# WESTERN MIDSTREAM PARTNERS, LP — Notice of Amendment

- **operation:** document
- **citation:** CPF 520131001M
- **title:** WESTERN MIDSTREAM PARTNERS, LP — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-01-09
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.631(a)(2), 192.631(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131001m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131001m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131001m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520131001M
**body:**

Notice of Amendment involving WESTERN MIDSTREAM PARTNERS, LP. PHMSA's enforcement data identifies the cited regulations as 192.631(a)(2),  192.631(b). The case was opened on 2013-01-09 and is reported as closed as of 2013-01-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520131001M_closure letter_01162013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131001M/520131001M_closure%20letter_01162013.pdf

520131001M_Closure Letter_01162013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131001M/520131001M_Closure%20Letter_01162013_text.pdf

520131001M_NOA_01092013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131001M/520131001M_NOA_01092013.pdf

520131001M_NOA_01092013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131001M/520131001M_NOA_01092013_text.pdf

520131001M_Closure Letter_01162013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 16, 2013
Mr. Danny Rea
Vice President, Midstream
Anadarko Petroleum Corporation
1201 Lake Robbins Drive
The Woodlands, TX 77380
CPF 5-2013-1001M
Closure Letter
Dear Mr. Rea:
On June 19 to 22, 2012, representatives from the Pipeline and Hazardous Materials Safety
Administration (PHMSA) and the Wyoming Public Service Commission, pursuant to chapter 601 of
49 United States Code, conducted an on-site pipeline safety inspection of Anadarko Petroleum
Corporation’s (Anadarko) procedures for their Control Room Management (CRM). The inspection
was conducted in Gillette, Wyoming. As a result of the inspection, Anadarko was issued a Notice of
Amendment on January 9, 2013, which proposed amendment of your procedures.
Anadarko submitted its amended procedures on January 11, 2013. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Kenerson (#139189)
- **truncated:** false
- **body characters:** 2184
