Closure Letter_08162012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126010M/520126010M_Closure%20Letter_08162012.pdf\n\n520126010M_closure letter_08162012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126010M/520126010M_closure%20letter_08162012_text.pdf\n\n520126010M_NOA_04172012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126010M/520126010M_NOA_04172012.pdf\n\n520126010M_NOA_04172012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126010M/520126010M_NOA_04172012_text.pdf\n\n520126010M_Operator_Response_and_Request_for_Time_Extension_05182012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126010M/520126010M_Operator_Response_and_Request_for_Time_Extension_05182012.pdf\n\n520126010M_closure letter_08162012_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nAugust 16, 2012\nMr. Jay M. Ignacio\nPresident\nHawaii Electric Light Company, Inc.\nP.O. Box 1027\nHilo, HI 96721-1027\nCPF 5-2012-6010M\nDear Mr. Ignacio:\nOn March 28 and 29, 2011, a representative from the Pipeline and Hazardous Materials\nSafety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,\nconducted an on-site pipeline safety inspection of Hawaii Electric Light Company, Inc.’s\n(HELCO) operations and maintenance procedures in Hilo, Hawaii. As a result of the\ninspection, HELCO was issued a Notice of Amendment on April 17, 2012, which proposed\namendment of your procedures.\nHELCO submitted its amended procedures on July 25, 2012. My staff reviewed the amended\nprocedures, and it appears that the inadequacies outlined in this Notice of Amendment have\nbeen corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nChris Hoidal\nDirector, Western Region\nPipeline and Hazardous Materials Safety Administration\ncc: PHP-60 Compliance Registry\nPHP-500 J. Davis (#133321)","truncated":false,"body_characters":2309}