# KERN RIVER GAS TRANSMISSION CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 520131006M
- **title:** KERN RIVER GAS TRANSMISSION CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-04-25
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.463(a), 192.605(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131006m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131006m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-520131006m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/520131006M
**body:**

Notice of Amendment involving KERN RIVER GAS TRANSMISSION CO. PHMSA's enforcement data identifies the cited regulations as 192.463(a),  192.605(b)(2). The case was opened on 2013-04-25 and is reported as closed as of 2013-05-28. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520131006M_closure letter_05282013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131006M/520131006M_closure%20letter_05282013.pdf

520131006M_closure letter_05282013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131006M/520131006M_closure%20letter_05282013_text.pdf

520131006M_notice of amendment_04252013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131006M/520131006M_notice%20of%20amendment_04252013.pdf

520131006M_notice of amendment_04252013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131006M/520131006M_notice%20of%20amendment_04252013_text.pdf

520131006M_Operator Response_05232013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520131006M/520131006M_Operator%20Response_05232013.pdf

520131006M_closure letter_05282013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 28, 2013
Mr. Robert Checketts
Vice President – Operations, IT and Engineering
Kern River Gas Transmission Company
2755 East Cottonwood Parkway
Salt Lake City, UT 84121
CPF 5-2013-1006M
Dear Mr. Checketts:
On April 9-11, 2013, representatives from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an
on-site pipeline safety inspection of Kern River Gas Transmission (KRGT) procedures in Salt
Lake City, UT. As a result of the inspection, KRGT was issued a Notice of Amendment on
April 25, 2013, which proposed amendment of your procedures.
KRGT submitted its amended procedures on May 23, 2013. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Mulligan

520131006M_notice of amendment_04252013_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 25, 2013
Mr. Robert Checketts
Vice President – Operations, IT and Engineering
Kern River Gas Transmission Company
2755 East Cottonwood Parkway
Salt Lake City, UT 84121
CPF 5-2013-1006M
Dear Mr. Checketts:
On April 9-11, representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA)
pursuant to Chapter 601 of 49 United States Code inspected Kern River Gas Transmission Company’s
procedures for operations, maintenance, and emergency response in Salt Lake City, UT.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within Kern River
Gas Transmission Company’s (KRGT) plans or procedures, as described below:
1. §192.605 Procedural manual for operations, maintenance, and emergencies.
(b) Maintenance and normal operations. The manual required by paragraph (a) of this
section must include procedures for the following, if applicable, to provide safety during
maintenance and operations.
(2) Controlling corrosion in accordance with the operations and maintenance requirements
of Subpart I of this part.
§192.463 External corrosion control: Cathodic protection.
(a) Each cathodic protection system required by this subpart must provide a level of
cathodic protection that complies with one or more of the applicable criteria contained in
Appendix D of this part. If none of these criteria is applicable, the cathodic protection
system must provide a level of cathodic protection at least equal to that provided by
compliance with one or more of these criteria.



At the time of the inspection, KRGT’s Establishing Cathodic Protection Criteria, Corrosion Control
Procedures 20.06.03, did not include IR drop consideration in accordance with Appendix D, Section II.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as part of
this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all material
you submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C.
552(b), along with the complete original document you must provide a second copy of the document with
the portions you believe qualify for confidential treatment redacted and an explanation of why you
believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not
respond within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as
alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this Notice,
you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R. § 190.237).
If you are not contesting this Notice, we propose that you submit your amended procedures to my office
within 30 days of receipt of this Notice. This period may be extended by written request for good cause.
Once the inadequacies identified herein have been addressed in your amended procedures, this
enforcement action will be closed.
It is requested (not mandated) that KRGT maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and
submit the total to Chris Hoidal, Director, Western Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 5-2013-1006M and, for
each document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Mulligan (#142073)
2
- **truncated:** false